Directory of Power Plants in Florida
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| FPL Chipola River Solar Energy Center | Florida Power & Light Co | Altha, FL | Florida Power & Light Co. (FPL) | 145.3 GWh | Dec 2022 | May 2026 | Solar |
| FPL Cypress Pond Solar | Florida Power & Light Co | Vernon, FL | Florida Power & Light Co. (FPL) | 170.9 GWh | Mar 2023 | May 2026 | Solar |
| FPL Etonia Creek | Florida Power & Light Co | Palatka, FL | Florida Power & Light Co. (FPL) | 165.0 GWh | Mar 2023 | May 2026 | Solar |
| FPL Flowers Creek Solar Energy Center | Florida Power & Light Co | Altha, FL | Florida Power & Light Co. (FPL) | 138.4 GWh | Dec 2022 | May 2026 | Solar |
| FPL Saw Palmetto Solar Energy Center | Florida Power & Light Co | Youngstown, FL | Florida Power & Light Co. (FPL) | 177.2 GWh | Mar 2023 | May 2026 | Solar |
| FPL Shirer Branch Solar Energy Center | Florida Power & Light Co | Clarksville, FL | Florida Power & Light Co. (FPL) | 169.8 GWh | Jan 2023 | May 2026 | Solar |
| G2 Energy Marion LLC | G2 Energy LLC | Ocala, FL | Duke Energy Florida, Inc. (FPC) | 18.0 MWh | Dec 2008 | Dec 2025 | Landfill Gas |
| Gadsden County Solar | FRP Gadsden County Solar, LLC | Chattahoochee, FL | Duke Energy Florida, Inc. (FPC) | 185.9 GWh | Oct 2024 | May 2026 | Solar |
| Georges Lake | Florida Power & Light Co | TBD, FL | Florida Power & Light Co. (FPL) | 180.4 GWh | Oct 2024 | May 2026 | Solar |
| Georgia-Pacific Palatka Operations | Georgia-Pacific Consr Ops LLC-Palatka | Palatka, FL | Florida Power & Light Co. (FPL) | 331.4 GWh | May 1956 | Dec 2025 | Black Liquor : 58.1% Natural Gas : 41.9% |
| Ghost Orchid Solar Energy Center | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 146.1 GWh | Dec 2021 | May 2026 | Solar |
| Gilchrist County Solar | FRP Gilchrist County Solar, LLC | Newberry, FL | Duke Energy Florida, Inc. (FPC) | 191.7 GWh | Oct 2024 | May 2026 | Solar |
| Goldenrod | Florida Power & Light Co | Immokalee, FL | Florida Power & Light Co. (FPL) | 82.5 GWh | - | May 2026 | Solar |
| Goldfinch | Goldfinch (Lakeland) | Lakeland, FL | Florida Municipal Power Pool (FMPP) | 4.8 GWh | Nov 2016 | Dec 2025 | Solar |
| Grange Hall Solar | Tampa Electric Co | Wimauma, FL | Tampa Electric Company (TEC) | 120.3 GWh | Dec 2018 | May 2026 | Solar |
| Green Pasture | Florida Power & Light Co | TBD, FL | Florida Power & Light Co. (FPL) | 186.6 GWh | Dec 2024 | May 2026 | Solar |
| Greenland Energy Center | JEA | Jacksonville, FL | JEA (JEA) | 658.1 GWh | May 2011 | Dec 2025 | Natural Gas : 99.5% |
| Grove | Florida Power & Light Co | Vero Beach, FL | Florida Power & Light Co. (FPL) | 143.9 GWh | Dec 2021 | May 2026 | Solar |
| Gulf Clean Energy Center | Florida Power & Light Co | Pensacola, FL | Florida Power & Light Co. (FPL) | 1.9 TWh | Jun 1959 | May 2026 | Natural Gas |
| Gulf Coast Solar Center I | Arevon Energy, Inc. | Valparaiso, FL | Southern Company Services, Inc. - Trans (SOCO) | 60.4 GWh | May 2017 | May 2026 | Solar |
