Laurel Oaks Solar
6202 Miles Farm Road, Plant City, FL 33567Plant Summary Information
Laurel Oaks Solar is ranked #136 out of 219 solar farms in Florida in terms of total annual net electricity generation.
Laurel Oaks Solar generated 24.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Laurel Oaks Solar |
|---|---|
| Utility Name | Tampa Electric Co |
| Location | Hillsborough County, FL |
| Initial Operation Date | December 2022 |
| Last Update | Dec 2025 |
| Annual Generation | 123.9 GWh |
| Annual Consumption | 447.7 k MMBtu |
| Ranked #3,179 out of 12,613 Power Plants Nationwide | |
| Ranked #737 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #207 out of 325 Florida Power Plants | |
| Ranked #136 out of 219 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of Laurel Oaks Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Laurel Oaks Solar.
Monthly Net Generation for Laurel Oaks Solar
Monthly Plant Fuel Consumption for Laurel Oaks Solar
Laurel Oaks Solar Details
| Summary Information | |
|---|---|
| Plant Name | Laurel Oaks Solar (65684) |
| Plant Address | 6202 Miles Farm Road, Plant City, FL 33567 |
| Utility | Tampa Electric Co (18454) |
| Latitude, Longitude | 27.92688, -82.06767 |
| Generation Dates on File | Dec 2022 to Dec 2025 |
| Initial Operation Date | December 2022 |
| Annual Generation | 123.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Tampa Electric Company (TEC) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator 1 Details Operating December 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 61.2 MW |
| Summer Capacity | 61.2 MW |
| Winter Capacity | 61.2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2022 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 72.2 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Laurel Oaks Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #727 | Palmetto Plains | Bowman, SC | 126.1 GWh |
| #728 | Grizzly Ridge Solar | Hamilton County, TX | 126.1 GWh |
| #729 | Hawtree Solar | Warrenton, NC | 125.9 GWh |
| #730 | Foxglove Solar | Middletown, VA | 125.8 GWh |
| #731 | Desper Solar | Louisa, VA | 125.5 GWh |
| #732 | Granite Mountain Solar West, LLC | Cedar City, UT | 125.2 GWh |
| #733 | RE Camelot LLC | Mojave, CA | 125.1 GWh |
| #734 | Escape Solar Plant | TBD, NV | 123.7 GWh |
| #735 | Solar Star Oregon II | Prineville, OR | 124.7 GWh |
| #736 | Farmington Solar | Farmington, ME | 124.1 GWh |
| #738 | OE_GA3 | Camilla, GA | 123.8 GWh |
| #739 | Cotton Creek Solar Energy Center | McDavid, FL | 123.6 GWh |
| #740 | Caden Energix Axton LLC | Axton, VA | 123.1 GWh |
| #741 | Macho Springs | Deming, NM | 122.7 GWh |
| #742 | BT Cooke Solar, LLC | Gainsville, TX | 122.5 GWh |
| #743 | Twin Lakes | Interlachen, FL | 122.5 GWh |
| #744 | Oriana Solar LLC | Victoria, TX | 122.5 GWh |
| #745 | Grasshopper Solar | Chase City, VA | 122.5 GWh |
| #746 | Conetoe II Solar, LLC | Conetoe, NC | 122.4 GWh |
| #747 | Hecate Energy Beacon Solar 3 | Cantil, CA | 122.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Laurel Oaks Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alafia Solar | Mulberry, FL | 117.7 GWh | 14.3 mi |
| Bonnie Mine Solar | Bartow, FL | 66.5 GWh | 5.5 mi |
| C D McIntosh Jr | Lakeland, FL | 1.8 TWh | 13.8 mi |
| Dover Solar and Battery Storage | Dover, FL | 47.0 GWh | 8.4 mi |
| Durrance | Mulberry, FL | 50.4 GWh | 11.5 mi |
| English Creek Solar | Plant City, FL | 791.0 MWh | 1.3 mi |
| Goldfinch | Lakeland, FL | 4.4 GWh | 4.1 mi |
| Jamison Solar (FL) | Mulberry, FL | 138.9 GWh | 10.8 mi |
| Lake Hancock Solar | Bartow, FL | 93.0 GWh | 14.5 mi |
| Lakeland Electric Co. (FL) - Airport II | Lakeland, FL | 2.2 GWh | 4.6 mi |
| Lakeland Electric Co. (FL)-Airport 1 | Lakeland, FL | 2.4 GWh | 4.4 mi |
| Larsen Memorial | Lakeland, FL | 298.1 GWh | 12.2 mi |
| Lithia Solar | Lithia, FL | 142.4 GWh | 13.4 mi |
| LKL BLBD, LLC | Lakeland, FL | 8.9 GWh | 10.1 mi |
| Magnolia Solar | Mulberry, FL | 144.1 GWh | 1.3 mi |
| Mosaic Co Bartow Facility | Bartow, FL | 171.0 GWh | 9.2 mi |
| Mosaic New Wales Operations | Mulberry, FL | 365.7 GWh | 6.5 mi |
| Mosaic South Pierce Operations | Mulberry, FL | 87.5 GWh | 13.7 mi |
| Mulberry Cogeneration Facility | Bartow, FL | 388.0 GWh | 12.8 mi |
| Winston | Lakeland, FL | 39.0 MWh | 7.6 mi |