Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Alticor Inc - Solar Project | MN8 Energy LLC | Buena Park, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2017 | Dec 2024 | Solar |
| Castle Rock Vineyards | Castle Rock Cooling | Delano, CA | California Independent System Operator (CISO) | 1.7 GWh | Aug 2010 | Dec 2024 | Solar |
| Alta Wind X | Alta Wind X, LLC | Mojave, CA | California Independent System Operator (CISO) | 379.0 GWh | Dec 2013 | Dec 2024 | Wind |
| Alta Wind XI | Alta Wind XI, LLC | Mojave, CA | California Independent System Operator (CISO) | 269.5 GWh | Dec 2013 | Dec 2024 | Wind |
| Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 8.7 GWh | Apr 2013 | Dec 2024 | Landfill Gas |
| Improvement Dst No. 4 | Kern County Water Agency | Bakersfield, CA | California Independent System Operator (CISO) | 12.0 MWh | Dec 2008 | Dec 2024 | Solar |
| Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 31.7 GWh | May 2013 | Dec 2024 | Solar |
| Guernsey Solar Station | Pacific Gas & Electric Co. | Hanford, CA | California Independent System Operator (CISO) | 22.7 GWh | Jul 2013 | Dec 2024 | Solar |
| Santa Cruz Energy | Santa Cruz Energy LLC | Santa Cruz, CA | California Independent System Operator (CISO) | 4.6 GWh | Oct 2009 | Dec 2024 | Landfill Gas |
| Solar Star 2 | Solar Star California XX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 714.2 GWh | Feb 2014 | Sep 2025 | Solar |
| Industry MetroLink PV 1 | City of Industry | Industry, CA | California Independent System Operator (CISO) | 1.1 GWh | Mar 2012 | Dec 2024 | Solar |
| Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2008 | Dec 2024 | Solar |
| ISH Solar Hospital Downey | SunEdison LLC | Downey, CA | California Independent System Operator (CISO) | 1.4 GWh | Aug 2011 | Dec 2024 | Solar |
| ISH Solar Hospital SDMC | SunEdison LLC | San Diego, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2011 | Dec 2024 | Solar |
| Lone Valley Solar Park I LLC | Lone Valley Solar Park I LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 23.6 GWh | Nov 2014 | Dec 2024 | Solar |
| Victor Dry Farm Ranch A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.7 GWh | May 2015 | Dec 2024 | Solar |
| Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.5 GWh | May 2015 | Dec 2024 | Solar |
| Brookfield Tehachapi 1 | Coram California Development, L.P. | Mojave, CA | California Independent System Operator (CISO) | 276.9 GWh | Feb 2012 | Dec 2024 | Wind |
| Meridian Vineyards | CVI CleanCapital Solar 1 LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.0 GWh | Nov 2010 | Dec 2024 | Solar |
| Lodi Energy Center | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 673.4 GWh | Oct 2012 | Sep 2025 | Natural Gas |
| High Sierra Cogeneration Plant | Plumas Sierra Rural Electric Coop | Susanville, CA | California Independent System Operator (CISO) | 36.7 GWh | Jan 2010 | Dec 2024 | Natural Gas |
| Atwell Island | SPS Atwell Island LLC | Alpaugh, CA | California Independent System Operator (CISO) | 33.3 GWh | Feb 2013 | Dec 2024 | Solar |
| Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2013 | Dec 2024 | Solar |
| Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2013 | Dec 2024 | Solar |
| SF Southeast Cogen Plant | City & County of San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 3.9 GWh | May 2002 | Dec 2024 | Other Biomass Gas |
| White River Solar | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 44.3 GWh | Jun 2013 | Dec 2024 | Solar |
| Corcoran Solar | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 34.6 GWh | Jul 2013 | Dec 2024 | Solar |
| Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2013 | Dec 2024 | Solar |
| El Segundo Energy Center LLC | NRG Energy Services LLC | El Segundo, CA | California Independent System Operator (CISO) | 72.7 GWh | Jun 2013 | Sep 2025 | Natural Gas |
| Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.8 GWh | Jun 2013 | Dec 2024 | Landfill Gas |
| Desert Green Solar Farm LLC | Invenergy Services LLC | Boulevard, CA | California Independent System Operator (CISO) | 10.4 GWh | Oct 2014 | Dec 2024 | Solar |
| Vasco Winds | Vasco Winds, LLC | Livermore, CA | California Independent System Operator (CISO) | 223.0 GWh | Nov 2011 | Dec 2024 | Wind |
| Montezuma Wind II | NextEra Energy Montezuma Wind II, LLC | Birds Landing, CA | California Independent System Operator (CISO) | 195.7 GWh | Dec 2011 | Dec 2024 | Wind |
| Tule Wind LLC | Avangrid Power LLC | Boulevard, CA | California Independent System Operator (CISO) | 351.7 GWh | Nov 2017 | Sep 2025 | Wind |
| San Antonio West Solar Rooftop | SS San Antonio West LLC | Chino, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2012 | Dec 2024 | Solar |
| Solar Star 1 | Solar Star California XIX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 897.7 GWh | Feb 2014 | Sep 2025 | Solar |
| L-8 Solar Project | L-8 Solar Project LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.4 GWh | Apr 2012 | Dec 2024 | Solar |
| Signal Hill West Unit | Signal Hill Petroleum, Inc | Signal Hill, CA | California Independent System Operator (CISO) | 39.7 GWh | Jun 2004 | Sep 2025 | Other Gas |
| Campo Verde Solar | Southern Power Co | El Centro, CA | California Independent System Operator (CISO) | 294.7 GWh | Sep 2013 | Dec 2024 | Solar |
| Ma | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2013 | Dec 2024 | Solar |
| Horn | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2013 | Dec 2024 | Solar |
| Golden Springs Building D | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 651.0 MWh | Feb 2012 | Dec 2024 | Solar |
| Watts 3115 | CD US Solar MT 2 LLC | Adelanto, CA | California Independent System Operator (CISO) | 4.0 GWh | Jul 2013 | Dec 2024 | Solar |
| Golden Springs Building C-1 | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Jan 2012 | Dec 2024 | Solar |
| Catalina Solar LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 262.2 GWh | Nov 2012 | Dec 2024 | Solar |
| Foundation IE | Foundation HA Energy Generation, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 373.0 MWh | Nov 2011 | Dec 2024 | Wind |
| Foundation AB | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2011 | Dec 2024 | Wind |
| City of Palo Alto | City of Palo Alto | Palo Alta, CA | California Independent System Operator (CISO) | 20.6 MWh | Feb 2002 | Dec 2023 | Natural Gas |
| McCoy Solar Energy Project Hybrid | McCoy Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 646.7 GWh | Jul 2015 | Dec 2024 | Solar |
| Vinam | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2013 | Dec 2024 | Solar |
| Watkins Manufacturing Co. | Watkins Manufacturing Corporation | San Diego, CA | California Independent System Operator (CISO) | 7.4 GWh | Oct 2001 | Sep 2025 | Natural Gas |
| North Palm Springs 4A | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 7.9 GWh | Sep 2012 | Dec 2024 | Solar |
| Windstar 1 | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 263.0 GWh | Jan 2012 | Dec 2024 | Wind |
| Palo Verde College | Scale Sustainable I, LLC | Blythe, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2009 | Dec 2024 | Solar |
| Ameresco Butte County | Ameresco Butte County LLC | Paradise, CA | California Independent System Operator (CISO) | 16.8 GWh | Jan 2013 | Dec 2024 | Landfill Gas |
| Shiloh IV Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 278.3 GWh | Nov 2012 | Dec 2024 | Wind |
| Naval Air Weapons Station China Lake | MN8 Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 22.0 GWh | Aug 2012 | Dec 2024 | Solar |
| Pacific Wind LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 311.2 GWh | Jul 2012 | Dec 2024 | Wind |
| North Palm Springs 1A | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 5.2 GWh | Mar 2012 | Dec 2024 | Solar |
