Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Park Meridian #1 | Altus Power America Management, LLC | Riverside, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2015 | Dec 2024 | Solar |
| Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 66.1 GWh | Oct 2017 | Mar 2026 | Solar |
| Colton Solar Two, LLC | Colton Solar Two, LLC | Colton, CA | California Independent System Operator (CISO) | 1.1 GWh | Mar 2015 | Dec 2024 | Solar |
| Coronus Adelanto West 1 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.3 GWh | Dec 2014 | Dec 2024 | Solar |
| Coronus Adelanto West 2 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.3 GWh | Dec 2014 | Dec 2024 | Solar |
| Colton Solar One, LLC | Colton Solar One, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 3.0 GWh | May 2015 | Dec 2024 | Solar |
| Western Antelope Blue Sky Ranch A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 44.8 GWh | Oct 2014 | Dec 2024 | Solar |
| Apple Campus 2 PV | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 17.4 GWh | May 2017 | Dec 2024 | Solar |
| Rudy Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 3.7 GWh | Nov 2014 | Dec 2024 | Solar |
| Madelyn Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2014 | Dec 2024 | Solar |
| Adelanto Solar, LLC | Adelanto Solar, LLC | Adelanto, CA | California Independent System Operator (CISO) | 53.2 GWh | Aug 2015 | Dec 2024 | Solar |
| W Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 23.2 GWh | Jun 2005 | Mar 2026 | Natural Gas |
| Westlands Solar PV Farm | Boralex US Operations LLC | Huron, CA | California Independent System Operator (CISO) | 33.9 GWh | Jan 2014 | Dec 2024 | Solar |
| Bowerman Power LFG, LLC | Bowerman Power LFG, LLC | Irvine, CA | California Independent System Operator (CISO) | 153.5 GWh | Mar 2016 | Dec 2024 | Landfill Gas |
| Shafter Solar LLC | Shafter Solar LLC | Bakersfield, CA | California Independent System Operator (CISO) | 46.3 GWh | Apr 2015 | Dec 2024 | Solar |
| One Market Plaza | Paramount Group Inc | San Francisco, CA | California Independent System Operator (CISO) | 177.0 MWh | Nov 2003 | Dec 2024 | Natural Gas |
| Diamond Valley Solar Project | Ecos Energy LLC | Winchester, CA | California Independent System Operator (CISO) | 2.2 GWh | Dec 2014 | Dec 2024 | Solar |
| Industry Solar Power Generation Station | AES Distributed Energy | Adelanto, CA | California Independent System Operator (CISO) | 4.0 GWh | Nov 2013 | Dec 2024 | Solar |
| Navajo Solar Power Generation Station 1 | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 4.2 GWh | Nov 2013 | Dec 2024 | Solar |
| Golden Acorn Casino | Foundation HA Energy Generation, LLC | Campo, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2014 | Mar 2026 | Wind |
| Alamo Solar | Onward Energy | Oro Grande, CA | California Independent System Operator (CISO) | 47.7 GWh | Apr 2015 | Dec 2024 | Solar |
| Otoe Solar Power Generation Station 1 LL | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2013 | Dec 2024 | Solar |
| City of Soledad Water Reclamation | Foundation HA Energy Generation, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.0 GWh | Oct 2014 | Dec 2024 | Wind |
| Powhatan Solar Power Generation Station | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2013 | Dec 2024 | Solar |
| Anheuser-Busch #2 | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Oct 2014 | Mar 2026 | Wind |
| Taylor Farms | Foundation HA Energy Generation, LLC | Gonzales, CA | California Independent System Operator (CISO) | 3.9 GWh | Oct 2014 | Dec 2024 | Wind |
| SCE-Snowline-White Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.8 GWh | Oct 2014 | Nov 2024 | Solar |
| Baker Creek Hydroelectric | Baker Station Associates, LP | Bridgeville, CA | California Independent System Operator (CISO) | 3.6 GWh | Oct 2014 | Dec 2024 | Water |
