Plant Summary Information

Poe is ranked #38 out of 187 hydroelectric power plants in California in terms of total annual net electricity generation.

Poe is comprised of 2 generators and generated 162.0 MWh during the 3-month period between December 2024 to March 2025.

Plant NamePoe
Utility NamePacific Gas & Electric Co.
LocationButte County, CA
Initial Operation DateOctober 1958
Last Update Mar 2025
Annual Generation 315.4 GWh
Annual Consumption 1.4 M MMBtu
Ranked #1,825 out of 11,623 Power Plants Nationwide
Ranked #146 out of 1,242 Water Power Plants Nationwide
Ranked #162 out of 1,487 California Power Plants
Ranked #38 out of 187 California Water Power Plants
Fuel Types Water
Previous Operator Pacific Gas & Electric Co (2013 to 2016)
Pacific Gas & Electric Co. (2017 to 2023)

Map of Poe

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Poe.

Create Your Account Today

Monthly Net Generation for Poe

Poe Details

Summary Information
Plant NamePoe (272)
Plant AddressPoe Road off Highway 70, Storrie, CA 95980
UtilityPacific Gas & Electric Co. (14328)
Latitude, Longitude39.72289, -121.46981
Generation Dates on FileJan 2001 to Mar 2025
Initial Operation DateOctober 1958
Annual Generation 315.4 GWh
Fuel Types Water
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceNorth Fork Feather River
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 230.00 kV
Energy StorageNo

Generator 1 Details Operating October 1958

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
RTO ISO LMP Node DesignationPOE1_7_B1
RTO ISO Location Designation For Reporting Wholesale Sales DataPOE1_7_B1
Nameplate Capacity71.4 MW
Nameplate Power Factor0.9
Summer Capacity60 MW
Winter Capacity60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 1958
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator 2 Details Operating October 1958

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
RTO ISO LMP Node DesignationPOE2_7_B1
RTO ISO Location Designation For Reporting Wholesale Sales DataPOE2_7_B1
Nameplate Capacity71.4 MW
Nameplate Power Factor0.9
Summer Capacity60 MW
Winter Capacity60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 1958
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Poe Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Water.

RankPlant NamePlant LocationAnnual Generation
#136Dam 2Dumas, AR342.3 GWh
#137ThermalitoOroville, CA340.4 GWh
#138John H KerrBoydton, VA340.0 GWh
#139StanislausVallecito, CA334.5 GWh
#140Lucky Peak Power Plant ProjectBoise, ID331.8 GWh
#141S C MooreLittleton, NH327.6 GWh
#142Martin DamDadeville, AL326.6 GWh
#143Big Creek 2AAuberry, CA325.9 GWh
#144WaltersWaterville, NC321.0 GWh
#145Pit 7Montgomery Creek, CA318.7 GWh
#147Millers FerryCamden, AL315.3 GWh
#148Robert S KerrKeota, OK309.2 GWh
#149Center HillLancaster, TN308.1 GWh
#150Spring CreekRedding, CA306.5 GWh
#151ChelanWenatchee, WA305.8 GWh
#152Bellows FallsBellow Falls, VT304.5 GWh
#153SnettishamJuneau, AK302.1 GWh
#154Cherokee DamRudledge, TN301.3 GWh
#155H M JacksonSultan, WA298.0 GWh
#156Big Creek 2Auberry, CA296.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Poe.

Plant NamePlant LocationAnnual GenerationDistance
Ameresco Butte CountyParadise, CA16.0 GWh14.2 mi
BeldenBelden, CA365.1 GWh22.9 mi
Butte College Main Campus SolarOroville, CA6.7 GWh10.6 mi
CrestaStorrie, CA121.7 GWh7.8 mi
De SablaMagalia, CA47.2 GWh13.3 mi
Edward C HyattOroville, CA2.3 TWh12.5 mi
Enloe Medical - ChicoChico, CA13.5 GWh20.2 mi
ForbestownForbestown, CA155.0 GWh15.6 mi
Forks of Butte Hydro ProjectMagalia, CA41.9 GWh13.3 mi
Gridley Main TwoGridley, CA4.0 GWh26.7 mi
GrizzlyN/A, CA1.9 GWh15.3 mi
Kelly RidgeOroville, CA65.0 GWh13.3 mi
Oroville Cogeneration LPOroville, CA235.0 MWh16.7 mi
Rock CreekStorrie, CA609.1 GWh14.2 mi
Sierra Nevada Brewing Co HybridChico, CA9.3 GWh18.4 mi
Sly CreekForbestown, CA41.1 GWh21.1 mi
ThermalitoOroville, CA340.4 GWh16.7 mi
Thermalito Diverson DamOroville, CA16.5 GWh14 mi
ToadtownMagalia, CA2.5 GWh13.5 mi
WoodleafForbestown, CA231.6 GWh18.3 mi