| Gulf Coast Solar Center II | Arevon Energy, Inc. | Navarre, FL | Southern Company Services, Inc. - Trans (SOCO) | 80.8 GWh | Oct 2017 | May 2026 | Solar |
| Gulf Coast Solar Center III | Arevon Energy, Inc. | Bellview, FL | Southern Company Services, Inc. - Trans (SOCO) | 97.2 GWh | Oct 2017 | May 2026 | Solar |
| Gulf Power Blue Indigo Energy | Florida Power & Light Co | Cottondale, FL | Florida Power & Light Co. (FPL) | 139.1 GWh | Mar 2020 | May 2026 | Solar |
| H L Culbreath Bayside Power Station | Tampa Electric Co | Tampa, FL | Tampa Electric Company (TEC) | 7.0 TWh | Oct 1965 | May 2026 | Natural Gas |
| Half Moon Solar Plant | Duke Energy Florida, LLC | Lake Panasoffkee, FL | Duke Energy Florida, Inc. (FPC) | 102.8 GWh | Oct 2025 | May 2026 | Solar |
| Hamilton Solar Power Plant | Duke Energy Florida, LLC | Jasper, FL | Duke Energy Florida, Inc. (FPC) | 172.6 GWh | Nov 2018 | May 2026 | Solar |
| Hammock Solar | Florida Power & Light Co | Labelle, FL | Florida Power & Light Co. (FPL) | 143.0 GWh | Feb 2018 | May 2026 | Solar |
| Hardee Power Station | Invenergy Services LLC | Bowling Green, FL | Tampa Electric Company (TEC) | 984.0 GWh | Dec 1992 | May 2026 | Natural Gas : 99.8% |
| Hardeetown Solar Power Plant | Duke Energy Florida, LLC | Chiefland, FL | Duke Energy Florida, Inc. (FPC) | 171.4 GWh | Mar 2023 | May 2026 | Solar |
| Harmony Florida Solar II | Harmony Florida Solar II, LLC | Kissimmee, FL | Duke Energy Florida, Inc. (FPC) | 180.4 GWh | Nov 2024 | May 2026 | Solar |
| Harmony Solar (FL) | Harmony Florida Solar LLC | St. Cloud, FL | Florida Municipal Power Pool (FMPP) | 175.9 GWh | May 2020 | May 2026 | Solar |
| Hawthorne Creek | Florida Power & Light Co | TBD, FL | Florida Power & Light Co. (FPL) | 164.9 GWh | Feb 2024 | May 2026 | Solar |
| Hecate Energy Blair Road LLC | Hecate Energy Blair Road LLC | Jacksonville, FL | JEA (JEA) | 5.8 GWh | Dec 2017 | Dec 2025 | Solar |
| Hendry Isles | Florida Power & Light Co | TBD, FL | Florida Power & Light Co. (FPL) | 176.8 GWh | Oct 2024 | May 2026 | Solar |
| Hernando | Hernando Energy | Brooksville, FL | Seminole Electric Cooperative (SEC) | 4.7 GWh | Jan 2010 | Dec 2024 | Landfill Gas |
| Hibiscus Solar Energy Center | Florida Power & Light Co | Westlake, FL | Florida Power & Light Co. (FPL) | 145.3 GWh | Mar 2020 | May 2026 | Solar |
| High Springs Solar Power Plant | Duke Energy Florida, LLC | High Springs, FL | Duke Energy Florida, Inc. (FPC) | 162.4 GWh | Mar 2023 | May 2026 | Solar |
| Hildreth Solar Power Plant | Duke Energy Florida, LLC | O'Brien, FL | Duke Energy Florida, Inc. (FPC) | 176.5 GWh | Feb 2023 | May 2026 | Solar |
| Hillsborough County Resource Recovery | Hillsborough County - (FL) | Tampa, FL | Tampa Electric Company (TEC) | 217.0 GWh | Mar 1987 | May 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Hines Energy Complex | Duke Energy Florida, LLC | Bartow, FL | Duke Energy Florida, Inc. (FPC) | 11.3 TWh | Mar 1999 | May 2026 | Natural Gas |
