Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Merced Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2014 | Dec 2024 | Solar |
Merced Falls | Merced Irrigation District | Snelling, CA | California Independent System Operator (CISO) | 9.4 GWh | Jun 1930 | Oct 2024 | Water |
Merced 1 PV | ZGlobal Inc | Los Banos, CA | California Independent System Operator (CISO) | 6.5 GWh | Mar 2018 | Dec 2024 | Solar |
Medline Ind. Phase 2 Tracy | EnterSolar | Tracy, CA | California Independent System Operator (CISO) | 2.0 GWh | Mar 2018 | Dec 2024 | Solar |
McSwain | Merced Irrigation District | Snelling, CA | California Independent System Operator (CISO) | 31.8 GWh | Jun 1967 | Dec 2024 | Water |
McKittrick Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 10.4 GWh | Sep 1991 | Mar 2025 | Natural Gas |
McKittrick Cogen | Chevron USA Inc | McKittrick, CA | California Independent System Operator (CISO) | 67.5 GWh | May 2012 | Dec 2024 | Natural Gas |
McGrath Peaker | Southern California Edison Co | Oxnard, CA | California Independent System Operator (CISO) | 7.4 GWh | Oct 2012 | Dec 2024 | Natural Gas |
McCoy Solar Energy Project Hybrid | McCoy Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 646.7 GWh | Jul 2015 | Dec 2024 | Solar |
McClure | Modesto Irrigation District | Modesto, CA | Balancing Authority of Northern California (BANC) | 2.7 GWh | Jun 1980 | Dec 2024 | Natural Gas : 72.6% Distillate Fuel Oil : 27.4% |
McClellan (CA) | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.4 GWh | Feb 1986 | Dec 2024 | Natural Gas |
MCAGCC Cogen Plant | DOD USMC Marine Air Ground Combat | Twentynine Palms, CA | California Independent System Operator (CISO) | 69.2 GWh | Jan 2003 | Dec 2024 | Natural Gas |
Maxim | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.0 GWh | Jul 2014 | Dec 2024 | Natural Gas |
Maverick Solar, LLC | Maverick Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 372.4 GWh | Nov 2020 | May 2025 | Solar |
Maverick Solar 7, LLC | Maverick Solar 7, LLC | Desert Center, CA | California Independent System Operator (CISO) | 324.3 GWh | Nov 2021 | May 2025 | Solar |
Maverick Solar 6, LLC | Maverick Solar 6, LLC | Desert Center, CA | California Independent System Operator (CISO) | 236.8 GWh | Oct 2021 | May 2025 | Solar |
Maverick Solar 4, LLC | Maverick Solar 4, LLC | Desert Center, CA | California Independent System Operator (CISO) | 265.5 GWh | Nov 2020 | May 2025 | Solar |
Martinez Sulfuric Acid Regeneration Plt | Eco Services Corp. | Martinez, CA | California Independent System Operator (CISO) | 17.3 GWh | Dec 1977 | Dec 2024 | Waste Heat |
Martinez Refining | Martinez Refining Co | Martinez, CA | California Independent System Operator (CISO) | 783.9 GWh | Oct 1995 | May 2025 | Natural Gas : 96.2% Other Gas : 3.8% |
Marsh Landing Generating Station | Marsh Landing LLC | Antioch, CA | California Independent System Operator (CISO) | 118.9 GWh | Apr 2013 | May 2025 | Natural Gas |
Mariposa Energy Project | Diamond Generating Corporation | Byron, CA | California Independent System Operator (CISO) | 74.7 GWh | Sep 2012 | May 2025 | Natural Gas |
Marina South | Altus Power America Management, LLC | San Pedro, CA | California Independent System Operator (CISO) | 1.8 GWh | Nov 2020 | Dec 2024 | Solar |
Marina Landfill Gas | Monterey Regional Waste Mgmt | Marina, CA | California Independent System Operator (CISO) | 22.8 GWh | Mar 1998 | Dec 2024 | Landfill Gas |