| Glass House Camarillo Cultivation | Glass House Camarillo Cultivation | Camarillo, CA | California Independent System Operator (CISO) | 77.9 GWh | Jul 2012 | Dec 2024 | Natural Gas |
| Butte College Main Campus Solar | Butte-Glenn Community College District | Oroville, CA | California Independent System Operator (CISO) | 6.3 GWh | Jun 2011 | Dec 2024 | Solar |
| Alta Wind VIII | Nextera Energy Resources | Mojave, CA | California Independent System Operator (CISO) | 222.0 GWh | Dec 2011 | Dec 2024 | Wind |
| Mesquite Solar 1 | Consolidated Edison Development Inc. | Tonopah, AZ | California Independent System Operator (CISO) | 401.4 GWh | Oct 2011 | Dec 2024 | Solar |
| Pinyon Pine I | Pinyon Pines Wind I, LLC | Mojave, CA | California Independent System Operator (CISO) | 306.6 GWh | Oct 2012 | Dec 2024 | Wind |
| Mustang Hills LLC | Mustang Hills, LLC (Longroad) | Mojave, CA | California Independent System Operator (CISO) | 301.5 GWh | Apr 2012 | Dec 2024 | Wind |
| Heliocentric | Heliocentric LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2012 | Dec 2024 | Solar |
| Sunshine Gas Producers | Sunshine Gas Producers LLC | Sylmar, CA | California Independent System Operator (CISO) | 121.2 GWh | Jul 2014 | Sep 2025 | Landfill Gas |
| Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 352.7 GWh | Jun 2013 | Dec 2024 | Solar |
| Dinuba Wastewater Treatment Plant | AES Distributed Energy | Dinuba, CA | California Independent System Operator (CISO) | 1.4 GWh | Oct 2011 | Dec 2024 | Solar |
| Pinyon Pine II | Pinyon Pines Wind II, LLC | Mojave, CA | California Independent System Operator (CISO) | 233.1 GWh | Oct 2012 | Dec 2024 | Wind |
| Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 32.3 GWh | Feb 2013 | Dec 2024 | Landfill Gas |
| Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 30.7 GWh | Mar 2014 | Dec 2024 | Landfill Gas |
| Ameresco Forward | Ameresco Forward, LLC | Manteca, CA | California Independent System Operator (CISO) | 31.8 GWh | Jan 2014 | Dec 2024 | Landfill Gas |
| Franklin Templeton San Mateo | Bloom Energy | San Mateo, CA | California Independent System Operator (CISO) | 9.3 GWh | Oct 2011 | Dec 2024 | Natural Gas |
| Arrache 4006 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.3 GWh | Jul 2013 | Dec 2024 | Solar |
| Arrache 4013 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.3 GWh | Jul 2013 | Dec 2024 | Solar |
| Arrache 8083 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2013 | Dec 2024 | Solar |
| Nunn | CD US Solar MT 2 LLC | Apple Valley, CA | California Independent System Operator (CISO) | 1.6 GWh | Jun 2013 | Dec 2024 | Solar |
| Rutan | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.7 GWh | Dec 2013 | Dec 2024 | Solar |
| RE Victor Phelan Solar One LLC | MN8 Energy LLC | Adelanto, CA | California Independent System Operator (CISO) | 44.7 GWh | Nov 2013 | Dec 2024 | Solar |
| Honda Torrance | Bloom Energy | Torrance, CA | California Independent System Operator (CISO) | 762.0 MWh | Nov 2012 | Dec 2023 | Natural Gas |
| Juniper Networks Sunnyvale | Bloom Energy | Sunnyvale, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2012 | Dec 2024 | Natural Gas |
| Life Technologies Carlsbad | Bloom Energy | Carlsbad, CA | California Independent System Operator (CISO) | 8.6 GWh | Jul 2012 | Dec 2024 | Natural Gas |
| Taylor Farms Salinas | Bloom Energy | Salinas, CA | California Independent System Operator (CISO) | 7.6 GWh | Aug 2012 | Dec 2023 | Natural Gas |
| Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 2013 | Dec 2024 | Solar |
| West Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 19.2 GWh | Apr 2013 | Dec 2024 | Solar |
| Exeter Solar | Altus Power America Management, LLC | Exeter, CA | California Independent System Operator (CISO) | 4.6 GWh | Jan 2014 | Dec 2024 | Solar |
| Ivanhoe Solar | Altus Power America Management, LLC | Visalia, CA | California Independent System Operator (CISO) | 5.6 GWh | Dec 2013 | Dec 2024 | Solar |
| Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2013 | Dec 2024 | Solar |
| Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 5.7 GWh | Dec 2013 | Dec 2024 | Solar |
| Xilinx San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.3 GWh | Jan 2012 | Dec 2024 | Natural Gas |
| Staples La Mirada, CA | SunE WF3-ST Holdings, LLC | La Mirada, CA | California Independent System Operator (CISO) | 871.0 MWh | Feb 2009 | Dec 2024 | Solar |
| Parnassus Central Utility Plant | University of California-San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 67.6 GWh | Dec 1995 | Sep 2025 | Natural Gas |
| CSUF Trigeneration | California State University at Fullerton | Fullerton, CA | California Independent System Operator (CISO) | 37.8 GWh | Sep 2010 | Sep 2025 | Natural Gas : 82.8% Solar : 17.2% |
| Energy Center | University of Redlands | Redlands, CA | California Independent System Operator (CISO) | 1.5 GWh | Jan 2007 | Dec 2024 | Natural Gas |
| Chuckawalla Solar | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 7.1 GWh | May 2012 | Dec 2024 | Solar |
| North Sky River Energy LLC | North Sky River Energy LLC | Weldon, CA | California Independent System Operator (CISO) | 435.0 GWh | Nov 2012 | Dec 2024 | Wind |
| TA-High Desert LLC | TA-High Desert LLC | Lancaster, CA | California Independent System Operator (CISO) | 56.8 GWh | Feb 2013 | Dec 2024 | Solar |
| RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 49.2 GWh | May 2013 | Dec 2024 | Solar |
| G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 12.2 GWh | May 2013 | Dec 2024 | Landfill Gas |
Summary of Power Plants By State
Figures are based on September 2025 generation numbers.| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 12,052.47 GWh |
| Alaska | # 48 | 147 | 527.57 GWh |
| Arizona | # 9 | 183 | 11,602.92 GWh |
| Arkansas | # 21 | 117 | 5,844.09 GWh |
| California | # 4 | 1,769 | 19,371.91 GWh |
| Colorado | # 30 | 304 | 4,433.17 GWh |
| Connecticut | # 32 | 168 | 3,779.74 GWh |
| Delaware | # 49 | 33 | 419.31 GWh |
| District of Columbia | # 51 | 16 | 16.99 GWh |
| Florida | # 2 | 323 | 24,446.09 GWh |
| Georgia | # 8 | 266 | 11,628.97 GWh |
| Hawaii | # 47 | 73 | 826.54 GWh |
| Idaho | # 44 | 148 | 1,495.33 GWh |
| Illinois | # 5 | 385 | 14,642.93 GWh |
| Indiana | # 14 | 213 | 8,730.35 GWh |
| Iowa | # 26 | 295 | 5,224.35 GWh |
| Kansas | # 25 | 189 | 5,250.86 GWh |
| Kentucky | # 23 | 60 | 5,806.86 GWh |
| Louisiana | # 13 | 87 | 9,343.34 GWh |
| Maine | # 45 | 217 | 1,135.36 GWh |
| Maryland | # 39 | 204 | 2,935.42 GWh |
| Massachusetts | # 41 | 652 | 1,746.92 GWh |
| Michigan | # 11 | 279 | 10,468.02 GWh |
| Minnesota | # 29 | 769 | 4,717.95 GWh |
| Mississippi | # 20 | 58 | 6,625.37 GWh |
| Missouri | # 22 | 128 | 5,843.17 GWh |
| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 1,949.24 GWh |
| Nebraska | # 34 | 132 | 3,501.38 GWh |
| Nevada | # 31 | 114 | 4,053.88 GWh |
| New Hampshire | # 42 | 60 | 1,549.07 GWh |
| New Jersey | # 27 | 399 | 4,969.45 GWh |
| New Mexico | # 36 | 145 | 3,317.84 GWh |
| New York | # 12 | 966 | 10,145.62 GWh |
| North Carolina | # 10 | 917 | 11,211.15 GWh |
| North Dakota | # 37 | 60 | 3,089.17 GWh |
| Ohio | # 6 | 201 | 12,818.31 GWh |
| Oklahoma | # 17 | 143 | 7,364.05 GWh |
| Oregon | # 28 | 282 | 4,812.51 GWh |
| Pennsylvania | # 3 | 260 | 19,731.43 GWh |
| Rhode Island | # 46 | 100 | 863.62 GWh |
| South Carolina | # 16 | 207 | 7,861.23 GWh |
| South Dakota | # 43 | 52 | 1,535.17 GWh |
| Tennessee | # 19 | 88 | 6,829.06 GWh |
| Texas | # 1 | 946 | 51,969.48 GWh |
| Utah | # 35 | 126 | 3,419.48 GWh |
| Vermont | # 50 | 120 | 165.14 GWh |
| Virginia | # 15 | 241 | 8,580.52 GWh |
| Washington | # 18 | 138 | 7,120.43 GWh |
| West Virginia | # 38 | 39 | 3,057.29 GWh |
| Wisconsin | # 24 | 251 | 5,674.74 GWh |
| Wyoming | # 33 | 73 | 3,641.70 GWh |