Quitman II Solar
7015 Barwick Rd, Quitman, GA 31643Plant Summary Information
Quitman II Solar is ranked #38 out of 251 power plants in Georgia in terms of total annual net electricity generation.
Quitman II Solar generated 77.0 GWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Quitman II Solar |
|---|---|
| Utility Name | Quitman II Solar, LLC |
| Location | Brooks County, GA |
| Initial Operation Date | December 2021 |
| Last Update | Nov 2025 |
| Annual Generation | 315.4 GWh |
| Annual Consumption | 1.1 M MMBtu |
| Ranked #1,916 out of 12,574 Power Plants Nationwide | |
| Ranked #244 out of 6,426 Solar Power Plants Nationwide | |
| Ranked #38 out of 251 Georgia Power Plants | |
| Ranked #9 out of 152 Georgia Solar Power Plants | |
| Fuel Types | Solar |
Map of Quitman II Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Quitman II Solar.
Monthly Net Generation for Quitman II Solar
Quitman II Solar Details
| Summary Information | |
|---|---|
| Plant Name | Quitman II Solar (64335) |
| Plant Address | 7015 Barwick Rd, Quitman, GA 31643 |
| Utility | Quitman II Solar, LLC (63957) |
| Latitude, Longitude | 30.86205, -83.65165 |
| Generation Dates on File | Sep 2021 to Nov 2025 |
| Initial Operation Date | December 2021 |
| Annual Generation | 315.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Georgia Transmission Corp (7197) |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator QUIT2 Details Operating December 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 150 MW |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 210 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Quitman II Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #234 | South Cheyenne Solar | South Greeley, WY | 324.2 GWh |
| #235 | Edwards Sanborn E4 | Mojave, CA | 319.3 GWh |
| #236 | Ray Ranch Solar | Pettus, TX | 323.8 GWh |
| #237 | Cove Mountain Solar 2 | Beryl, UT | 321.7 GWh |
| #238 | Quitman Solar | Quitman, GA | 320.6 GWh |
| #239 | Umbriel Solar | Livington, TX | 320.3 GWh |
| #240 | Serrano | Marana, AZ | 305.1 GWh |
| #241 | Cass County Renewable Energy Center | Beardstown, IL | 320.0 GWh |
| #242 | Lily Solar Hybrid | Scurry, TX | 316.6 GWh |
| #243 | Elora Solar | Elora, TN | 316.3 GWh |
| #245 | Big River Solar | Norris City, IL | 315.4 GWh |
| #246 | Morris Ridge Solar | Mount Morris, NY | 314.1 GWh |
| #247 | Edwards Sanborn E2 | Mojave, CA | 300.1 GWh |
| #248 | Wolf Run Solar | Chapin, IL | 313.8 GWh |
| #249 | Washington County Solar | Sandersville, GA | 313.8 GWh |
| #250 | Storey Solar and Storage | Coolidge, AZ | 299.8 GWh |
| #251 | Cavalier Solar | Smithfield, VA | 311.4 GWh |
| #252 | SR DeSoto I, LLC | DeSoto, GA | 310.4 GWh |
| #253 | Fort Powhatan Solar | Disputanta, VA | 308.5 GWh |
| #254 | Drew Solar LLC | Calexico, CA | 308.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Quitman II Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Cairo Solar Farm, LLC | Cairo, GA | 3.3 GWh | 34.4 mi |
| Camilla Solar Plant | Pelham, GA | 26.2 GWh | 36.1 mi |
| Denver Braswell PV | Moultrie, GA | 614.0 MWh | 31.5 mi |
| Hamilton Solar Power Plant | Jasper, FL | 182.3 GWh | 39.9 mi |
| Lakeland Solar Energy LLC | Lakeland, GA | 3.4 GWh | 37.1 mi |
| Lowndes Cowart | Valdosta, GA | 6.8 GWh | 23.5 mi |
| Lowndes IDA | Valdosta, GA | 3.1 GWh | 25.2 mi |
| Lowndes Tycor Farms | Lake Park, GA | 4.6 GWh | 31.2 mi |
| Moody Air Force Base Solar | Valdosta, GA | 88.4 GWh | 26.3 mi |
| Norton Creek | TBD, FL | 185.4 GWh | 37.4 mi |
| OE_GA3 | Camilla, GA | 125.1 GWh | 37.3 mi |
| Oil Dri 2 Solar | Ochlocknee, GA | 2.9 GWh | 26.1 mi |
| PCA-Valdosta Mill | Valdosta, GA | 322.6 GWh | 23.7 mi |
| Pecan Row Landfill To Electric Facility | Valdosta, GA | 30.5 GWh | 17.5 mi |
| Quitman Solar | Quitman, GA | 320.6 GWh | 1 mi |
| SR Odom | Moultrie, GA | 44.7 GWh | 14.7 mi |
| Valdosta | Valdosta, GA | 1.4 GWh | 25.5 mi |
| Valdosta Prison | Valdosta, GA | 1.7 GWh | 21 mi |
| Valdosta Water Treatment Plant | Valdosta, GA | 52.0 MWh | 23.9 mi |
| Vidalia Water Treatment Plant | Hahira, GA | 1.4 GWh | 20 mi |