Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| SJ/SC WPCP | San Jose/Santa Clara Water P C | San Jose, CA | California Independent System Operator (CISO) | 67.0 GWh | Jan 1953 | Jun 2026 | Natural Gas : 54.1% Other Biomass Gas : 45.7% |
| Grapeland Hybrid | Southern California Edison Co | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 2.2 GWh | Aug 2007 | Dec 2025 | Natural Gas |
| Palomar Energy | San Diego Gas & Electric Co | Escondido, CA | California Independent System Operator (CISO) | 1.2 TWh | Sep 2005 | Jun 2026 | Natural Gas |
| Goose Haven Energy Center | Goose Haven Energy Center | Suisun, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2002 | Dec 2025 | Natural Gas |
| Pastoria Energy Facility, LLC | Calpine Corp - Pastoria Energy Center | Lebec, CA | California Independent System Operator (CISO) | 3.1 TWh | Apr 2005 | Jun 2026 | Natural Gas |
| Sonoma Central Landfill Phase II | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 1.8 GWh | May 1996 | Dec 2025 | Landfill Gas |
| Clearwater Power Plant | City of Riverside - (CA) | Corona, CA | California Independent System Operator (CISO) | 3.5 GWh | Feb 2005 | Dec 2025 | Natural Gas |
| Buena Vista Energy LLC | Leeward Asset Management, LLC | Byron, CA | California Independent System Operator (CISO) | 96.1 GWh | Nov 2006 | Dec 2025 | Wind |
| Gateway Generating Station | Pacific Gas & Electric Co. | Antioch, CA | California Independent System Operator (CISO) | 2.4 TWh | Dec 2008 | Jun 2026 | Natural Gas |
| Center Hybrid | Southern California Edison Co | Norwalk, CA | California Independent System Operator (CISO) | 2.0 GWh | Aug 2007 | Dec 2025 | Natural Gas |
| Barre Peaker | Southern California Edison Co | Stanton, CA | California Independent System Operator (CISO) | 5.4 GWh | Aug 2007 | Dec 2025 | Natural Gas |
| Mira Loma Peaker | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 1.1 GWh | Aug 2007 | Dec 2025 | Natural Gas |
| WWTP Power Generation Station | East Bay Municipal Util Dist - (CA) | Oakland, CA | California Independent System Operator (CISO) | 31.4 GWh | Jul 1985 | Jun 2026 | Other Biomass Gas : 98.9% Distillate Fuel Oil : 1.1% |
| McGrath Peaker | Southern California Edison Co | Oxnard, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2012 | Dec 2025 | Natural Gas |
| Sonoma Central Landfill Phase I | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 583.0 MWh | Jun 1993 | Dec 2025 | Landfill Gas |
| Los Esteros Critical Energy Center | Los Esteros Critical Energy Facility LLC | San Jose, CA | California Independent System Operator (CISO) | 169.1 GWh | Jan 2003 | Jun 2026 | Natural Gas |
| Russell City Energy Center | Russell City Energy Company LLC | Hayward, CA | California Independent System Operator (CISO) | 1.6 TWh | Jul 2013 | Jun 2026 | Natural Gas |
| Elk Hills Cogen | California Resources Elk Hills LLC | Tupman, CA | California Independent System Operator (CISO) | 101.8 GWh | Oct 1994 | Jun 2026 | Natural Gas |
| Hanford Energy Park Peaker | MRP San Joaquin Energy LLC. | Hanford, CA | California Independent System Operator (CISO) | 1.8 GWh | Aug 2001 | Jun 2026 | Natural Gas |
| Agua Mansa Power Plant | E I Colton LLC | Colton, CA | California Independent System Operator (CISO) | 3.8 GWh | May 2003 | Dec 2025 | Natural Gas |
| Riverview Energy Center | Gilroy Energy Center for Riverview | Antioch, CA | California Independent System Operator (CISO) | 12.3 GWh | Apr 2003 | Dec 2025 | Natural Gas |
| Shiloh I Wind Project | Avangrid Power LLC | Rio Vista, CA | California Independent System Operator (CISO) | 400.0 GWh | Apr 2006 | Dec 2025 | Wind |
