Lake Placid Solar Power Plant
TBD, Lake Placid, FL 36494Plant Summary Information
Lake Placid Solar Power Plant is ranked #160 out of 203 solar farms in Florida in terms of total annual net electricity generation.
Lake Placid Solar Power Plant generated 17.8 GWh during the 3-month period between March 2025 to June 2025.
Plant Name | Lake Placid Solar Power Plant |
---|---|
Utility Name | Duke Energy Florida, LLC |
Location | Highlands County, FL |
Initial Operation Date | December 2019 |
Last Update | Jun 2025 |
Annual Generation | 60.1 GWh |
Annual Consumption | 230.7 k MMBtu |
Ranked #3,849 out of 12,327 Power Plants Nationwide | |
Ranked #898 out of 6,200 Solar Power Plants Nationwide | |
Ranked #238 out of 308 Florida Power Plants | |
Ranked #160 out of 203 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Lake Placid Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lake Placid Solar Power Plant.
Monthly Net Generation for Lake Placid Solar Power Plant
Lake Placid Solar Power Plant Details
Summary Information | |
---|---|
Plant Name | Lake Placid Solar Power Plant (62541) |
Plant Address | TBD, Lake Placid, FL 36494 |
Utility | Duke Energy Florida, LLC (6455) |
Latitude, Longitude | 27.33114, -81.36402 |
Generation Dates on File | Dec 2019 to Jun 2025 |
Initial Operation Date | December 2019 |
Annual Generation | 60.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Florida Inc (FPC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
Grid Voltage | 69.00 kV |
Energy Storage | Yes |
Generator PV1 Details Operating December 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 45 MW |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 1H |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 63 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator ES1 Details Operating February 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 17.3 MW |
Summer Capacity | 17.3 MW |
Winter Capacity | 17.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 36 |
---|---|
Maximum Charge Rate | 17.3 MW |
Maximum Discharge Rate | 17.3 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 12 |
Storage Enclosure Type | CS |
Ramping Spinning Reserve | Yes |
Co Located Renewable Firming | Yes |
Excess Wind And Solar Generation | P |
DC Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 62541 |
Direct Support Gen Id | PV1 |
Support T D Asset | Yes |
Lake Placid Solar Power Plant Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#888 | Pawpaw Solar Plant | Butler, GA | 63.2 GWh |
#889 | TAI Huntsville Solar Hybrid | Huntsville, AL | 62.9 GWh |
#890 | Caprock Solar 1 LLC | San Jon, NM | 62.8 GWh |
#891 | Avra Valley Solar | Marana, AZ | 62.5 GWh |
#892 | Solar Borrego I | Borrego Springs, CA | 62.2 GWh |
#893 | Bonnie Mine Solar | Bartow, FL | 61.8 GWh |
#894 | Gulf Coast Solar Center I | Valparaiso, FL | 61.1 GWh |
#895 | Cuyama Solar, LLC | Cuyama, CA | 60.5 GWh |
#896 | Bison Solar LLC | Wellington, CO | 60.3 GWh |
#897 | Ray Ranch Solar | Pettus, TX | 60.3 GWh |
#899 | Prairie Creek Solar | Jacksonville, IL | 59.1 GWh |
#900 | Baldy Mesa 2_Silver Peak Hybrid | Adelanto, CA | 50.7 GWh |
#901 | RE Garland A | Rosamond, CA | 58.2 GWh |
#902 | Caden Energix Hickory LLC | Chesapeake, VA | 58.1 GWh |
#903 | Pinal Central Energy Center Hybrid | Casa Grande, AZ | 55.3 GWh |
#904 | Sunray 2 | Daggett, CA | 57.7 GWh |
#905 | Antelope DSR 3 | Lancaster, CA | 57.7 GWh |
#906 | Oberon IB | Odessa, TX | 57.5 GWh |
#907 | Innovative Solar 31 | Bladenboro, NC | 56.9 GWh |
#908 | TA-High Desert LLC | Lancaster, CA | 56.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lake Placid Solar Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Babcock Preserve | Punta Gorda, FL | 144.1 GWh | 40.8 mi |
Babcock Solar Energy Center Hybrid | Punta Gorda, FL | 129.5 GWh | 40.2 mi |
Big Water | TBD, FL | 94.3 GWh | 35.3 mi |
Cattle Ranch | Arcadia, FL | 142.5 GWh | 27.3 mi |
Charlie Creek Solar Power Plant | Wauchula, FL | 161.1 GWh | 27.8 mi |
Citrus Solar Energy Center Hybrid | Arcadia, FL | 135.0 GWh | 27.2 mi |
DeSoto Next Generation Solar Energy | Arcadia, FL | 28.1 GWh | 26.9 mi |
FPL Cavendish Solar Energy Center | Okeechobee, FL | 114.4 GWh | 39.9 mi |
Green Pasture | TBD, FL | 96.8 GWh | 33.1 mi |
Hawthorne Creek | TBD, FL | 163.5 GWh | 34 mi |
Hog Bay | TBD, FL | 101.9 GWh | 33.7 mi |
Honeybell | TBD, FL | 122.1 GWh | 40.4 mi |
Lakeside Solar Center | Okeechobee, FL | 141.5 GWh | 38.9 mi |
Okeechobee Clean Energy Center | Okeechobee, FL | 11.1 TWh | 40.9 mi |
Okeechobee Solar | Vero Beach, FL | 148.5 GWh | 40.6 mi |
Prairie Creek FL | TBD, FL | 171.1 GWh | 27.1 mi |
Rodeo Solar Center | Arcadia, FL | 134.3 GWh | 27.4 mi |
Speckled Perch | TBD, FL | 98.3 GWh | 34.7 mi |
Vandolah Power Station | Wauchula, FL | 724.2 GWh | 36.8 mi |
Wildflower Solar Energy Center | Arcadia, FL | 144.9 GWh | 25.8 mi |