H L Culbreath Bayside Power Station
3602 Port Sutton Road, Tampa, FL 33619Plant Summary Information
H L Culbreath Bayside Power Station is ranked #17 out of 315 power plants in Florida in terms of total annual net electricity generation.
H L Culbreath Bayside Power Station is comprised of 13 generators and generated 2.4 TWh during the 3-month period between August 2025 to November 2025.
| Plant Name | H L Culbreath Bayside Power Station |
|---|---|
| Utility Name | Tampa Electric Co |
| Location | Hillsborough County, FL |
| Initial Operation Date | November 1965 |
| Last Update | Nov 2025 |
| Annual Generation | 5.5 TWh |
| Annual Consumption | 43.1 M MMBtu |
| Ranked #194 out of 12,574 Power Plants Nationwide | |
| Ranked #80 out of 2,244 Natural Gas Power Plants Nationwide | |
| Ranked #17 out of 315 Florida Power Plants | |
| Ranked #16 out of 81 Florida Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of H L Culbreath Bayside Power Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for H L Culbreath Bayside Power Station.
Monthly Net Generation for H L Culbreath Bayside Power Station
H L Culbreath Bayside Power Station Details
| Summary Information | |
|---|---|
| Plant Name | H L Culbreath Bayside Power Station (7873) |
| Plant Address | 3602 Port Sutton Road, Tampa, FL 33619 |
| Utility | Tampa Electric Co (18454) |
| Latitude, Longitude | 27.9072, -82.4231 |
| Generation Dates on File | Mar 2003 to Nov 2025 |
| Initial Operation Date | November 1965 |
| Annual Generation | 5.5 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Tampa Electric Company (TEC) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Hillsborough Bay |
| Ash Impoundment | |
| Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
| Grid Voltage | 230.00 kV / 138.00 kV / 69.00 kV |
| Energy Storage | Yes |
| Natural Gas Information | |
| Pipeline Name |
FLORIDA GAS TRANSMISSION COMPANY GULFSTREAM NATURAL GAS SYSTEM LLC |
| Natural Gas Storage | No |
Generator 1ST Details Operating November 1965
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | No |
| Nameplate Capacity | 239.3 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 245 MW |
| Winter Capacity | 259 MW |
| Minimum Load | 47 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 1965 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 2ST Details Operating October 1967
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Duct Burners | No |
| Nameplate Capacity | 445.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 329 MW |
| Winter Capacity | 337 MW |
| Minimum Load | 52 MW |
| Uprate/Derate Completed | Yes |
|---|---|
| Uprate Or Derate Completed | June 2024 |
| Status | Operating |
| First Operation Date | October 1967 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator 1A Details Operating April 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 189.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 168 MW |
| Winter Capacity | 196 MW |
| Minimum Load | 78 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 1B Details Operating April 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 189.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 168 MW |
| Winter Capacity | 196 MW |
| Minimum Load | 78 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 1C Details Operating April 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 189.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 168 MW |
| Winter Capacity | 196 MW |
| Minimum Load | 78 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 2A Details Operating January 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 189.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 168 MW |
| Winter Capacity | 196 MW |
| Minimum Load | 78 MW |
| Uprate/Derate Completed | Yes |
| Uprate Or Derate Completed | May 2024 |
|---|---|
| Status | Operating |
| First Operation Date | January 2004 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 2B Details Operating January 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 189.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 168 MW |
| Winter Capacity | 196 MW |
| Minimum Load | 78 MW |
| Uprate/Derate Completed | Yes |
| Uprate Or Derate Completed | May 2024 |
|---|---|
| Status | Operating |
| First Operation Date | January 2004 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 2C Details Operating January 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 189.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 168 MW |
| Winter Capacity | 196 MW |