| Mountain View I & II | AES Distributed Energy | North Palm Springs, CA | California Independent System Operator (CISO) | 252.5 GWh | May 2001 | Jun 2026 | Wind |
| Drews Generating Facility | Colton Power LP | Colton, CA | California Independent System Operator (CISO) | 570.0 MWh | Jul 2001 | Dec 2025 | Natural Gas |
| H. Gonzales | City of Vernon - (CA) | Vernon, CA | California Independent System Operator (CISO) | 29.4 MWh | Dec 1986 | Dec 2025 | Natural Gas |
| Donald Von Raesfeld Power Plant | City of Santa Clara - (CA) | Santa Clara, CA | California Independent System Operator (CISO) | 903.3 GWh | Feb 2005 | Jun 2026 | Natural Gas |
| King City Peaking | Calpine Corp-King City | King City, CA | California Independent System Operator (CISO) | 5.4 GWh | Mar 2002 | Dec 2025 | Natural Gas |
| Gilroy Peaking Energy Center | Calpine Gilroy Cogen LP | Gilroy, CA | California Independent System Operator (CISO) | 30.9 GWh | Oct 2001 | Dec 2025 | Natural Gas |
| Henrietta Peaker | MRP San Joaquin Energy LLC. | Lemoore, CA | California Independent System Operator (CISO) | 4.3 GWh | May 2002 | Jun 2026 | Natural Gas |
| Whitewater Hill Wind Partners | Shell Wind Energy Inc. | North Palm Springs, CA | California Independent System Operator (CISO) | 126.6 GWh | Sep 2002 | Dec 2025 | Wind |
| Feather River Energy Center | Calpine Corp-Yuba City | Yuba City, CA | California Independent System Operator (CISO) | 35.4 GWh | Dec 2002 | Dec 2025 | Natural Gas |
| Valero Refinery Cogeneration Unit 1 | Valero Refining Co California | Benicia, CA | California Independent System Operator (CISO) | 236.7 GWh | Sep 2002 | Feb 2026 | Natural Gas : 85.2% Other Gas : 14.8% |
| Cabazon Wind Partners | Shell Wind Energy Inc. | Cabazon, CA | California Independent System Operator (CISO) | 107.7 GWh | Sep 2002 | Dec 2025 | Wind |
| Wolfskill Energy Center | Gilroy Energy Center LLC | Fairfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Dec 2002 | Dec 2025 | Natural Gas |
| Ameresco Santa Cruz Energy | AMERESCO Santa Cruz Energy LLC | Watsonville, CA | California Independent System Operator (CISO) | 13.8 GWh | Dec 2005 | Dec 2025 | Landfill Gas |
| Wellhead Power Panoche | Wellhead Services, Inc | Firebaugh, CA | California Independent System Operator (CISO) | 6.8 GWh | Jul 1973 | Dec 2025 | Natural Gas |
| Tracy Combined Cycle Power Plant | MRP San Joaquin Energy LLC. | Tracy, CA | California Independent System Operator (CISO) | 655.2 GWh | Mar 2003 | Jun 2026 | Natural Gas |
| Bear Valley Power Plant | Bear Valley Electric Service | Big Bear Lake, CA | California Independent System Operator (CISO) | 2.4 GWh | Dec 2004 | Dec 2025 | Natural Gas |
| Century Generating Facility | Colton Power LP | Colton, CA | California Independent System Operator (CISO) | 563.0 MWh | Aug 2001 | Dec 2025 | Natural Gas |
| Creed Energy Center | Creed Energy Center LLC | Suisun, CA | California Independent System Operator (CISO) | 2.6 GWh | Dec 2002 | Dec 2025 | Natural Gas |
| Lambie Energy Center | Gilroy Energy Center LLC | Suisun, CA | California Independent System Operator (CISO) | 5.4 GWh | Dec 2002 | Dec 2025 | Natural Gas |
| Imperial Solar Energy Center South | CSOLAR IV South LLC | Calexico, CA | California Independent System Operator (CISO) | 251.1 GWh | Oct 2013 | Dec 2025 | Solar |
| Imperial Valley Solar, LLC | Imperial Valley Solar, LLC | Calexico, CA | California Independent System Operator (CISO) | 441.7 GWh | Oct 2013 | Dec 2025 | Solar |
| Teichert Materials-Teichert Vernalis | Foundation HA Energy Generation, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 1.6 GWh | Sep 2010 | Dec 2025 | Wind |