Marin Clean Energy Solar One | AES Distributed Energy | Richmond, CA | California Independent System Operator (CISO) | 21.3 GWh | Nov 2017 | Dec 2024 | Solar |
Maricopa West Solar PV, LLC | Onward Energy | Taft, CA | California Independent System Operator (CISO) | 47.6 GWh | Nov 2015 | Dec 2024 | Solar |
Mariani Packing Vacaville Solar | SunE U6 Holdings LLC | Vacaville, CA | California Independent System Operator (CISO) | 1.3 GWh | Oct 2008 | Dec 2024 | Solar |
Marathon Bay Area Cogen | Tesoro Marketing & Refining Co. LLC (Martinez) | Martinez, CA | California Independent System Operator (CISO) | 643.7 GWh | Jan 1987 | May 2025 | Natural Gas |
Manzana Wind LLC | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 543.7 GWh | Nov 2012 | Dec 2024 | Wind |
Manteca Land PV | AES Distributed Energy | Manteca, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2017 | Dec 2024 | Solar |
Mammoth Pool | Southern California Edison Co | North Fork, CA | California Independent System Operator (CISO) | 458.4 GWh | Feb 1960 | May 2025 | Water |
Mammoth G3 | Ormat Nevada Inc | Mammoth Lakes, CA | California Independent System Operator (CISO) | 103.1 GWh | Nov 1990 | Dec 2024 | Geothermal |
Mammoth G2 | Ormat Nevada Inc | Mammoth Lakes, CA | California Independent System Operator (CISO) | 82.3 GWh | Nov 1990 | Dec 2024 | Geothermal |
Mammoth G1 | Ormat Nevada Inc | Mammoth lakes, CA | California Independent System Operator (CISO) | 59.6 GWh | Nov 1984 | Dec 2024 | Geothermal |
Malech Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 4.8 GWh | Sep 2017 | Dec 2024 | Solar |
Malburg | City of Vernon | Vernon, CA | California Independent System Operator (CISO) | 363.7 GWh | Sep 2005 | May 2025 | Natural Gas |
Malaga Power LLC | CalPeak Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 15.9 GWh | Aug 2005 | May 2025 | Natural Gas |
Magnolia Power Project | City of Burbank Water and Power | Burbank, CA | Los Angeles Department of Water and Power (LDWP) | 1.3 TWh | Aug 2005 | May 2025 | Natural Gas |
Madera Community Hospital | CleanCapital Holdings | Madera, CA | California Independent System Operator (CISO) | 72.0 MWh | Sep 2011 | Dec 2024 | Solar |
Madera 1 PV | ZGlobal Inc | Madera, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2017 | Dec 2024 | Solar |
Madelyn Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2014 | Dec 2024 | Solar |
Maclay Solar Project | Los Angeles Department of Water & Power | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 1.9 GWh | Mar 2017 | Jan 2024 | Solar |
Ma | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2013 | Dec 2024 | Solar |
Lundy | Southern California Edison Co | Lee Vining, CA | California Independent System Operator (CISO) | 7.3 GWh | Nov 1911 | Dec 2024 | Water |
Luciana | Tulare Solar Center, LLC | Richgrove, CA | California Independent System Operator (CISO) | 132.7 GWh | Mar 2022 | May 2025 | Solar |
Lost Hills Oilfield | Distributed Solar Development, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 4.5 GWh | Jun 2021 | Dec 2024 | Solar |
Lost Hills Cogeneration Plant | AERA Energy LLC | Lost Hills, CA | California Independent System Operator (CISO) | 9.2 GWh | Sep 1985 | Dec 2024 | Natural Gas |
Lost Hills/Blackwell | Southern Power Co | Lost Hills, CA | California Independent System Operator (CISO) | 80.6 GWh | Mar 2015 | Dec 2024 | Solar |
