Gilchrist County Solar
8210 SE 80 Avenue, Newberry, FL 32669Plant Summary Information
Gilchrist County Solar is ranked #1 out of 220 solar farms in Florida in terms of total annual net electricity generation.
Gilchrist County Solar generated 41.0 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Gilchrist County Solar |
|---|---|
| Utility Name | FRP Gilchrist County Solar, LLC |
| Location | Alachua County, FL |
| Initial Operation Date | November 2024 |
| Last Update | Mar 2026 |
| Annual Generation | 196.8 GWh |
| Annual Consumption | 732.3 k MMBtu |
| Ranked #2,521 out of 12,332 Power Plants Nationwide | |
| Ranked #453 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #65 out of 325 Florida Power Plants | |
| Ranked #1 out of 220 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of Gilchrist County Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gilchrist County Solar.
Monthly Net Generation for Gilchrist County Solar
Monthly Plant Fuel Consumption for Gilchrist County Solar
Gilchrist County Solar Details
| Summary Information | |
|---|---|
| Plant Name | Gilchrist County Solar (67207) |
| Plant Address | 8210 SE 80 Avenue, Newberry, FL 32669 |
| Utility | FRP Gilchrist County Solar, LLC (66090) |
| Latitude, Longitude | 29.61835, -82.67018 |
| Generation Dates on File | Nov 2024 to Mar 2026 |
| Initial Operation Date | November 2024 |
| Annual Generation | 196.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Florida Inc (FPC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator GILS Details Operating November 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 74.5 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 74.5 MW |
| Winter Capacity | 74.5 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 108.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Gilchrist County Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #443 | Solverde 1 | Lancaster, CA | 202.3 GWh |
| #444 | Badger Hollow I | Montfort, WI | 201.4 GWh |
| #445 | Point Beach Solar | Two Creeks, WI | 200.9 GWh |
| #446 | Wapello Solar LLC | Wapello, IA | 200.3 GWh |
| #447 | Second Division Solar | West Columbia, TX | 199.5 GWh |
| #448 | Steel Solar LLC | Plymouth, UT | 199.3 GWh |
| #449 | Clover Creek Solar Community Solar | Mona, UT | 198.3 GWh |
| #450 | Snipesville | Denton, GA | 197.7 GWh |
| #451 | Cereal City Solar, LLC | Battle Creek, MI | 197.2 GWh |
| #452 | Horseshoe Solar, LLC | Tooele, UT | 197.2 GWh |
| #454 | Honeybell | TBD, FL | 196.2 GWh |
| #455 | Wildflower Solar, LLC (MS) | DeSoto, MS | 196.1 GWh |
| #456 | Desert Harvest II LLC | Desert Center, CA | 192.0 GWh |
| #457 | Hornshadow Solar, LLC | Castle Dale, UT | 195.0 GWh |
| #458 | Buttonwood | Fort Pierce, FL | 194.1 GWh |
| #459 | Hunter Solar, LLC (CO) | Bennett, CO | 194.0 GWh |
| #460 | Speckled Perch | TBD, FL | 193.7 GWh |
| #461 | Bell Ridge Solar | Trenton, FL | 193.0 GWh |
| #462 | Hog Bay | TBD, FL | 192.8 GWh |
| #463 | Blackwater Solar | Bickley, GA | 192.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gilchrist County Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bell Ridge Solar | Trenton, FL | 193.0 GWh | 7.4 mi |
| Bronson Solar | Bronson, FL | 97.2 GWh | 11 mi |
| Butler Plaza | Gainesville, FL | 1.9 GWh | 17.4 mi |
| Columbia County Solar | Fort White, FL | 190.3 GWh | 18.6 mi |
| Columbia Solar Power Plant | Fort White, FL | 158.5 GWh | 18.3 mi |
| County Line Renewable Energy Center | High Springs, FL | 184.8 GWh | 13.4 mi |
| Deerhaven Generating Station | Gainesville, FL | 624.8 GWh | 19.5 mi |
| Deerhaven Renewable | Gainesville, FL | 520.2 GWh | 19.4 mi |
| Hardeetown Solar Power Plant | Chiefland, FL | 172.0 GWh | 13.9 mi |
| High Springs Solar Power Plant | High Springs, FL | 164.7 GWh | 13.4 mi |
| Hildreth Solar Power Plant | O'Brien, FL | 182.4 GWh | 25.6 mi |
| John R Kelly | Gainesville, FL | 807.2 GWh | 21.1 mi |
| MLH 2 | Gainesville, FL | 1.2 GWh | 23.4 mi |
| MLH 3 | Gainesville, FL | 1.1 GWh | 23.4 mi |
| Santa Fe Solar Power Plant | Fort White, FL | 148.2 GWh | 18.5 mi |
| Solar Park Gainesville, LLC | Gainesville, FL | 1.5 GWh | 20.7 mi |
| South Energy Center | Gainesville, FL | 49.3 GWh | 19.9 mi |
| Trenton Solar Power Plant | Trenton, FL | 170.4 GWh | 10.4 mi |
| University of Florida | Gainesville, FL | 379.0 GWh | 19.4 mi |
| Whistling Duck I | Williston, FL | 43.7 GWh | 17.6 mi |