| Imperial Solar Energy Center West | CSOLAR IV West LLC | Seeley, CA | California Independent System Operator (CISO) | 357.0 GWh | Mar 2016 | Dec 2025 | Solar |
| Orange Grove Peaking Facility | Orange Grove Energy LP | Pala, CA | California Independent System Operator (CISO) | 9.1 GWh | May 2010 | Dec 2025 | Natural Gas |
| Westside Solar Station | Pacific Gas & Electric Co. | Five Points, CA | California Independent System Operator (CISO) | 12.0 GWh | Jul 2011 | Dec 2025 | Solar |
| Manzana Wind LLC | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 519.3 GWh | Nov 2012 | Dec 2025 | Wind |
| Hatchet Ridge Wind Project | Pattern Operators LP | Burney, CA | California Independent System Operator (CISO) | 271.3 GWh | Nov 2010 | Dec 2025 | Wind |
| Mariposa Energy Project | Diamond Generating Corporation | Byron, CA | California Independent System Operator (CISO) | 22.8 GWh | Sep 2012 | Jun 2026 | Natural Gas |
| Sentinel Energy Center, LLC | Sentinel Energy Center LLC | Desert Hot Springs, CA | California Independent System Operator (CISO) | 123.0 GWh | Apr 2013 | Jun 2026 | Natural Gas |
| Rising Tree Wind Farm | Rising Tree Wind Farm LLC | Mojave, CA | California Independent System Operator (CISO) | 250.4 GWh | Dec 2014 | Dec 2025 | Wind |
| Foundation ST | Foundation HA Energy Generation, LLC | Tracy, CA | California Independent System Operator (CISO) | 2.4 GWh | May 2011 | Dec 2025 | Wind |
| Midway Peaking LLC | CalPeak Power, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 6.5 GWh | Apr 2009 | Dec 2025 | Natural Gas |
| Garnet Wind Energy Center | Terra-Gen Operating Co-Wind | North Palm Springs, CA | California Independent System Operator (CISO) | 16.8 GWh | May 2009 | Dec 2025 | Wind |
| Giffen | Pacific Gas & Electric Co. | TBD, CA | California Independent System Operator (CISO) | 11.6 GWh | May 2012 | Dec 2025 | Solar |
| CCCSD Wastewater Treatment Plnt | Central Contra Costa Sanitary District | Martinez, CA | California Independent System Operator (CISO) | 20.1 GWh | Nov 1995 | Jun 2026 | Natural Gas |
| Robert O Schulz Solar Farm | South San Joaquin Irr District | Oakdale, CA | California Independent System Operator (CISO) | 3.9 GWh | Apr 2008 | Dec 2025 | Solar |
| Panoche Energy Center | Panoche Energy Center, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 649.6 GWh | May 2009 | Jun 2026 | Natural Gas |
| Broadridge Cogen | Broadridge Customer Communications | El Dorado Hills, CA | California Independent System Operator (CISO) | 15.8 GWh | Apr 2008 | Dec 2024 | Natural Gas : 91.9% Solar : 8.1% |
| Algonquin Power Sanger LLC | Clearlight Energy Sanger LLC | Sanger, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2007 | May 2026 | Natural Gas |
| Sunset Reservoir North Basin | Deriva Energy | San Francisco, CA | California Independent System Operator (CISO) | 6.4 GWh | Aug 2010 | Dec 2025 | Solar |
| Sunnyvale City of WPCP | City of Sunnyvale WPCP - (CA) | Sunnyvale, CA | California Independent System Operator (CISO) | 7.5 GWh | Oct 1997 | Dec 2025 | Other Biomass Gas : 41.3% Landfill Gas : 36.4% Natural Gas : 22.3% |
| CSU Fresno Solar Project | MMA Fresno Power LP | Fresno, CA | California Independent System Operator (CISO) | 1.3 GWh | Nov 2007 | Dec 2025 | Solar |
| Pio Pico Energy Center | Pio Pico Energy Center LLC | San Diego, CA | California Independent System Operator (CISO) | 46.9 GWh | Oct 2016 | Dec 2025 | Natural Gas |
| University of California San Diego Hybri | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 232.0 GWh | Jun 2001 | Jun 2026 | Natural Gas |