| Hog Bay | Florida Power & Light Co | TBD, FL | Florida Power & Light Co. (FPL) | 189.1 GWh | Dec 2024 | May 2026 | Solar |
| Holopaw | Florida Power & Light Co | TBD, FL | Florida Power & Light Co. (FPL) | 182.3 GWh | Dec 2024 | May 2026 | Solar |
| Honeybell | Florida Power & Light Co | TBD, FL | Florida Power & Light Co. (FPL) | 191.0 GWh | Oct 2024 | May 2026 | Solar |
| Horizon Solar Energy Center | Florida Power & Light Co | Hawthorne, FL | Florida Power & Light Co. (FPL) | 136.7 GWh | Dec 2017 | May 2026 | Solar |
| Ibis | Florida Power & Light Co | Palm Bay, FL | Florida Power & Light Co. (FPL) | 142.6 GWh | Dec 2023 | May 2026 | Solar |
| IKEA Jacksonville Rooftop PV System | IKEA Property Inc | Jacksonville, FL | JEA (JEA) | 2.1 GWh | Oct 2017 | Dec 2025 | Solar |
| IKEA Miami 327 | IKEA Property Inc | Miami, FL | Florida Power & Light Co. (FPL) | 1.2 GWh | Aug 2015 | Jun 2025 | Solar |
| Imeson Solar | Imeson Solar Farm LLC | Jscksonville, FL | JEA (JEA) | 12.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Immokalee | Florida Power & Light Co | Immokalee, FL | Florida Power & Light Co. (FPL) | 157.9 GWh | Dec 2021 | May 2026 | Solar |
| Indian River Plant | Orlando Utilities Comm | Titusville, FL | Florida Municipal Power Pool (FMPP) | 4.3 GWh | Jun 1989 | Dec 2025 | Natural Gas |
| Indian River Solar Center | Florida Power & Light Co | Vero Beach, FL | Florida Power & Light Co. (FPL) | 139.3 GWh | Dec 2017 | May 2026 | Solar |
| Intercession City | Duke Energy Florida, LLC | Intercession City, FL | Duke Energy Florida, Inc. (FPC) | 228.7 GWh | Apr 1974 | May 2026 | Natural Gas : 92.1% Distillate Fuel Oil : 7.9% |
| International Paper Pensacola | International Paper Co-Pensacola | Cantonment, FL | Southern Company Services, Inc. - Trans (SOCO) | 348.5 GWh | Dec 1980 | Dec 2025 | Black Liquor : 56.9% Wood/Wood Waste Solids : 34.2% Natural Gas : 8.9% |
| Interstate Solar Energy Center | Florida Power & Light Co | Ft. Pierce, FL | Florida Power & Light Co. (FPL) | 131.6 GWh | Dec 2018 | May 2026 | Solar |
| J D Kennedy | JEA | Jacksonville, FL | JEA (JEA) | 311.0 GWh | May 2000 | Dec 2025 | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
| J Woodruff | USCE-Mobile District | Chattahoochee, FL | Florida Power & Light Co. (FPL) | 228.5 GWh | Jan 2001 | Dec 2025 | Water |
| Jacksonville Solar | Jacksonville Solar LLC | Jacksonville, FL | JEA (JEA) | 8.8 GWh | Mar 2010 | Dec 2025 | Solar |
| Jamison Solar (FL) | Tampa Electric Co | Mulberry, FL | Tampa Electric Company (TEC) | 137.5 GWh | Mar 2022 | May 2026 | Solar |
| Jax LNG | Jax LNG | Jacksonville, FL | JEA (JEA) | 36.6 GWh | Sep 2018 | Dec 2025 | Natural Gas |
| JED Solid Waste Mgmt Renewable Energy | LMS Energy USA LLC | St. Cloud, FL | Duke Energy Florida, Inc. (FPC) | 37.1 GWh | Feb 2017 | Dec 2025 | Landfill Gas |