Lost Creek I | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 5.1 GWh | Nov 1989 | Dec 2024 | Water |
Los Medanos Energy Center | Los Medanos Energy Center LLC | Pittsburg, CA | California Independent System Operator (CISO) | 3.1 TWh | Jul 2001 | Feb 2025 | Natural Gas |
Los Esteros Critical Energy Center | Los Esteros Critical Energy Facility LLC | San Jose, CA | California Independent System Operator (CISO) | 207.7 GWh | Jan 2003 | May 2025 | Natural Gas |
Los Angeles Refinery Wilmington | Phillips 66 - Los Angeles | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 393.9 GWh | Apr 1984 | May 2025 | Other Gas : 57.9% Natural Gas : 42.1% |
Los Angeles Harbor College | Los Angeles Community College District | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 2.5 GWh | Sep 2010 | Dec 2024 | Solar |
Loon Lake | Sacramento Municipal Util Dist | Fresh Pond, CA | Balancing Authority of Northern California (BANC) | 63.2 GWh | Aug 1971 | Dec 2024 | Water |
Longboat Solar, LLC | Duke Energy Renewables Services | Barstow, CA | California Independent System Operator (CISO) | 41.1 GWh | Nov 2016 | Dec 2024 | Solar |
Long Beach Generation LLC | Long Beach Generation LLC | Long Beach, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 1976 | Dec 2024 | Natural Gas |
Lone Valley Solar Park II LLC | Lone Valley Solar Park II LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 49.5 GWh | Nov 2014 | Dec 2024 | Solar |
Lone Valley Solar Park I LLC | Lone Valley Solar Park I LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 23.6 GWh | Nov 2014 | Dec 2024 | Solar |
Lone Oak | Bravo REC Management LLC | Hanford, CA | California Independent System Operator (CISO) | 5.7 GWh | Feb 2023 | Dec 2024 | Solar |
Loma Linda University Cogen | Loma Linda University | Loma Linda, CA | California Independent System Operator (CISO) | 64.5 GWh | Jan 1980 | May 2025 | Natural Gas |
Lodi Energy Center | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 794.4 GWh | Oct 2012 | May 2025 | Natural Gas |
Lodi | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 2.8 GWh | Jan 1986 | Dec 2024 | Natural Gas |
Lockhart Solar PV, LLC | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 230.6 GWh | Nov 1989 | May 2025 | Solar |
Lockhart Solar PV II | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 195.8 GWh | Jun 2023 | May 2025 | Solar |
Lockhart ESS, LLC | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 27.7 GWh | Jun 2024 | May 2025 | Electricity used for energy storage |
Live Oak Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 12.0 GWh | Feb 1992 | May 2025 | Natural Gas |
Little Rock Pham Solar | Terraform Arcadia | Palmdale, CA | Los Angeles Department of Water and Power (LDWP) | 7.6 GWh | Nov 2015 | Dec 2024 | Solar |
Little Bear Solar 1, LLC | Little Bear Solar 1, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 88.7 GWh | Nov 2020 | May 2025 | Solar |
Little Bear 5 | Little Bear Solar 5, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 118.8 GWh | Nov 2020 | May 2025 | Solar |
Little Bear 4 | Little Bear Solar 4, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 49.0 GWh | Nov 2020 | May 2025 | Solar |
Little Bear 3 | Little Bear Solar 3, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 26.2 GWh | Nov 2020 | Dec 2024 | Solar |
Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2013 | Dec 2024 | Solar |
Lindberg Field Solar 2 | Lindberg Field Solar 2, LLC | San Diego, CA | California Independent System Operator (CISO) | 1.7 GWh | Jan 2017 | Dec 2024 | Solar |
Lindberg FIeld Solar | Lindberg Field Solar I LLC | San Diego, CA | California Independent System Operator (CISO) | 4.6 GWh | Aug 2015 | Dec 2023 | Solar |
Lincoln WWTF Hybrid | Lincoln Solar Star, LLC | Lincoln, CA | California Independent System Operator (CISO) | 6.4 GWh | Jul 2021 | Dec 2024 | Solar |
Lincoln Landfill | Energy 2001 Inc | Lincoln, CA | California Independent System Operator (CISO) | 29.5 GWh | Oct 2004 | Dec 2024 | Landfill Gas |
Life Technologies - Pleasanton | Bloom Energy | Pleasanton, CA | California Independent System Operator (CISO) | 8.5 GWh | Feb 2013 | Dec 2024 | Natural Gas |
Life Technologies - Fremont | Bloom Energy | Fremont, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2020 | Dec 2024 | Natural Gas |
Life Technologies Carlsbad | Bloom Energy | Carlsbad, CA | California Independent System Operator (CISO) | 8.6 GWh | Jul 2012 | Dec 2024 | Natural Gas |
Liberty HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
Lemoore West | Leprino Foods | Lemoore, CA | California Independent System Operator (CISO) | 14.4 GWh | Nov 2022 | Dec 2024 | Solar |
Lemoore 1 | AES Distributed Energy | Lemoore, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2016 | Dec 2024 | Solar |
Lavio Solar | Lavio Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2018 | Dec 2024 | Solar |
Las Virgenes Municipal Water District | Tesla Inc. | Calabasas, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2014 | Dec 2024 | Solar |
Las Virgenes | Greenbacker Renewable Energy Corporation | Calabasas, CA | Los Angeles Department of Water and Power (LDWP) | 7.1 GWh | Nov 2020 | Dec 2024 | Solar |
Larkspur Energy Facility | Diamond Generating Corporation | San Diego, CA | California Independent System Operator (CISO) | 24.4 GWh | Jun 2001 | Dec 2024 | Natural Gas |
Laredo Detention Facility - Solar 2, 3 | County of Kern | Bakersfield, CA | California Independent System Operator (CISO) | 5.1 GWh | Oct 2021 | Dec 2024 | Solar |
Lancaster WAD B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 7.5 GWh | Mar 2017 | Dec 2024 | Solar |
Lancaster Solar 2 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2024 | Solar |
Lancaster Solar 1 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2014 | Dec 2024 | Solar |
Lancaster Little Rock | AES Distributed Energy | Landers, CA | California Independent System Operator (CISO) | 3.0 GWh | Nov 2014 | Dec 2024 | Solar |
Lancaster Dry Farm Ranch B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 7.8 GWh | Oct 2014 | Dec 2024 | Solar |
Lancaster Baptist Church | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2011 | Dec 2024 | Solar |
Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.1 GWh | Oct 2018 | Dec 2024 | Solar |
Lambie Energy Center | Gilroy Energy Center LLC | Suisun, CA | California Independent System Operator (CISO) | 9.7 GWh | Dec 2002 | Dec 2024 | Natural Gas |
Lake One | City of Burbank Water and Power | Burbank, CA | Los Angeles Department of Water and Power (LDWP) | 285.0 MWh | May 2002 | Dec 2024 | Natural Gas |
Lake Mendocino | City of Ukiah - (CA) | Ukiah, CA | California Independent System Operator (CISO) | 12.3 GWh | Apr 1987 | Dec 2024 | Water |