| Shiloh Wind Project 2 LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 369.0 GWh | Dec 2008 | Dec 2025 | Wind |
| Huron Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 28.1 GWh | May 2012 | Dec 2025 | Solar |
| Cantua Solar Station | Pacific Gas & Electric Co. | TBD, CA | California Independent System Operator (CISO) | 23.0 GWh | May 2012 | Dec 2025 | Solar |
| Gap Pacific Distribution Center | MN8 Energy LLC | Fresno, CA | California Independent System Operator (CISO) | 5.4 GWh | Sep 2008 | Dec 2025 | Solar |
| Oxnard Paper Mill | New-Indy, Oxnard LLC | Oxnard, CA | California Independent System Operator (CISO) | 165.5 GWh | Feb 1986 | Jun 2026 | Natural Gas |
| Walnut Creek Energy Park | Walnut Creek LLC | Industry, CA | California Independent System Operator (CISO) | 36.4 GWh | Mar 2013 | Jun 2026 | Natural Gas |
| Ocotillo Express LLC | Pattern Operators LP | Ocotillo, CA | California Independent System Operator (CISO) | 402.1 GWh | Nov 2012 | Jun 2026 | Wind |
| Ameresco Ox Mountain | AMERESCO Ox Mountain Energy LLC | Half Moon Bay, CA | California Independent System Operator (CISO) | 80.9 GWh | Nov 2008 | Jun 2026 | Landfill Gas |
| FRV SI Transport Solar LP | FRV SI Transport Solar, L.P. (Sacremento) | Sacramento, CA | California Independent System Operator (CISO) | 1.3 GWh | Jul 2010 | Dec 2025 | Solar |
| Shiloh III Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 282.0 GWh | Nov 2011 | Dec 2025 | Wind |
| CalRenew-1 | CalRenew-1 LLC | Mendota, CA | California Independent System Operator (CISO) | 1.9 GWh | Mar 2010 | Dec 2025 | Solar |
| Ameresco Keller Canyon | AMERESCO Keller Canyon LLC | Bay Point, CA | California Independent System Operator (CISO) | 15.8 GWh | Jun 2009 | Dec 2025 | Landfill Gas |
| Ameresco Chiquita Canyon | AMERESCO Chiquita Canyon LLC | Castaic, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2010 | Dec 2024 | Landfill Gas |
| Dillon Wind LLC | Avangrid Power LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 138.3 GWh | Mar 2008 | Dec 2025 | Wind |
| Five Points Solar Station | Pacific Gas & Electric Co. | Five Points, CA | California Independent System Operator (CISO) | 12.6 GWh | Aug 2011 | Dec 2025 | Solar |
| Stroud Solar Station | Pacific Gas & Electric Co. | Helm, CA | California Independent System Operator (CISO) | 14.9 GWh | Aug 2011 | Dec 2025 | Solar |
| Sun City Project LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 33.4 GWh | Jul 2011 | Dec 2025 | Solar |
| Alta Wind Energy Center III | Alta Wind III, LLC | Mojave, CA | California Independent System Operator (CISO) | 318.3 GWh | Jan 2011 | Dec 2025 | Wind |
| Vaca Dixon Solar Station | Pacific Gas & Electric Co. | Vacaville, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2009 | Dec 2025 | Solar |
| Alta Wind Energy Center II | Alta Wind II, LLC | Mojave, CA | California Independent System Operator (CISO) | 318.3 GWh | Dec 2010 | Dec 2025 | Wind |
| Alta Wind Energy Center I | Alta Wind I, LLC | Mojave, CA | California Independent System Operator (CISO) | 399.8 GWh | Dec 2010 | Dec 2025 | Wind |
| Mojave Solar Project | Mojave Solar LLC | Hinkley, CA | California Independent System Operator (CISO) | 595.9 GWh | Nov 2014 | Jun 2026 | Solar |
| CM48 | RWE Clean Energy | Boulder City, NV | California Independent System Operator (CISO) | 89.7 GWh | May 2010 | Dec 2025 | Solar |
| FPL Energy Montezuma Winds LLC | FPL Energy Montezuma Wind | Birds Landing, CA | California Independent System Operator (CISO) | 95.5 GWh | Oct 2010 | Dec 2025 | Wind |
| Panoche Valley Solar Farm | RWE Clean Energy | Paicines, CA | California Independent System Operator (CISO) | 235.3 GWh | Dec 2017 | Jun 2026 | Solar |