| Wildwood Solar I, LLC | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 41.9 GWh | Jan 2015 | Dec 2024 | Solar |
| Rodeo Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 2.9 GWh | Apr 2014 | Dec 2024 | Solar |
| Silver State Solar Power South | Silver State Solar Power South, LLC | Primm Valley, NV | California Independent System Operator (CISO) | 672.1 GWh | Oct 2015 | Mar 2026 | Solar |
| Stateline Solar | Southern Power Co | Nipton, CA | California Independent System Operator (CISO) | 619.9 GWh | Nov 2015 | Dec 2024 | Solar |
| SCE-Snowline-White Rd (Central) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2024 | Solar |
| Tulare 1 and 2 | Arevon Energy, Inc. | Tulare, CA | California Independent System Operator (CISO) | 5.3 GWh | Dec 2013 | Dec 2024 | Solar |
| Sierra Solar Greenworks | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 39.5 GWh | Oct 2015 | Dec 2024 | Solar |
| Lancaster Baptist Church | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2011 | Dec 2024 | Solar |
| Monterey Regional Water Pollution Contro | Tesla Inc. | Marina, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2010 | Dec 2024 | Solar |
| City of Tulare Water Facility | City of Tulare Water Pollution Control | Tulare, CA | California Independent System Operator (CISO) | 20.7 GWh | Dec 1990 | Dec 2024 | Natural Gas : 62.5% Other Biomass Gas : 21.5% Solar : 16.0% |
| Adelanto Solar II, LLC | Adelanto Solar II, LLC | Adelanto, CA | California Independent System Operator (CISO) | 14.4 GWh | Jun 2015 | Dec 2024 | Solar |
| Catalina Solar 2, LLC | Onward Energy | Rosamond, CA | California Independent System Operator (CISO) | 52.8 GWh | Jul 2015 | Dec 2024 | Solar |
| SCE-Snowline-White Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.7 GWh | Oct 2014 | Dec 2024 | Solar |
| SCE-Snowline-Duncan Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 1.6 GWh | Sep 2014 | Dec 2024 | Solar |
| SCE-Snowline-Duncan Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2014 | Dec 2024 | Solar |
| Anaheim Solar Energy Plant | Anaheim Public Utilities | Anaheim, CA | California Independent System Operator (CISO) | 2.7 GWh | Jul 2014 | Dec 2024 | Solar |
| Quinto Solar PV Project | Arevon Energy, Inc. | Gustine, CA | California Independent System Operator (CISO) | 257.0 GWh | Oct 2015 | Dec 2024 | Solar |
| Atwell Island West Solar | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 45.4 GWh | Apr 2015 | Dec 2024 | Solar |
| Corcoran Solar 2 | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 45.6 GWh | Apr 2015 | Dec 2024 | Solar |
| Algonquin SKIC20 Solar LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 41.1 GWh | Apr 2015 | Dec 2024 | Solar |
| TA-Acacia, LLC | Onward Energy | Lancaster, CA | California Independent System Operator (CISO) | 52.0 GWh | Oct 2014 | Dec 2024 | Solar |
| Western Antelope Dry Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 21.8 GWh | Nov 2016 | Dec 2024 | Solar |
| Mitchell Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 3.7 GWh | Nov 2014 | Dec 2024 | Solar |
| CSD 2 - Heritage High | CleanCapital Holdings | Brentwood, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2013 | Dec 2024 | Solar |
| Hayworth Solar | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 46.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Redcrest Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 25.1 GWh | Sep 2015 | Dec 2024 | Solar |
| Shasta Solar Farm | Ignite Solar Holdings LLC | Fall River Mills, CA | California Independent System Operator (CISO) | 6.0 GWh | Feb 2014 | Dec 2024 | Solar |
| SC 1 Data Center, Phase 2 | Xeres Ventures LLC | Santa Clara, CA | California Independent System Operator (CISO) | 402.0 MWh | Aug 2011 | Mar 2026 | Distillate Fuel Oil |
