Hornet Solar (TX)
Country Road 2, Tulia, TX 79088Plant Summary Information
Hornet Solar (TX) is ranked #2 out of 7,027 solar farms nationwide in terms of total annual net electricity generation.
Hornet Solar (TX) generated 487.4 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Hornet Solar (TX) |
|---|---|
| Utility Name | Vesper Energy Development LLC |
| Location | Swisher County, TX |
| Initial Operation Date | April 2025 |
| Last Update | Jun 2026 |
| Annual Generation | 1.6 TWh |
| Annual Consumption | 6.0 M MMBtu |
| Ranked #572 out of 13,094 Power Plants Nationwide | |
| Ranked #2 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #87 out of 858 Texas Power Plants | |
| Ranked #1 out of 251 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Hornet Solar (TX)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hornet Solar (TX).
Monthly Net Generation for Hornet Solar (TX)
Monthly Plant Fuel Consumption for Hornet Solar (TX)
Hornet Solar (TX) Details
| Summary Information | |
|---|---|
| Plant Name | Hornet Solar (TX) (65463) |
| Plant Address | Country Road 2, Tulia, TX 79088 |
| Utility | Vesper Energy Development LLC (64545) |
| Latitude, Longitude | 34.48516, -101.9714 |
| Generation Dates on File | Apr 2025 to Jun 2026 |
| Initial Operation Date | April 2025 |
| Annual Generation | 1.6 TWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator HRNET Details Operating April 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 600 MW |
| Summer Capacity | 600 MW |
| Winter Capacity | 600 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Dual Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| DC Net Capacity | 745 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Hornet Solar (TX) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1 | Gemini Solar Hybrid | Unincorporated, NV | 2.1 TWh |
| #3 | Hecate Energy Frye Solar LLC | Kress, TX | 1.3 TWh |
| #4 | Fox Squirrel Solar | Mt Sterling, OH | 1.2 TWh |
| #5 | Faraday Solar | Fairfield, UT | 1.1 TWh |
| #6 | Sonoran Solar Energy | Buckeye, AZ | 1.1 TWh |
| #7 | Hecate Energy Outpost Solar LLC | Laredo, TX | 1.1 TWh |
| #8 | Roseland Solar Project, LLC | Riesel, TX | 1.1 TWh |
| #9 | Aktina Solar | El Campo, TX | 1.1 TWh |
| #10 | Roadrunner, LLC Hybrid | McCamey, TX | 1.0 TWh |
| #11 | Double Back Diamond | Virden, IL | 1.0 TWh |
| #12 | 2W Permian Solar Project Hybrid | Andrews, TX | 1.0 TWh |
| #13 | Mockingbird Solar Center | Brookston, TX | 985.8 GWh |
| #14 | Topaz Solar Farm | Santa Margarita, CA | 969.2 GWh |
| #15 | Danish Fields Solar, LLC | El Campo, TX | 922.9 GWh |
| #16 | Eagle Shadow Mountain Solar Farm | Moapa, NV | 912.1 GWh |
| #17 | Harquahala 2 | Tonopah, AZ | 845.1 GWh |
| #18 | Solar Star 1 | Rosamond, CA | 888.9 GWh |
| #19 | Old 300 Solar Center, LLC | Needville, TX | 882.5 GWh |
| #20 | Box Canyon (AZ) | Florence, AZ | 869.9 GWh |
| #21 | Desert Quartzite | Blythe, CA | 852.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hornet Solar (TX).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antelope Station | Abernathy, TX | 296.6 GWh | 43.5 mi |
| Astra Wind Farm | Happy, TX | 539.2 GWh | 20.2 mi |
| Bethel Wind Farm LLC | Dimmitt, TX | 1.1 TWh | 29.3 mi |
| Blue Cloud Wind Energy LLC | Sudan, TX | 564.8 GWh | 50.2 mi |
| Briscoe Wind Farm | Silverton, TX | 420.8 GWh | 42 mi |
| Canadian Breaks, LLC | Vega, TX | 812.1 GWh | 53.1 mi |
| Elk Station | Abernathy, TX | 890.9 GWh | 43.5 mi |
| Hale Community Wind Farm | Plainview, TX | 2.0 TWh | 40.7 mi |
| Hart Wind | Hart, TX | 771.9 GWh | 8.7 mi |
| Hecate Energy Frye Solar LLC | Kress, TX | 1.3 TWh | 22 mi |
| Longhorn Wind | Silverton, TX | 683.8 GWh | 42.8 mi |
| Mariah del Norte | Friona, TX | 840.8 GWh | 36.7 mi |
| Plant X | Earth, TX | 815.7 GWh | 33.4 mi |
| Plant X Solar | Earth, TX | 122.9 GWh | 33.2 mi |
| South Plains II | Lockney, TX | 1.1 TWh | 39.1 mi |
| South Plains Wind Phase I | Floydada, TX | 724.7 GWh | 46.4 mi |
| Tolk | Muleshoe, TX | 3.0 TWh | 39.9 mi |
| TX Hereford Wind | Hereford, TX | 598.6 GWh | 21.5 mi |
| TX Jumbo Road Wind | Hereford, TX | 554.8 GWh | 22.8 mi |
| UL Advanced Wind Turbine Test Facility | Canyon, TX | 12.0 GWh | 34.9 mi |