| Calabasas Gas to Energy Facility | Los Angeles County Sanitation | Agoura, CA | California Independent System Operator (CISO) | 31.9 GWh | Jun 2010 | Dec 2025 | Landfill Gas |
| Avenal Park | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 10.0 GWh | Jul 2011 | Dec 2025 | Solar |
| Marsh Landing Generating Station | Marsh Landing LLC | Antioch, CA | California Independent System Operator (CISO) | 18.4 GWh | Apr 2013 | Jun 2026 | Natural Gas |
| Sand Drag LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 31.9 GWh | Jul 2011 | Dec 2025 | Solar |
| G2 Energy Ostrom Road LLC | G2 Energy LLC | Wheatland, CA | California Independent System Operator (CISO) | 27.7 GWh | Jan 2009 | Dec 2025 | Landfill Gas |
| Agua Caliente Solar Project | Agua Caliente Solar | Dateland, AZ | California Independent System Operator (CISO) | 514.5 GWh | Apr 2012 | Jun 2026 | Solar |
| AV Solar Ranch One | AV Solar Ranch 1 LLC | Lancaster, CA | California Independent System Operator (CISO) | 560.8 GWh | Jul 2014 | Jun 2026 | Solar |
| UCI Facilities Management Central Plant | University of California Irvine | Irvine, CA | California Independent System Operator (CISO) | 113.8 GWh | Jun 2007 | Jun 2026 | Natural Gas |
| Ivanpah 3 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 192.5 GWh | Nov 2013 | Jun 2026 | Solar : 97.0% Natural Gas : 3.0% |
Summary of Power Plants By State
Figures are based on June 2026 generation numbers.| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 77 | 12,594.28 GWh |
| Alaska | # 48 | 140 | 563.53 GWh |
| Arizona | # 11 | 199 | 11,138.97 GWh |
| Arkansas | # 21 | 117 | 6,425.86 GWh |
| California | # 4 | 1,744 | 17,197.11 GWh |
| Colorado | # 29 | 309 | 4,933.21 GWh |
| Connecticut | # 34 | 173 | 3,737.86 GWh |
| Delaware | # 49 | 35 | 376.53 GWh |
| District of Columbia | # 51 | 17 | 18.29 GWh |
| Florida | # 2 | 342 | 26,309.59 GWh |
| Georgia | # 7 | 250 | 13,880.75 GWh |
| Hawaii | # 47 | 70 | 767.91 GWh |
| Idaho | # 41 | 152 | 2,099.32 GWh |
| Illinois | # 5 | 494 | 16,673.62 GWh |
| Indiana | # 18 | 222 | 8,401.10 GWh |
| Iowa | # 23 | 297 | 6,139.01 GWh |
| Kansas | # 25 | 188 | 5,758.25 GWh |
| Kentucky | # 22 | 61 | 6,181.49 GWh |
| Louisiana | # 15 | 90 | 9,779.36 GWh |
| Maine | # 45 | 242 | 1,215.46 GWh |
| Maryland | # 36 | 228 | 3,591.08 GWh |
| Massachusetts | # 44 | 666 | 1,410.23 GWh |
| Michigan | # 14 | 276 | 9,804.74 GWh |
| Minnesota | # 30 | 790 | 4,889.70 GWh |
| Mississippi | # 20 | 60 | 6,899.16 GWh |
| Missouri | # 24 | 129 | 6,066.44 GWh |
| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,225.73 GWh |
| Nebraska | # 39 | 126 | 3,184.64 GWh |
| Nevada | # 31 | 117 | 4,654.59 GWh |
| New Hampshire | # 43 | 57 | 1,659.52 GWh |
| New Jersey | # 28 | 398 | 5,055.63 GWh |
| New Mexico | # 33 | 159 | 4,408.01 GWh |
| New York | # 10 | 1,064 | 11,564.60 GWh |
| North Carolina | # 8 | 913 | 12,773.20 GWh |
| North Dakota | # 35 | 59 | 3,713.80 GWh |
| Ohio | # 6 | 213 | 13,969.06 GWh |
| Oklahoma | # 17 | 144 | 9,156.03 GWh |
| Oregon | # 27 | 281 | 5,322.08 GWh |
| Pennsylvania | # 3 | 259 | 21,018.65 GWh |
| Rhode Island | # 46 | 107 | 854.92 GWh |
| South Carolina | # 16 | 209 | 9,442.42 GWh |
| South Dakota | # 42 | 53 | 1,803.66 GWh |
| Tennessee | # 19 | 99 | 7,036.17 GWh |
| Texas | # 1 | 1,028 | 57,844.67 GWh |
| Utah | # 38 | 129 | 3,196.09 GWh |
| Vermont | # 50 | 118 | 180.62 GWh |
| Virginia | # 12 | 250 | 10,352.13 GWh |
| Washington | # 13 | 135 | 10,051.77 GWh |
| West Virginia | # 32 | 41 | 4,489.44 GWh |
| Wisconsin | # 26 | 266 | 5,542.48 GWh |
| Wyoming | # 37 | 69 | 3,318.53 GWh |