Fighting Jays Solar Project
TBD, Needville, TX 77461Plant Summary Information
Fighting Jays Solar Project is ranked #57 out of 201 solar farms in Texas in terms of total annual net electricity generation.
Fighting Jays Solar Project generated 159.7 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Fighting Jays Solar Project |
|---|---|
| Utility Name | AP Solar 2, LLC |
| Location | Fort Bend County, TX |
| Initial Operation Date | June 2022 |
| Last Update | Sep 2025 |
| Annual Generation | 403.5 GWh |
| Annual Consumption | 1.5 M MMBtu |
| Ranked #1,564 out of 12,539 Power Plants Nationwide | |
| Ranked #152 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #314 out of 799 Texas Power Plants | |
| Ranked #57 out of 201 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Fighting Jays Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fighting Jays Solar Project.
Monthly Net Generation for Fighting Jays Solar Project
Fighting Jays Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Fighting Jays Solar Project (62945) |
| Plant Address | TBD, Needville, TX 77461 |
| Utility | AP Solar 2, LLC (62794) |
| Latitude, Longitude | 29.35843, -95.74639 |
| Generation Dates on File | Jul 2022 to Sep 2025 |
| Initial Operation Date | June 2022 |
| Annual Generation | 403.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 20210920-5015 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator FJSOL Details Operating June 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 227.5 MW |
| Summer Capacity | 227.5 MW |
| Winter Capacity | 227.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 350 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Fighting Jays Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #142 | Misae Solar | Childress, TX | 418.4 GWh |
| #143 | Chestnut | Lemoore, CA | 390.8 GWh |
| #144 | Cutlass Solar II | Richmond, TX | 411.9 GWh |
| #145 | Wright Solar Park | Los Banos, CA | 411.4 GWh |
| #146 | Mount Signal Solar Farm II | Calexico, CA | 410.2 GWh |
| #147 | Crane Solar Project | Crane, TX | 407.8 GWh |
| #148 | Mustang Two | Lemoore, CA | 406.5 GWh |
| #149 | Sun Streams, LLC | Arlington, AZ | 405.6 GWh |
| #150 | North Rosamond Solar LLC | Rosamond, CA | 405.3 GWh |
| #151 | Angelo Solar | San Angelo, TX | 405.2 GWh |
| #153 | Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh |
| #154 | Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh |
| #155 | Riverstart Solar Park LLC | Modoc, IN | 398.0 GWh |
| #156 | Yellow Pine Solar | Enterprise, NV | 384.7 GWh |
| #157 | Big Plain Solar, LLC | London, OH | 397.5 GWh |
| #158 | Crooked Lake Solar, LLC | Blytheville, AR | 396.5 GWh |
| #159 | 7V Solar Ranch | Muldoon, TX | 396.1 GWh |
| #160 | Yellow Pine II | Enterprise, NV | 378.9 GWh |
| #161 | TS Power Plant | Battle Mountain, NV | 1.6 TWh |
| #162 | Sherco Solar I | Clear Lake, MN | 392.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fighting Jays Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Braes Bayou Plant | Richmond, TX | 224.8 GWh | 11.3 mi |
| Brazoria County Solar Project (Danciger) | Damon, TX | 423.6 GWh | 12.5 mi |
| Brazoria West | Damon, TX | 426.8 GWh | 12.6 mi |
| Bronson | Beasley, TX | 9.6 GWh | 18.3 mi |
| Brotman Power Station | Rosharon, TX | 357.6 GWh | 18.8 mi |
| Cutlass Solar 1 LLC | Richmond, TX | 171.2 GWh | 3.6 mi |
| Cutlass Solar II | Richmond, TX | 411.9 GWh | 3 mi |
| FTBLID2 | Sugarland, TX | 130.0 MWh | 16.4 mi |
| HEB00110 | Missouri City, TX | 179.0 MWh | 17.6 mi |
| Jack Fusco Energy Center | Thompsons, TX | 3.4 TWh | 10.8 mi |
| Mckeever | Fresno, TX | 187.0 MWh | 19.1 mi |
| Newgulf Cogen | NewGulf, TX | 12.7 GWh | 11.3 mi |
| Old 300 Solar Center, LLC | Needville, TX | 984.2 GWh | 5.1 mi |
| Petra Nova Carbon Capture Cogen | Thompsons, TX | 200.8 GWh | 10.5 mi |
| Second Division Solar | West Columbia, TX | 164.2 GWh | 13 mi |
| Sweeny Cogen Facility | Old Ocean, TX | 3.3 TWh | 19.7 mi |
| W A Parish | Thompsons, TX | 15.4 TWh | 11 mi |
| Wagyu | Damon, TX | 232.0 GWh | 9.6 mi |
| WAL2993 | Sugar Land, TX | 255.0 MWh | 18.7 mi |
| WAL546 | Richmond, TX | 178.0 MWh | 13.8 mi |