| Cottonwood Solar, LLC (Goose Lake) | Onward Energy | Lost Hills, CA | California Independent System Operator (CISO) | 31.5 GWh | Apr 2015 | Dec 2024 | Solar |
| Cottonwood Solar, LLC (City of Corcoran) | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 22.9 GWh | Apr 2015 | Dec 2024 | Solar |
| Division 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 2.7 GWh | May 2014 | Dec 2024 | Solar |
| Division 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 541.0 MWh | May 2014 | Dec 2024 | Solar |
| Division 3 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 458.0 MWh | May 2014 | Dec 2024 | Solar |
| Kettering Solar 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2024 | Solar |
| Kettering Solar 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2014 | Dec 2024 | Solar |
| CSD 2- Freedom High | CleanCapital Holdings | Oakley, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2013 | Dec 2024 | Solar |
| Woodmere Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 24.4 GWh | Nov 2015 | Dec 2024 | Solar |
| EAFB - North Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.6 GWh | Jan 2012 | Dec 2024 | Solar |
| EAFB - South Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2012 | Dec 2024 | Solar |
| SDCCD - Miramar | CleanCapital Holdings | San Diego, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2011 | Dec 2024 | Solar |
| SDCWA - Twin Oaks | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 1.3 GWh | Apr 2011 | Dec 2024 | Solar |
| RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 220.6 GWh | Jul 2016 | Dec 2024 | Solar |
| Lancaster Solar 2 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2024 | Solar |
| Expressway Solar C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2014 | Dec 2024 | Solar |
| Expressway Solar B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.0 GWh | Apr 2014 | Dec 2024 | Solar |
| Expressway Solar A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.5 GWh | Apr 2014 | Dec 2024 | Solar |
| Summer North Solar | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2014 | Dec 2024 | Solar |
| Summer Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 1.8 GWh | Jun 2014 | Dec 2024 | Solar |
| Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 2.2 GWh | May 2014 | Dec 2024 | Solar |
| Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2024 | Solar |
| Valley Center 2 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 11.4 GWh | Nov 2013 | Dec 2024 | Solar |
| Beringer | Perpetual Energy Systems | Saint Helena, CA | California Independent System Operator (CISO) | 1.4 GWh | Dec 2008 | Dec 2024 | Solar |
| Ramona 1 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2013 | Dec 2024 | Solar |
| Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2013 | Dec 2024 | Solar |
| Santa Fe Springs Rooftop Solar BLDG M | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2015 | Dec 2024 | Solar |
| Santa Fe Springs Rooftop Solar BLDG H | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.3 GWh | Feb 2015 | Dec 2024 | Solar |
| MCAGCC Cogen Plant | DOD USMC Marine Air Ground Combat | Twentynine Palms, CA | California Independent System Operator (CISO) | 69.2 GWh | Jan 2003 | Dec 2024 | Natural Gas |
| ASTI | Perpetual Energy Systems | Cloverdale, CA | California Independent System Operator (CISO) | 1.2 GWh | Jan 2009 | Dec 2024 | Solar |
| 2081 Terzian Solar Project | Solarenewal LLC | Reedley, CA | California Independent System Operator (CISO) | 1.8 GWh | Jan 2014 | Dec 2024 | Solar |
| 2127 Harris Solar Project | Solarenewal LLC | Live Oak, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2014 | Dec 2024 | Solar |
