FPL Cavendish Solar Energy Center
100 FPL Landing, Okeechobee, FL 34972Plant Summary Information
FPL Cavendish Solar Energy Center is ranked #148 out of 225 solar farms in Florida in terms of total annual net electricity generation.
FPL Cavendish Solar Energy Center generated 34.2 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | FPL Cavendish Solar Energy Center |
|---|---|
| Utility Name | Florida Power & Light Co |
| Location | Okeechobee County, FL |
| Initial Operation Date | January 2023 |
| Last Update | May 2026 |
| Annual Generation | 116.1 GWh |
| Annual Consumption | 435.6 k MMBtu |
| Ranked #3,324 out of 13,081 Power Plants Nationwide | |
| Ranked #842 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #218 out of 332 Florida Power Plants | |
| Ranked #148 out of 225 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of FPL Cavendish Solar Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for FPL Cavendish Solar Energy Center.
Monthly Net Generation for FPL Cavendish Solar Energy Center
Monthly Plant Fuel Consumption for FPL Cavendish Solar Energy Center
FPL Cavendish Solar Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | FPL Cavendish Solar Energy Center (65438) |
| Plant Address | 100 FPL Landing, Okeechobee, FL 34972 |
| Utility | Florida Power & Light Co (6452) |
| Latitude, Longitude | 27.62701, -80.80416 |
| Generation Dates on File | Feb 2023 to May 2026 |
| Initial Operation Date | January 2023 |
| Annual Generation | 116.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Florida Power & Light Company (FPL) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator 1 Details Operating January 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 74.5 MW |
| Summer Capacity | 74.5 MW |
| Winter Capacity | 74.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2023 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 96.9 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
FPL Cavendish Solar Energy Center Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #832 | Payne Creek Solar | Bowling Green, FL | 119.2 GWh |
| #833 | OE_GA3 | Camilla, GA | 119.1 GWh |
| #834 | Northern Preserve Solar | Glen St. Mary, FL | 119.0 GWh |
| #835 | Skysol | Merrill, OR | 118.9 GWh |
| #836 | Hecate Energy Beacon Solar 3 | Cantil, CA | 118.9 GWh |
| #837 | BT Cooke Solar, LLC | Gainsville, TX | 117.7 GWh |
| #838 | Iris Solar LLC | Franklinton, LA | 117.1 GWh |
| #839 | Muskegon Solar | Muskegon, MI | 117.1 GWh |
| #840 | Sandstone Solar | Florence, AZ | 116.9 GWh |
| #841 | Sunlight Road Solar | Franklinton, LA | 116.2 GWh |
| #843 | Quail Ranch Solar and BESS | Rio Rancho, NM | 112.3 GWh |
| #844 | Landrace Holdings, LLC | Conway, SC | 115.6 GWh |
| #845 | Pavant Solar, LLC | Fillmore, UT | 115.2 GWh |
| #846 | Hecate Energy Beacon Solar 4 | Cantil, CA | 114.7 GWh |
| #847 | Riverside Solar | Ruskin, FL | 114.2 GWh |
| #848 | Alpine Solar | Lancaster, CA | 114.1 GWh |
| #849 | Silver State Solar Power North | Primm, NV | 114.0 GWh |
| #850 | Kellam Solar | Ben Wheeler, TX | 113.6 GWh |
| #851 | Gransolar Texas One, LLC | Thorndale, TX | 113.4 GWh |
| #852 | Lamesa II | Lamesa, TX | 112.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding FPL Cavendish Solar Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Big Water | TBD, FL | 179.9 GWh | 12.8 mi |
| Blue Cypress Solar Energy Center | Vero Beach, FL | 132.8 GWh | 16.4 mi |
| Buttonwood | Fort Pierce, FL | 190.7 GWh | 9.7 mi |
| Clover FL | Fort Pierce, FL | 31.7 GWh | 20.5 mi |
| Fort Drum Energy Center | Vero Beach, FL | 138.9 GWh | 3.1 mi |
| Fox Trail | Callahan, FL | 181.5 GWh | 17.1 mi |
| Grove | Vero Beach, FL | 143.9 GWh | 9.8 mi |
| Honeybell | TBD, FL | 191.0 GWh | 9.2 mi |
| Ibis | Palm Bay, FL | 142.6 GWh | 16.7 mi |
| Indian River Solar Center | Vero Beach, FL | 139.3 GWh | 14.3 mi |
| Mallard | Palm Bay, FL | 78.1 GWh | 16 mi |
| North Orange | TBD, FL | 28.7 GWh | 16.3 mi |
| Okeechobee Clean Energy Center | Okeechobee, FL | 10.8 TWh | 0.9 mi |
| Okeechobee Solar | Vero Beach, FL | 144.8 GWh | 0.6 mi |
| Orange Blossom Solar Center | Vero Beach, FL | 150.0 GWh | 14.4 mi |
| Orchard | Ft. Pierce, FL | 162.9 GWh | 15.1 mi |
| Palm Bay Solar | Palm Bay, FL | 154.1 GWh | 18.2 mi |
| Pelican Solar Center | Ft. Pierce, FL | 144.7 GWh | 17.3 mi |
| Sea Grape | Ft. Pierce, FL | 26.3 GWh | 19 mi |
| Turnpike | Vero Beach, FL | 164.3 GWh | 10.6 mi |