| John Hopkins Middle School Microgrid | Duke Energy Florida, LLC | St Petersburg, FL | Duke Energy Florida, Inc. (FPC) | 1.3 GWh | Aug 2023 | Dec 2025 | Solar : 99.7% |
| John R Kelly | Gainesville Regional Utilities | Gainesville, FL | Gainesville Regional Utilities (GVL) | 680.1 GWh | Mar 1965 | Dec 2025 | Natural Gas |
| Jumper Creek Solar Plant | Duke Energy Florida, LLC | Lake Panasoffkee, FL | Duke Energy Florida, Inc. (FPC) | 28.0 GWh | - | May 2026 | Solar |
| Juniper Solar (FL) | Tampa Electric Co | Zephyrhills, FL | Tampa Electric Company (TEC) | 143.9 GWh | Nov 2023 | May 2026 | Solar |
| Kayak | Florida Power & Light Co | TBD, FL | Florida Power & Light Co. (FPL) | 170.8 GWh | Nov 2024 | May 2026 | Solar |
| Lake Hancock Solar | Tampa Electric Co | Bartow, FL | Tampa Electric Company (TEC) | 92.2 GWh | Mar 2019 | May 2026 | Solar |
| Lake Mabel Solar and Battery Storage | Tampa Electric Co | Lake Wales, FL | Tampa Electric Company (TEC) | 133.5 GWh | Nov 2023 | May 2026 | Solar |
| Lake Placid Solar Power Plant | Duke Energy Florida, LLC | Lake Placid, FL | Duke Energy Florida, Inc. (FPC) | 86.6 GWh | Nov 2019 | May 2026 | Solar |
| Lakeland Electric Co. (FL)-Airport 1 | SunE W12DG-B, LLC | Lakeland, FL | Tampa Electric Company (TEC) | 2.3 GWh | Nov 2011 | Dec 2025 | Solar |
| Lakeland Electric Co. (FL) - Airport II | Sun E N7 Holdings LLC | Lakeland, FL | Tampa Electric Company (TEC) | 2.2 GWh | Aug 2012 | Dec 2024 | Solar |
| Lakeside Solar Center | Florida Power & Light Co | Okeechobee, FL | Florida Power & Light Co. (FPL) | 144.6 GWh | Nov 2020 | May 2026 | Solar |
| Lansing Smith | Florida Power & Light Co | Southport, FL | Florida Power & Light Co. (FPL) | 3.7 TWh | May 1965 | May 2026 | Natural Gas |
| Larsen Memorial | City of Lakeland - (FL) | Lakeland, FL | Florida Municipal Power Pool (FMPP) | 159.2 GWh | Mar 1956 | Dec 2025 | Natural Gas : 98.8% Distillate Fuel Oil : 1.2% |
| Lauderdale | Florida Power & Light Co | Ft. Lauderdale, FL | Florida Power & Light Co. (FPL) | 251.8 GWh | Sep 1957 | May 2026 | Natural Gas : 95.5% Distillate Fuel Oil : 4.5% |
| Laurel Oaks Solar | Tampa Electric Co | Plant City, FL | Tampa Electric Company (TEC) | 122.0 GWh | Nov 2022 | May 2026 | Solar |
| Lee County Solid Waste Energy | Lee County Board-Commissioners | Fort Myers, FL | Florida Power & Light Co. (FPL) | 315.4 GWh | Aug 1994 | May 2026 | Non-biogenic Municipal Solid Waste : 54.7% Biogenic Municipal Solid Waste : 44.7% Gaseous Propane : 0.6% |
| Legoland Solar | Tampa Electric Co | Winter Haven, FL | Tampa Electric Company (TEC) | 2.2 GWh | Nov 2016 | Sep 2025 | Solar |
| Lithia Solar | Tampa Electric Co | Lithia, FL | Tampa Electric Company (TEC) | 141.1 GWh | Dec 2018 | May 2026 | Solar |
| Little Manatee River Solar | Tampa Electric Co | Ruskin, FL | Tampa Electric Company (TEC) | 105.3 GWh | Jan 2020 | May 2026 | Solar |