Lake Mathews | Metropolitan Water District of S CA | Riverside, CA | California Independent System Operator (CISO) | 8.0 GWh | Jul 1980 | Jul 2024 | Water |
Lake Herman | Greenbacker Renewable Energy Corporation | Benicia, CA | California Independent System Operator (CISO) | 13.0 GWh | Oct 2021 | Dec 2024 | Solar |
Lake Elsinore Canopies - Lakeside HS | Standard Solar | Lake Elsinore, CA | California Independent System Operator (CISO) | 1.8 GWh | Feb 2022 | Dec 2024 | Solar |
Laguna Water Reclamation Facility | City of Santa Rosa | Santa Rosa, CA | California Independent System Operator (CISO) | 11.2 GWh | Feb 2013 | Dec 2024 | Other Biomass Gas : 85.8% Natural Gas : 14.2% |
Browse Power Plants By California Counties
Figures are based on December 2024 generation numbers.County | State Rank | Active Plants | Dec 2024 Generation |
---|---|---|---|
Mendocino County, CA | # 55 | 5 | 12.3 GWh |
Glenn County, CA | # 54 | 2 | 18.7 GWh |
Marin County, CA | # 53 | 3 | 19.0 GWh |
Sierra County, CA | # 52 | 3 | 31.4 GWh |
Napa County, CA | # 51 | 9 | 49.2 GWh |
Santa Cruz County, CA | # 50 | 6 | 56.2 GWh |
Tehama County, CA | # 49 | 7 | 59.7 GWh |
San Francisco County, CA | # 48 | 10 | 84.6 GWh |
San Mateo County, CA | # 47 | 10 | 133.3 GWh |
Nevada County, CA | # 46 | 12 | 207.0 GWh |
Yolo County, CA | # 45 | 15 | 222.2 GWh |
Siskiyou County, CA | # 44 | 8 | 242.5 GWh |
Mariposa County, CA | # 43 | 2 | 299.7 GWh |
Santa Barbara County, CA | # 42 | 18 | 334.0 GWh |
Lassen County, CA | # 41 | 9 | 341.0 GWh |
San Benito County, CA | # 40 | 6 | 346.0 GWh |
Humboldt County, CA | # 39 | 10 | 469.7 GWh |
Merced County, CA | # 38 | 30 | 475.2 GWh |
Calaveras County, CA | # 37 | 6 | 542.0 GWh |
Trinity County, CA | # 36 | 5 | 560.5 GWh |
Amador County, CA | # 35 | 8 | 659.7 GWh |
Mono County, CA | # 34 | 9 | 785.9 GWh |
Ventura County, CA | # 33 | 32 | 825.9 GWh |
Lake County, CA | # 32 | 10 | 912.2 GWh |
Madera County, CA | # 31 | 28 | 1.0 TWh |
Tulare County, CA | # 30 | 68 | 1.1 TWh |
Inyo County, CA | # 29 | 23 | 1.2 TWh |
El Dorado County, CA | # 28 | 15 | 1.4 TWh |
County | State Rank | Active Plants | Dec 2024 Generation |
---|---|---|---|
Yuba County, CA | # 27 | 5 | 1.6 TWh |
Sutter County, CA | # 26 | 8 | 1.9 TWh |
Plumas County, CA | # 25 | 13 | 2.0 TWh |
Placer County, CA | # 24 | 23 | 2.0 TWh |
San Joaquin County, CA | # 23 | 45 | 2.3 TWh |
Alameda County, CA | # 22 | 46 | 2.5 TWh |
Stanislaus County, CA | # 21 | 25 | 2.7 TWh |
Tuolumne County, CA | # 20 | 23 | 2.8 TWh |
Colusa County, CA | # 19 | 3 | 2.9 TWh |
Solano County, CA | # 18 | 40 | 3.1 TWh |
Orange County, CA | # 17 | 59 | 3.3 TWh |
Butte County, CA | # 16 | 25 | 3.6 TWh |
Monterey County, CA | # 15 | 29 | 3.7 TWh |
Kings County, CA | # 14 | 57 | 4.1 TWh |
Santa Clara County, CA | # 13 | 74 | 4.4 TWh |
San Diego County, CA | # 12 | 150 | 5.1 TWh |
Sonoma County, CA | # 11 | 26 | 5.3 TWh |
Sacramento County, CA | # 10 | 64 | 6.5 TWh |
Shasta County, CA | # 9 | 46 | 7.4 TWh |
Fresno County, CA | # 8 | 109 | 7.9 TWh |
Imperial County, CA | # 7 | 84 | 9.7 TWh |
San Bernardino County, CA | # 6 | 203 | 13.3 TWh |
Contra Costa County, CA | # 5 | 56 | 13.6 TWh |
Riverside County, CA | # 4 | 159 | 14.5 TWh |
San Luis Obispo County, CA | # 3 | 22 | 20.7 TWh |
Los Angeles County, CA | # 2 | 307 | 20.8 TWh |
Kern County, CA | # 1 | 311 | 34.4 TWh |