Half Moon Solar Plant
2864 W SR 44, Lake Panasoffkee, FL 33538Plant Summary Information
Half Moon Solar Plant is ranked #152 out of 225 solar farms in Florida in terms of total annual net electricity generation.
Half Moon Solar Plant generated 54.0 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Half Moon Solar Plant |
|---|---|
| Utility Name | Duke Energy Florida, LLC |
| Location | Sumter County, FL |
| Initial Operation Date | November 2025 |
| Last Update | May 2026 |
| Annual Generation | 102.8 GWh |
| Annual Consumption | 350.8 k MMBtu |
| Ranked #3,455 out of 13,081 Power Plants Nationwide | |
| Ranked #886 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #222 out of 332 Florida Power Plants | |
| Ranked #152 out of 225 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of Half Moon Solar Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Half Moon Solar Plant.
Monthly Net Generation for Half Moon Solar Plant
Monthly Plant Fuel Consumption for Half Moon Solar Plant
Half Moon Solar Plant Details
| Summary Information | |
|---|---|
| Plant Name | Half Moon Solar Plant (69355) |
| Plant Address | 2864 W SR 44, Lake Panasoffkee, FL 33538 |
| Utility | Duke Energy Florida, LLC (6455) |
| Latitude, Longitude | 28.95562, -82.15959 |
| Generation Dates on File | Nov 2025 to May 2026 |
| Initial Operation Date | November 2025 |
| Annual Generation | 102.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Florida Inc (FPC) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator HMSP1 Details Operating November 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 74.9 MW |
| Summer Capacity | 74.9 MW |
| Winter Capacity | 74.9 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Net Metering Agreement | No |
|---|---|
| Virtual Net Metering Agreement | No |
Half Moon Solar Plant Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #876 | Ocotillo Wells | Borrego Springs, CA | 105.9 GWh |
| #877 | Salt City Solar Project - Hybrid | Circleville, OH | 105.8 GWh |
| #878 | Ranchland Solar, LLC | Moyock, NC | 105.6 GWh |
| #879 | Warsaw Farm | Warsaw, NC | 105.4 GWh |
| #880 | Little Manatee River Solar | Ruskin, FL | 105.3 GWh |
| #881 | Boulder Solar II, LLC | Boulder City, NV | 104.0 GWh |
| #882 | Wildwood Solar Plant | Tutwiler, MS | 103.6 GWh |
| #883 | Vancourt Solar Interconnections | La Feria, TX | 103.6 GWh |
| #884 | Prairie Solar LLC | Sidney, IL | 103.3 GWh |
| #885 | Oak Hill - Dry Creek | Henderson, TX | 103.1 GWh |
| #887 | Tyson Nick | Paris, TX | 102.5 GWh |
| #888 | East Point Energy Center | Sharon Springs, NY | 102.2 GWh |
| #889 | Split Rail Solar Energy LLC | Warrenton, MO | 102.2 GWh |
| #890 | Bladen Solar | Fayetteville, NC | 102.2 GWh |
| #891 | Red Horse 2 | Willcox, AZ | 148.3 GWh |
| #892 | Luning Energy | Luning, NV | 101.7 GWh |
| #893 | Beaver Dam Solar | Dodge, WI | 101.4 GWh |
| #894 | Bullock Solar, LLC | Manson, NC | 101.2 GWh |
| #895 | Sugar Solar, LLC | Yadkinville, NC | 100.9 GWh |
| #896 | Midway Solar Farm 1 | Calipatria, CA | 100.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Half Moon Solar Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bay Trail Solar Power Plant | Crystal River, FL | 165.1 GWh | 31.1 mi |
| Bronson Solar | Bronson, FL | 133.1 GWh | 45 mi |
| Butler Plaza | Gainesville, FL | 2.5 GWh | 48 mi |
| Covanta Lake County Energy | Okahumpka, FL | 84.0 GWh | 22.1 mi |
| Crystal River | Crystal River, FL | 15.7 TWh | 32.5 mi |
| Cutrale Citrus Juices USA I | Leesburg, FL | 10.9 GWh | 20.4 mi |
| G2 Energy Marion LLC | Ocala, FL | 18.0 MWh | 13.2 mi |
| Hernando | Brooksville, FL | 4.7 GWh | 28 mi |
| John R Kelly | Gainesville, FL | 680.1 GWh | 48.7 mi |
| Jumper Creek Solar Plant | Lake Panasoffkee, FL | 28.0 GWh | 1 mi |
| Mount Dora Solar Farm F | Mount Dora, FL | 4.5 GWh | 30.5 mi |
| Mount Dora Solar Farm W | Mount Dora, FL | 3.5 GWh | 34.3 mi |
| Mountain View Solar (FL) | Dade City, FL | 97.9 GWh | 38.7 mi |
| Pasco Cnty Solid Waste Resource Recovery | Spring Hill, FL | 186.1 GWh | 47.2 mi |
| Rattler Solar Plant | Brookesville, FL | 98.2 GWh | 23.5 mi |
| Shady Hills Generating Station | Shady Hills, FL | 398.1 GWh | 47.4 mi |
| South Energy Center | Gainesville, FL | 42.5 GWh | 48.4 mi |
| Twin Lakes | Interlachen, FL | 131.6 GWh | 49.2 mi |
| University of Florida | Gainesville, FL | 388.2 GWh | 48.7 mi |
| Whistling Duck I | Williston, FL | 80.5 GWh | 39.3 mi |