| LKL BLBD, LLC | LKL BLBD, LLC | Lakeland, FL | Florida Municipal Power Pool (FMPP) | 9.8 GWh | Jul 2015 | Dec 2025 | Solar |
| Lockheed Martin Solar | Lockheed Martin RMS | Orlando, FL | Duke Energy Florida, Inc. (FPC) | 2.1 GWh | Sep 1998 | Dec 2025 | Solar : 97.8% Distillate Fuel Oil : 2.2% |
| Lockheed Martin Solar System | Lockheed Martin Solar System | Oldsmar, FL | Duke Energy Florida, Inc. (FPC) | 2.9 GWh | Aug 2015 | Dec 2024 | Solar |
| Loggerhead Solar Energy Center | Florida Power & Light Co | Port St. Lucie, FL | Florida Power & Light Co. (FPL) | 132.4 GWh | Feb 2018 | May 2026 | Solar |
| Long Branch Solar | Tampa Electric Co | Parrish, FL | Tampa Electric Company (TEC) | 46.2 GWh | - | May 2026 | Solar |
| Long Creek | Florida Power & Light Co | TBD, FL | Florida Power & Light Co. (FPL) | 178.2 GWh | Dec 2024 | May 2026 | Solar |
| Magnolia Solar | Tampa Electric Co | Mulberry, FL | Tampa Electric Company (TEC) | 143.3 GWh | Nov 2021 | May 2026 | Solar |
| Magnolia Springs Solar Center | Florida Power & Light Co | Green Cove Springs, FL | Florida Power & Light Co. (FPL) | 135.1 GWh | Feb 2021 | May 2026 | Solar |
| Mallard | Florida Power & Light Co | Palm Bay, FL | Florida Power & Light Co. (FPL) | 78.1 GWh | - | May 2026 | Solar |
| Manatee | Florida Power & Light Co | Parrish, FL | Florida Power & Light Co. (FPL) | 7.2 TWh | Sep 1976 | May 2026 | Natural Gas |
| Manatee Solar Energy Center | Florida Power & Light Co | Parrish, FL | Florida Power & Light Co. (FPL) | 93.0 GWh | Nov 2016 | May 2026 | Solar |
| Marathon Generating Plant | Florida Keys El Coop Assn, Inc | Marathon, FL | Florida Power & Light Co. (FPL) | 27.7 MWh | Dec 1957 | May 2025 | Distillate Fuel Oil |
| Mare Branch | Florida Power & Light Co | TBD, FL | Florida Power & Light Co. (FPL) | 93.8 GWh | - | May 2026 | Solar |
| Martin | Florida Power & Light Co | Indiantown, FL | Florida Power & Light Co. (FPL) | 8.0 TWh | Nov 1980 | May 2026 | Natural Gas |
| McKay Bay Facility | City of Tampa (FL) | Tampa, FL | Tampa Electric Company (TEC) | 86.2 GWh | May 1985 | May 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Miami Dade Solar Energy Center | Florida Power & Light Co | Miami, FL | Florida Power & Light Co. (FPL) | 140.2 GWh | Dec 2018 | May 2026 | Solar |
| Midulla Generating Station | Seminole Electric Cooperative Inc | Bowling Green, FL | Seminole Electric Cooperative (SEC) | 3.3 TWh | Dec 2001 | May 2026 | Natural Gas : 99.9% |
| Mitchell Creek | Florida Power & Light Co | TBD, FL | Florida Power & Light Co. (FPL) | 177.0 GWh | Oct 2024 | May 2026 | Solar |
| MLH 2 | CleanCapital Holdings | Gainesville, FL | Gainesville Regional Utilities (GVL) | 644.0 MWh | Sep 2013 | Dec 2025 | Solar |
| MLH 3 | CleanCapital Holdings | Gainesville, FL | Gainesville Regional Utilities (GVL) | 683.0 MWh | Sep 2013 | Dec 2025 | Solar |
