Hildreth Solar Power Plant
3701 266th St, O'Brien, FL 32701Plant Summary Information
Hildreth Solar Power Plant is ranked #25 out of 221 solar farms in Florida in terms of total annual net electricity generation.
Hildreth Solar Power Plant generated 31.9 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Hildreth Solar Power Plant |
|---|---|
| Utility Name | Duke Energy Florida, LLC |
| Location | Suwannee County, FL |
| Initial Operation Date | March 2023 |
| Last Update | Feb 2026 |
| Annual Generation | 184.1 GWh |
| Annual Consumption | 667.2 k MMBtu |
| Ranked #2,624 out of 12,637 Power Plants Nationwide | |
| Ranked #489 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #88 out of 327 Florida Power Plants | |
| Ranked #25 out of 221 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of Hildreth Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hildreth Solar Power Plant.
Monthly Net Generation for Hildreth Solar Power Plant
Monthly Plant Fuel Consumption for Hildreth Solar Power Plant
Hildreth Solar Power Plant Details
| Summary Information | |
|---|---|
| Plant Name | Hildreth Solar Power Plant (65170) |
| Plant Address | 3701 266th St, O'Brien, FL 32701 |
| Utility | Duke Energy Florida, LLC (6455) |
| Latitude, Longitude | 29.96484, -82.8232 |
| Generation Dates on File | Mar 2023 to Feb 2026 |
| Initial Operation Date | March 2023 |
| Annual Generation | 184.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Florida Inc (FPC) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator PV1 Details Operating March 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 74.9 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 74.9 MW |
| Winter Capacity | 74.9 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2023 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 106.4 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Hildreth Solar Power Plant Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #479 | Georges Lake | TBD, FL | 186.5 GWh |
| #480 | OCI Alamo 5 LLC | Uvalde, TX | 186.4 GWh |
| #481 | Three Corners Solar | Unity, ME | 186.1 GWh |
| #482 | Desert Harvest II LLC | Desert Center, CA | 182.8 GWh |
| #483 | Graphite Solar I | Wellington, UT | 185.5 GWh |
| #484 | Spring Grove I | Spring Grove, VA | 185.5 GWh |
| #485 | County Line Renewable Energy Center | High Springs, FL | 185.5 GWh |
| #486 | Red Mesa Solar Project | Red Mesa, UT | 185.2 GWh |
| #487 | Parliament Solar | TX | 184.5 GWh |
| #488 | FPL Shirer Branch Solar Energy Center | Clarksville, FL | 181.0 GWh |
| #490 | Taylor Creek Solar | Orlando, FL | 183.5 GWh |
| #491 | Charlie Creek Solar Power Plant | Wauchula, FL | 183.1 GWh |
| #492 | Lancaster Solar GA | Arlington, GA | 182.2 GWh |
| #493 | Luna Valley | Mendota, CA | 182.1 GWh |
| #494 | Long Creek | TBD, FL | 182.1 GWh |
| #495 | RE Astoria | Rosamond, CA | 182.0 GWh |
| #496 | Harmony Solar (FL) | St. Cloud, FL | 181.9 GWh |
| #497 | Beautyberry | Clewiston, FL | 181.9 GWh |
| #498 | Sadler Solar | Emporia, VA | 181.9 GWh |
| #499 | Woodyard | Clewiston, FL | 181.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hildreth Solar Power Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bell Ridge Solar | Trenton, FL | 194.6 GWh | 18.3 mi |
| Columbia County Solar | Fort White, FL | 191.9 GWh | 7.8 mi |
| Columbia Solar Power Plant | Fort White, FL | 159.5 GWh | 9.5 mi |
| County Line Renewable Energy Center | High Springs, FL | 185.5 GWh | 13.7 mi |
| Deerhaven Generating Station | Gainesville, FL | 623.9 GWh | 29.7 mi |
| Deerhaven Renewable | Gainesville, FL | 519.6 GWh | 29 mi |
| Echo River Solar | Live Oak, FL | 161.4 GWh | 23 mi |
| Falmouth Renewable Energy Center | Live Oak, FL | 179.8 GWh | 32.9 mi |
| Gilchrist County Solar | Newberry, FL | 200.2 GWh | 25.6 mi |
| Hardeetown Solar Power Plant | Chiefland, FL | 170.2 GWh | 33.1 mi |
| High Springs Solar Power Plant | High Springs, FL | 165.0 GWh | 15.3 mi |
| Price Creek | TBD, FL | 19.0 GWh | 20.8 mi |
| Santa Fe Solar Power Plant | Fort White, FL | 152.7 GWh | 8 mi |
| Solar Park Gainesville, LLC | Gainesville, FL | 1.5 GWh | 34.4 mi |
| Sundance Renewable Energy Center | Lee, FL | 111.1 GWh | 35.1 mi |
| Sunshine Gateway Solar Energy Center | Lake City, FL | 132.5 GWh | 22.9 mi |
| Suwannee Solar Facility | Live Oak, FL | 16.2 GWh | 35.3 mi |
| Swift Creek Chemical Complex | White Springs, FL | 88.9 GWh | 33.8 mi |
| Trenton Solar Power Plant | Trenton, FL | 174.2 GWh | 22.8 mi |
| Union Springs Solar Center | Lake Butler, FL | 147.4 GWh | 31.3 mi |