Hamilton Solar Power Plant
3974 SW 69th Dr, Jasper, FL 32052Plant Summary Information
Hamilton Solar Power Plant is ranked #15 out of 207 solar farms in Florida in terms of total annual net electricity generation.
Hamilton Solar Power Plant generated 45.8 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Hamilton Solar Power Plant |
|---|---|
| Utility Name | Duke Energy Florida, LLC |
| Location | Hamilton County, FL |
| Initial Operation Date | December 2018 |
| Last Update | Oct 2025 |
| Annual Generation | 180.3 GWh |
| Annual Consumption | 664.3 k MMBtu |
| Ranked #2,616 out of 12,553 Power Plants Nationwide | |
| Ranked #466 out of 6,410 Solar Power Plants Nationwide | |
| Ranked #79 out of 313 Florida Power Plants | |
| Ranked #15 out of 207 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of Hamilton Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hamilton Solar Power Plant.
Monthly Net Generation for Hamilton Solar Power Plant
Hamilton Solar Power Plant Details
| Summary Information | |
|---|---|
| Plant Name | Hamilton Solar Power Plant (61807) |
| Plant Address | 3974 SW 69th Dr, Jasper, FL 32052 |
| Utility | Duke Energy Florida, LLC (6455) |
| Latitude, Longitude | 30.44432, -83.18694 |
| Generation Dates on File | Dec 2018 to Oct 2025 |
| Initial Operation Date | December 2018 |
| Annual Generation | 180.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Florida Inc (FPC) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator PV1 Details Operating December 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 74.9 MW |
| Summer Capacity | 74.9 MW |
| Winter Capacity | 74.9 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2018 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 1H |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 109.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Hamilton Solar Power Plant Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #456 | Northern Orchard Solar PV, LLC | Taft, CA | 181.4 GWh |
| #457 | Hildreth Solar Power Plant | O'Brien, FL | 183.3 GWh |
| #458 | Hornshadow Solar II, LLC | Castle Dale, UT | 183.1 GWh |
| #459 | Beautyberry | Clewiston, FL | 182.7 GWh |
| #460 | Grand View Solar Two | Grand View, ID | 182.5 GWh |
| #461 | Speedway Solar, LLC | Morrison Town, IN | 182.0 GWh |
| #462 | FPL Shirer Branch Solar Energy Center | Clarksville, FL | 182.0 GWh |
| #463 | Ivanpah 1 | Nipton, CA | 187.4 GWh |
| #464 | Second Division Solar | West Columbia, TX | 181.7 GWh |
| #465 | Spring Grove I | Spring Grove, VA | 180.5 GWh |
| #467 | Falmouth Renewable Energy Center | Live Oak, FL | 179.6 GWh |
| #468 | North Star Solar Project | North Branch, MN | 179.3 GWh |
| #469 | Pioneer Solar (CO), LLC | Bennett, CO | 178.9 GWh |
| #470 | Decatur Parkway Solar Project, LLC | Bainbridge, GA | 178.7 GWh |
| #471 | Lancaster Solar GA | Arlington, GA | 178.1 GWh |
| #472 | Blackwater Solar | Bickley, GA | 177.2 GWh |
| #473 | Georges Lake | TBD, FL | 177.2 GWh |
| #474 | Harmony Solar (FL) | St. Cloud, FL | 176.4 GWh |
| #475 | Woodyard | Clewiston, FL | 176.2 GWh |
| #476 | Norton Creek | TBD, FL | 176.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hamilton Solar Power Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Echo River Solar | Live Oak, FL | 158.1 GWh | 21.8 mi |
| Falmouth Renewable Energy Center | Live Oak, FL | 179.6 GWh | 7.2 mi |
| Lowndes Cowart | Valdosta, GA | 6.8 GWh | 25.8 mi |
| Lowndes IDA | Valdosta, GA | 3.1 GWh | 27.1 mi |
| Lowndes Tycor Farms | Lake Park, GA | 4.6 GWh | 16.9 mi |
| Moody Air Force Base Solar | Valdosta, GA | 88.4 GWh | 35.5 mi |
| Norton Creek | TBD, FL | 176.1 GWh | 10.1 mi |
| PCA-Valdosta Mill | Valdosta, GA | 322.6 GWh | 18.6 mi |
| Pecan Row Landfill To Electric Facility | Valdosta, GA | 30.5 GWh | 27.7 mi |
| Perry Solar Facility | Perry, FL | 7.7 GWh | 31.6 mi |
| Sundance Renewable Energy Center | Lee, FL | 64.5 GWh | 13.9 mi |
| Sunshine Gateway Solar Energy Center | Lake City, FL | 135.2 GWh | 28.1 mi |
| Suwannee River | Live Oak, FL | 76.0 GWh | 4.7 mi |
| Suwannee Solar Facility | Live Oak, FL | 16.2 GWh | 4.8 mi |
| Swift Creek Chemical Complex | White Springs, FL | 87.2 GWh | 19.2 mi |
| Twin Rivers Solar Power Plant | Jasper, FL | 165.3 GWh | 13.1 mi |
| Valdosta | Valdosta, GA | 1.4 GWh | 25.4 mi |
| Valdosta Prison | Valdosta, GA | 1.7 GWh | 32.2 mi |
| Valdosta Water Treatment Plant | Valdosta, GA | 52.0 MWh | 32.7 mi |
| Winquepin Renewable Energy Center | Lee, FL | 164.1 GWh | 13 mi |