Lakeland Electric Co. (FL) - Airport II

4070 Hamilton Road, Lakeland, FL 33811

Plant Summary Information

Lakeland Electric Co. (FL) - Airport II is ranked #211 out of 225 solar farms in Florida in terms of total annual net electricity generation.

Lakeland Electric Co. (FL) - Airport II generated 387.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameLakeland Electric Co. (FL) - Airport II
Utility NameSun E N7 Holdings LLC
LocationPolk County, FL
Initial Operation DateSeptember 2012
Last Update Dec 2024
Annual Generation 2.2 GWh
Annual Consumption 7.6 k MMBtu
Ranked #10,572 out of 13,094 Power Plants Nationwide
Ranked #5,475 out of 7,027 Solar Power Plants Nationwide
Ranked #312 out of 332 Florida Power Plants
Ranked #211 out of 225 Florida Solar Power Plants
Fuel Types Solar
Previous Operator NVT LICENSES, LLC (2014 to 2022)
Sun E N7 Holdings LLC (2023 to 2025)

Map of Lakeland Electric Co. (FL) - Airport II

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lakeland Electric Co. (FL) - Airport II.

Create Your Account Today

Monthly Net Generation for Lakeland Electric Co. (FL) - Airport II

Monthly Plant Fuel Consumption for Lakeland Electric Co. (FL) - Airport II

Lakeland Electric Co. (FL) - Airport II Details

Summary Information
Plant NameLakeland Electric Co. (FL) - Airport II (59754)
Plant Address4070 Hamilton Road, Lakeland, FL 33811
UtilitySun E N7 Holdings LLC (66044)
Latitude, Longitude27.99114, -82.0473
Generation Dates on FileJan 2015 to Dec 2024
Initial Operation DateSeptember 2012
Annual Generation 2.2 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number12-490-000, 12-490-001
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionSERC
Balancing AuthorityTampa Electric Company (TEC)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerCity of Lakeland - (FL) (10623) FL
Grid Voltage 1.00 kV
Energy StorageNo

Generator 1 Details Operating September 2012

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity3.5 MW
Summer Capacity3.5 MW
Winter Capacity2.9 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2012
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity3.6 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Lakeland Electric Co. (FL) - Airport II Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#5465Ashley Solar (SC)Darlington, SC2.2 GWh
#5466Tompkins Cortland Community CollegeDryden, NY2.2 GWh
#5467USS Riley Solar LLC (CSG)Montevideo, MN2.2 GWh
#5468StudebakerFredonia, KS2.2 GWh
#5469Andresen SolarClara City, MN2.2 GWh
#5470601 Doremus CDGNewark, NJ2.2 GWh
#5471Dodge Renewables 1Dodge Center, MN2.2 GWh
#5472Maxton Solar, LLCMaxton, NC2.2 GWh
#5473Harrah's Atlantic City - POI 2 (Self ParAtlantic City, NJ2.2 GWh
#5474CREERacine, WI2.2 GWh
#5476Marshall SolarHartsville, SC2.2 GWh
#5477Tully 1Morris, IL2.2 GWh
#5478USS Slayton Solar LLC (CSG)Slayton, MN2.2 GWh
#5479Fairhaven C CSGFairhaven, MA2.2 GWh
#5480Wolverine SolarMaynard, MN2.2 GWh
#5481Curry SolarReidsville, GA2.2 GWh
#5482USS Rosebud Solar LLCMorgan, MN2.2 GWh
#5483SolarClub 35 LLCMankato, MN2.2 GWh
#5484Dynamic Energy NJ - FerreroSomerset, NJ2.2 GWh
#5485MD JESSUP 7950 OCEANO AVEJessup, MD2.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Lakeland Electric Co. (FL) - Airport II.

Plant NamePlant LocationAnnual GenerationDistance
Bartow Solar Energy LLCBartow, FL12.5 GWh14.6 mi
Bonnie Mine SolarBartow, FL67.3 GWh7.9 mi
C D McIntosh JrLakeland, FL2.3 TWh9.8 mi
Dover Solar and Battery StorageDover, FL48.5 GWh9.7 mi
DurranceMulberry, FL99.7 GWh15.2 mi
English Creek SolarPlant City, FL53.3 GWh3.4 mi
GoldfinchLakeland, FL4.8 GWh0.7 mi
Jamison Solar (FL)Mulberry, FL137.2 GWh13.9 mi
Juniper Solar (FL)Zephyrhills, FL144.6 GWh14.7 mi
Lakeland Electric Co. (FL)-Airport 1Lakeland, FL2.3 GWh0.2 mi
Larsen MemorialLakeland, FL159.2 GWh8.5 mi
Laurel Oaks SolarPlant City, FL122.4 GWh4.6 mi
LKL BLBD, LLCLakeland, FL9.8 GWh5.5 mi
Magnolia SolarMulberry, FL143.9 GWh5.1 mi
Mosaic Co Bartow FacilityBartow, FL180.7 GWh9.7 mi
Mosaic New Wales OperationsMulberry, FL350.2 GWh10.9 mi
Mulberry Cogeneration FacilityBartow, FL388.0 GWh14.3 mi
Osprey Energy Center Power PlantAuburndale, FL3.4 TWh15.2 mi
Peace Creek SolarBartow, FL96.7 GWh15.4 mi
WinstonLakeland, FL497.0 MWh3.1 mi