| 2097 Helton Solar Project | Solarenewal LLC | Merced, CA | California Independent System Operator (CISO) | 1.6 GWh | Mar 2014 | Dec 2024 | Solar |
| Lancaster Solar 1 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2014 | Dec 2024 | Solar |
| Laguna Water Reclamation Facility | City of Santa Rosa | Santa Rosa, CA | California Independent System Operator (CISO) | 11.2 GWh | Feb 2013 | Dec 2024 | Other Biomass Gas : 85.8% Natural Gas : 14.2% |
| Las Virgenes Municipal Water District | Tesla Inc. | Calabasas, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2014 | Dec 2024 | Solar |
| White River Solar 2 | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 48.4 GWh | Aug 2014 | Dec 2024 | Solar |
| Henrietta Solar Project | Southern Power Co | Lemoore, CA | California Independent System Operator (CISO) | 218.0 GWh | Jul 2016 | Dec 2024 | Solar |
| RE Camelot LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 125.1 GWh | Nov 2014 | Dec 2024 | Solar |
| RE Adams East, LLC | Onward Energy | Fresno, CA | California Independent System Operator (CISO) | 39.3 GWh | Nov 2014 | Dec 2024 | Solar |
| RE Kansas Solar, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 35.7 GWh | Nov 2014 | Dec 2024 | Solar |
| RE Old River One, LLC | Onward Energy | Bakersfield, CA | California Independent System Operator (CISO) | 35.6 GWh | Nov 2014 | Dec 2024 | Solar |
| RE Columbia Two, LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 40.4 GWh | Nov 2014 | Dec 2024 | Solar |
| RE Kent South, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 44.3 GWh | Nov 2014 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on March 2026 generation numbers.| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 76 | 10,194.39 GWh |
| Alaska | # 48 | 139 | 566.31 GWh |
| Arizona | # 15 | 183 | 8,256.99 GWh |
| Arkansas | # 25 | 114 | 4,973.03 GWh |
| California | # 5 | 1,656 | 15,197.83 GWh |
| Colorado | # 30 | 294 | 4,491.41 GWh |
| Connecticut | # 31 | 161 | 3,992.67 GWh |
| Delaware | # 49 | 33 | 248.78 GWh |
| District of Columbia | # 51 | 16 | 18.32 GWh |
| Florida | # 3 | 334 | 19,802.71 GWh |
| Georgia | # 8 | 247 | 10,697.11 GWh |
| Hawaii | # 46 | 69 | 784.18 GWh |
| Idaho | # 42 | 144 | 1,957.44 GWh |
| Illinois | # 4 | 379 | 15,489.73 GWh |
| Indiana | # 12 | 216 | 9,257.49 GWh |
| Iowa | # 21 | 289 | 6,478.67 GWh |
| Kansas | # 23 | 183 | 5,489.55 GWh |
| Kentucky | # 29 | 59 | 4,637.74 GWh |
| Louisiana | # 17 | 86 | 8,003.69 GWh |
| Maine | # 45 | 212 | 1,313.24 GWh |
| Maryland | # 39 | 202 | 2,834.84 GWh |
| Massachusetts | # 44 | 639 | 1,383.17 GWh |
| Michigan | # 13 | 268 | 8,564.76 GWh |
| Minnesota | # 26 | 760 | 4,875.53 GWh |
| Mississippi | # 24 | 55 | 5,467.46 GWh |
| Missouri | # 22 | 125 | 5,500.53 GWh |
| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 69 | 2,464.49 GWh |
| Nebraska | # 37 | 121 | 3,330.39 GWh |
| Nevada | # 35 | 114 | 3,487.65 GWh |
| New Hampshire | # 43 | 54 | 1,520.13 GWh |
| New Jersey | # 28 | 379 | 4,705.05 GWh |
| New Mexico | # 33 | 142 | 3,587.89 GWh |
| New York | # 9 | 935 | 10,247.40 GWh |
| North Carolina | # 11 | 896 | 9,821.46 GWh |
| North Dakota | # 32 | 59 | 3,854.12 GWh |
| Ohio | # 6 | 200 | 12,175.28 GWh |
| Oklahoma | # 19 | 142 | 7,305.54 GWh |
| Oregon | # 20 | 266 | 6,583.30 GWh |
| Pennsylvania | # 2 | 249 | 20,000.86 GWh |
| Rhode Island | # 47 | 100 | 610.71 GWh |
| South Carolina | # 14 | 204 | 8,273.25 GWh |
| South Dakota | # 41 | 52 | 2,184.62 GWh |
| Tennessee | # 18 | 88 | 7,335.80 GWh |
| Texas | # 1 | 961 | 46,858.09 GWh |
| Utah | # 38 | 125 | 3,184.50 GWh |
| Vermont | # 50 | 117 | 217.82 GWh |
| Virginia | # 16 | 233 | 8,059.42 GWh |
| Washington | # 7 | 131 | 10,773.76 GWh |
| West Virginia | # 34 | 40 | 3,543.98 GWh |
| Wisconsin | # 27 | 239 | 4,794.79 GWh |
| Wyoming | # 36 | 70 | 3,358.51 GWh |