| Monarch | Florida Power & Light Co | TBD, FL | Florida Power & Light Co. (FPL) | 142.9 GWh | Dec 2023 | May 2026 | Solar |
Browse Power Plants By Florida Counties
Figures are based on May 2026 generation numbers.| County | State Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Alachua County, FL | # 23 | 13 | 2.8 TWh |
| Baker County, FL | # 34 | 5 | 595.0 GWh |
| Bay County, FL | # 20 | 7 | 4.5 TWh |
| Brevard County, FL | # 14 | 12 | 9.2 TWh |
| Broward County, FL | # 7 | 7 | 12.5 TWh |
| Calhoun County, FL | # 30 | 9 | 895.0 GWh |
| Charlotte County, FL | # 39 | 5 | 481.4 GWh |
| Citrus County, FL | # 5 | 4 | 15.9 TWh |
| Clay County, FL | # 41 | 3 | 421.8 GWh |
| Collier County, FL | # 45 | 4 | 350.6 GWh |
| Columbia County, FL | # 33 | 5 | 676.4 GWh |
| DeSoto County, FL | # 27 | 11 | 1.2 TWh |
| Duval County, FL | # 11 | 24 | 9.8 TWh |
| Escambia County, FL | # 21 | 10 | 3.5 TWh |
| Gadsden County, FL | # 35 | 3 | 584.8 GWh |
| Gilchrist County, FL | # 37 | 4 | 529.6 GWh |
| Hamilton County, FL | # 42 | 5 | 415.9 GWh |
| Hardee County, FL | # 18 | 7 | 5.4 TWh |
| Hendry County, FL | # 26 | 13 | 1.6 TWh |
| Hernando County, FL | # 50 | 3 | 102.9 GWh |
| Highlands County, FL | # 52 | 6 | 86.6 GWh |
| Hillsborough County, FL | # 6 | 37 | 15.3 TWh |
| Indian River County, FL | # 31 | 8 | 730.3 GWh |
| Jackson County, FL | # 40 | 6 | 447.0 GWh |
| Lake County, FL | # 51 | 6 | 102.8 GWh |
| Lee County, FL | # 12 | 2 | 9.7 TWh |
| Leon County, FL | # 24 | 5 | 1.8 TWh |
| Levy County, FL | # 43 | 4 | 385.0 GWh |
| Madison County, FL | # 38 | 4 | 514.3 GWh |
| County | State Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Manatee County, FL | # 15 | 13 | 8.9 TWh |
| Marion County, FL | # 57 | 1 | 18.0 MWh |
| Martin County, FL | # 16 | 6 | 8.6 TWh |
| Miami-Dade County, FL | # 3 | 12 | 20.2 TWh |
| Monroe County, FL | # 56 | 4 | 7.0 GWh |
| Nassau County, FL | # 29 | 5 | 1.2 TWh |
| Okaloosa County, FL | # 44 | 3 | 368.4 GWh |
| Okeechobee County, FL | # 8 | 10 | 11.9 TWh |
| Orange County, FL | # 10 | 13 | 9.9 TWh |
| Osceola County, FL | # 19 | 10 | 4.9 TWh |
| Palm Beach County, FL | # 1 | 11 | 26.8 TWh |
| Pasco County, FL | # 22 | 7 | 3.0 TWh |
| Pinellas County, FL | # 17 | 6 | 6.2 TWh |
| Polk County, FL | # 2 | 39 | 23.8 TWh |
| Putnam County, FL | # 9 | 10 | 11.5 TWh |
| Santa Rosa County, FL | # 25 | 6 | 1.7 TWh |
| Sarasota County, FL | # 53 | 1 | 35.0 GWh |
| Seminole County, FL | # 54 | 3 | 11.9 GWh |
| St. Johns County, FL | # 48 | 1 | 132.9 GWh |
| St. Lucie County, FL | # 4 | 16 | 18.2 TWh |
| Sumter County, FL | # 49 | 2 | 130.8 GWh |
| Suwannee County, FL | # 36 | 6 | 575.4 GWh |
| Taylor County, FL | # 55 | 3 | 7.7 GWh |
| Union County, FL | # 47 | 1 | 148.1 GWh |
| Volusia County, FL | # 13 | 11 | 9.4 TWh |
| Wakulla County, FL | # 28 | 1 | 1.2 TWh |
| Walton County, FL | # 32 | 6 | 682.0 GWh |
| Washington County, FL | # 46 | 1 | 170.9 GWh |