| Minimum Load | 78 MW |
| Uprate/Derate Completed | Yes |
|---|---|
| Uprate Or Derate Completed | May 2024 |
| Status | Operating |
| First Operation Date | January 2004 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 2D Details Operating January 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 189.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 168 MW |
| Winter Capacity | 196 MW |
| Minimum Load | 78 MW |
| Uprate/Derate Completed | Yes |
|---|---|
| Uprate Or Derate Completed | May 2024 |
| Status | Operating |
| First Operation Date | January 2004 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 5 Details Operating April 2009
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 69.9 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 56 MW |
| Winter Capacity | 61 MW |
| Minimum Load | 14 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2009 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 6 Details Operating April 2009
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 69.9 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 56 MW |
| Winter Capacity | 61 MW |
| Minimum Load | 14 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2009 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 3 Details Operating July 2009
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 69.9 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 56 MW |
| Winter Capacity | 61 MW |
| Minimum Load | 14 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2009 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 4 Details Operating July 2009
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 69.9 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 56 MW |
| Winter Capacity | 61 MW |
| Minimum Load | 14 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2009 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
H L Culbreath Bayside Power Station Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #70 | Chuck Lenzie Generating Station | Apex, NV | 5.7 TWh |
| #71 | Guadalupe Generating Station | Marion, TX | 5.7 TWh |
| #72 | Oregon Clean Energy Center | Oregon, OH | 5.7 TWh |
| #73 | Lee Combined Cycle Plant | Goldsboro, NC | 5.7 TWh |
| #74 | Linden Cogen Plant | Linden, NJ | 5.7 TWh |
| #75 | Marcus Hook Energy LP | Marcus Hook, PA | 5.6 TWh |
| #76 | Chouteau | Pryor, OK | 5.6 TWh |
| #77 | Plaquemine Cogeneration Plant | Plaquemine, LA | 5.7 TWh |
| #78 | Eagle Valley (IN) | Martinsville, IN | 5.6 TWh |
| #79 | Kendall County Generation Facility | Minooka, IL | 5.5 TWh |
| #81 | St. Charles Power Station (LA) | La Place, LA | 5.5 TWh |
| #82 | Channelview Cogeneration Plant | Channelview, TX | 5.5 TWh |
| #83 | Doswell Energy Center | Ashland, VA | 5.5 TWh |
| #84 | Port Everglades | Ft. Lauderdale, FL | 5.5 TWh |
| #85 | Kiamichi Energy Facility | Kiowa, OK | 5.4 TWh |
| #86 | Wolf Hollow II | Granbury, TX | 5.4 TWh |
| #87 | Taft Cogeneration Facility | Hahnville, LA | 5.4 TWh |
| #88 | Indeck Niles Energy Center | Niles, MI | 5.4 TWh |
| #89 | Zeeland Generating Station | Zeeland, MI | 5.3 TWh |
| #90 | St Joseph Energy Center | New Carlisle, IN | 5.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding H L Culbreath Bayside Power Station.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Balm Solar | Wimauma, FL | 140.3 GWh | 15.2 mi |
| Bayboro | St. Petersburg, FL | 3.8 GWh | 16.6 mi |
| Big Bend | Apollo Beach, FL | 7.5 TWh | 7.9 mi |
| Big Bend Agrivoltaics | Apollo Beach, FL | 749.0 MWh | 8.7 mi |
| Big Bend Floating Solar I | Gibsonton, FL | 1.3 GWh | 8.4 mi |
| Big Bend II Solar | Apollo Beach, FL | 84.8 GWh | 8.9 mi |
| Bullfrog Creek Solar | Wimauma, FL | 154.0 GWh | 18.7 mi |
| Dover Solar and Battery Storage | Dover, FL | 46.7 GWh | 13.9 mi |
| Hillsborough County Resource Recovery | Tampa, FL | 195.8 GWh | 6 mi |
| IKEA Tampa 042 | Tampa, FL | 1.4 GWh | 3.3 mi |
| John Hopkins Middle School Microgrid | St Petersburg, FL | 1.8 GWh | 17.1 mi |
| Little Manatee River Solar | Ruskin, FL | 86.6 GWh | 14.9 mi |
| Lockheed Martin Solar System | Oldsmar, FL | 2.9 GWh | 18.7 mi |
| McKay Bay Facility | Tampa, FL | 133.4 GWh | 2.9 mi |
| Mosaic Co Tampa Facility | Riverview, FL | 93.8 GWh | 3.8 mi |
| P L Bartow | St. Petersburg, FL | 6.1 TWh | 11.4 mi |
| Pinellas County Resource Recovery | St. Petersburg, FL | 344.0 GWh | 15.5 mi |
| Riverside Solar | Ruskin, FL | 107.1 GWh | 15.7 mi |
| TIA Solar | Tampa, FL | 2.7 GWh | 7.8 mi |
| Wimauma Solar and Battery Storage | Wimauma, FL | 102.6 GWh | 15.6 mi |