hwy 59 on Merced/Snelling road, Snelling, CA 95344Plant Summary Information
Parker is ranked #180 out of 209 hydroelectric power plants in California in terms of total annual net electricity generation.
Parker is comprised of 1 generator and generated 2.0 GWh during the 3-month period between July 2024 to October 2024.
| Plant Name | Parker |
|---|---|
| Utility Name | Merced Irrigation District |
| Location | Merced County, CA |
| Initial Operation Date | April 1982 |
| Last Update | Oct 2024 |
| Annual Generation | 5.5 GWh |
| Annual Consumption | 19.0 k MMBtu |
| Ranked #7,856 out of 12,539 Power Plants Nationwide | |
| Ranked #1,110 out of 1,332 Water Power Plants Nationwide | |
| Ranked #1,066 out of 1,600 California Power Plants | |
| Ranked #180 out of 209 California Water Power Plants | |
| Fuel Types | Water |
Map of Parker
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Parker.
Monthly Net Generation for Parker
Parker Details
| Summary Information | |
|---|---|
| Plant Name | Parker (428) |
| Plant Address | hwy 59 on Merced/Snelling road, Snelling, CA 95344 |
| Utility | Merced Irrigation District (12312) |
| Latitude, Longitude | 37.47784, -120.44449 |
| Generation Dates on File | Mar 2001 to Oct 2024 |
| Initial Operation Date | April 1982 |
| Annual Generation | 5.5 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Main Canal |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator 1 Details Operating April 1982
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.7 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 2.7 MW |
| Winter Capacity | 2.7 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 1982 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Parker Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1100 | Rhinelander Mill | Rhinelander, WI | 5.7 GWh |
| #1101 | Rockton | Rockton, IL | 5.7 GWh |
| #1102 | Hydro Plant | Three Rivers, MI | 5.6 GWh |
| #1103 | Arpin Dam | Radisson, WI | 5.6 GWh |
| #1104 | Spillway | Pineville, SC | 5.6 GWh |
| #1105 | Fulton Hydro | Fulton, NY | 5.6 GWh |
| #1106 | Stiles | Oconto Falls, WI | 5.6 GWh |
| #1107 | Milton Hydro | Milton, NH | 5.6 GWh |
| #1108 | Snake Creek | Midway, UT | 5.6 GWh |
| #1109 | Chemical | Holyoke, MA | 5.5 GWh |
| #1111 | Diamond Valley Lake | Winchester, CA | 5.4 GWh |
| #1112 | Perris | Perris, CA | 5.4 GWh |
| #1113 | International Paper Woronoco Mill | Woronoco, MA | 5.4 GWh |
| #1114 | Lilliwaup Falls Generating | Lilliwaup, WA | 5.4 GWh |
| #1115 | Gold Creek | Juneau, AK | 5.4 GWh |
| #1116 | Lower No 2 | Idaho Falls, ID | 5.4 GWh |
| #1117 | Mile 28 Water Power Project | Eden, ID | 5.3 GWh |
| #1118 | Hooksett | Hooksett, NH | 5.3 GWh |
| #1119 | Granby Hydro | Granby, CO | 5.3 GWh |
| #1120 | Michell Butte Power Project | Nyssa, OR | 5.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Parker.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 2097 Helton Solar Project | Merced, CA | 1.6 GWh | 9.3 mi |
| Adera Solar | Chowchilla, CA | 17.3 GWh | 25.5 mi |
| Broadway 3 - UC Merced 1 | Merced, CA | 901.0 MWh | 7.9 mi |
| Don Pedro | La Grange, CA | 277.5 GWh | 15.1 mi |
| Exchequer | Snelling, CA | 267.9 GWh | 12.1 mi |
| Five H Farms Solar Array | Merced, CA | 1.3 GWh | 26.1 mi |
| Hickman | Hickman, CA | 3.6 GWh | 19.3 mi |
| La Grange | La Grange, CA | 4.4 GWh | 13.3 mi |
| McSwain | Snelling, CA | 31.8 GWh | 8 mi |
| Merced Falls | Snelling, CA | 9.4 GWh | 7 mi |
| Merced Solar LLC | Merced, CA | 3.8 GWh | 14.7 mi |
| Mission Solar LLC | Merced, CA | 3.8 GWh | 14.7 mi |
| Moccasin | Moccasin, CA | 279.7 GWh | 24.2 mi |
| Moccasin Low Head Hydro Project | Moccasin, CA | 4.0 MWh | 24.5 mi |
| Turlock Lake | Hickman, CA | 7.0 GWh | 12.4 mi |
| UC Merced Solar Hybrid | Merced, CA | 6.5 GWh | 7.8 mi |
| Upper Dawson | La Grange, CA | 10.7 GWh | 12 mi |
| Walnut | Turlock, CA | 429.0 MWh | 25.2 mi |
| Walnut Energy Center | Turlock, CA | 1.6 TWh | 24.7 mi |
| West Tambo Clean Power II | Livingston, CA | 877.0 MWh | 17.1 mi |