Hardeetown Solar Power Plant
11551 NE 30 Ave, Chiefland, FL 32626Plant Summary Information
Hardeetown Solar Power Plant is ranked #53 out of 199 solar farms in Florida in terms of total annual net electricity generation.
Hardeetown Solar Power Plant generated 26.7 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Hardeetown Solar Power Plant |
---|---|
Utility Name | Duke Energy Florida, LLC |
Location | Levy County, FL |
Initial Operation Date | April 2023 |
Last Update | Feb 2025 |
Annual Generation | 147.2 GWh |
Annual Consumption | 538.3 k MMBtu |
Ranked #2,761 out of 11,993 Power Plants Nationwide | |
Ranked #452 out of 5,778 Solar Power Plants Nationwide | |
Ranked #122 out of 307 Florida Power Plants | |
Ranked #53 out of 199 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Hardeetown Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hardeetown Solar Power Plant.
Monthly Net Generation for Hardeetown Solar Power Plant
Hardeetown Solar Power Plant Details
Summary Information | |
---|---|
Plant Name | Hardeetown Solar Power Plant (65173) |
Plant Address | 11551 NE 30 Ave, Chiefland, FL 32626 |
Utility | Duke Energy Florida, LLC (6455) |
Latitude, Longitude | 29.48562, -82.84346 |
Generation Dates on File | Apr 2023 to Feb 2025 |
Initial Operation Date | April 2023 |
Annual Generation | 147.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Florida Inc (FPC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator PV1 Details Operating April 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 74.9 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 74.9 MW |
Winter Capacity | 74.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 106.1 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Hardeetown Solar Power Plant Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#442 | Pecan Solar | Pleasant Hill, NC | 148.7 GWh |
#443 | Echo River Solar | Live Oak, FL | 146.5 GWh |
#444 | Santa Fe Solar Power Plant | Archer, FL | 148.4 GWh |
#445 | Canoe | Holt, FL | 148.4 GWh |
#446 | Chestnut Solar | Enfield, NC | 148.3 GWh |
#447 | Sawgrass Solar Energy Center | Clewiston, FL | 148.1 GWh |
#448 | Sundew | Port St Lucie, FL | 148.0 GWh |
#449 | Titan Solar 1 (CA) | Borrego Springs, CA | 147.6 GWh |
#450 | White Wing Solar | Yuma, AZ | 147.5 GWh |
#451 | Roswell Solar, LLC | Roswell, NM | 147.5 GWh |
#453 | Ghost Orchid Solar Energy Center | Clewiston, FL | 147.2 GWh |
#454 | Hibiscus Solar Energy Center | Westlake, FL | 147.0 GWh |
#455 | Blue Heron Solar | Clewiston, FL | 147.0 GWh |
#456 | Orange Blossom Solar Center | Vero Beach, FL | 146.9 GWh |
#457 | Adams Solar LLC PA | Gettysburg, PA | 146.7 GWh |
#458 | Wildflower Solar Energy Center | Arcadia, FL | 146.7 GWh |
#459 | Monarch | TBD, FL | 146.4 GWh |
#460 | Palmer Solar | Fountain, CO | 146.3 GWh |
#461 | Juniper Solar (FL) | Zephyrhills, FL | 146.2 GWh |
#462 | OE_ALD | Wing, AL | 145.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hardeetown Solar Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bay Trail Solar Power Plant | Crystal River, FL | 145.4 GWh | 35.1 mi |
Bell Ridge Solar | Trenton, FL | 190.5 GWh | 18 mi |
Butler Plaza | Gainesville, FL | 2.0 GWh | 29.4 mi |
Columbia County Solar | Fort White, FL | 48.9 GWh | 28.2 mi |
Columbia Solar Power Plant | Fort White, FL | 150.9 GWh | 28.8 mi |
County Line Renewable Energy Center | High Springs, FL | 79.7 GWh | 24.7 mi |
Crystal River | Crystal River, FL | 15.6 TWh | 37 mi |
Deerhaven Generating Station | Gainesville, FL | 709.1 GWh | 33.3 mi |
Deerhaven Renewable | Gainesville, FL | 227.1 GWh | 33.2 mi |
Gilchrist County Solar | Newberry, FL | 48.7 GWh | 13.9 mi |
High Springs Solar Power Plant | High Springs, FL | 150.9 GWh | 25.5 mi |
Hildreth Solar Power Plant | O'Brien, FL | 173.9 GWh | 33.1 mi |
Horizon Solar Energy Center | Hawthorne, FL | 112.0 GWh | 48.8 mi |
John R Kelly | Gainesville, FL | 603.3 GWh | 33.3 mi |
Santa Fe Solar Power Plant | Archer, FL | 148.4 GWh | 24.8 mi |
Solar Park Gainesville, LLC | Gainesville, FL | 1.5 GWh | 33.8 mi |
South Energy Center | Gainesville, FL | 44.0 GWh | 32 mi |
Trenton Solar Power Plant | Trenton, FL | 150.8 GWh | 10.3 mi |
Union Springs Solar Center | Lake Butler, FL | 145.5 GWh | 46.9 mi |
University of Florida | Gainesville, FL | 377.2 GWh | 31.6 mi |