Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| APP Prune A-D | Bloom Energy | Cupertino, CA | California Independent System Operator (CISO) | 27.1 GWh | Apr 2017 | Dec 2023 | Natural Gas |
| Aquamarine | Aquamarine Westside LLC | Lemoore, CA | California Independent System Operator (CISO) | 683.9 GWh | Aug 2021 | Oct 2025 | Solar |
| Kaiser East La Palma Ave. Fuel Cell | 2016 ESA Project Company, LLC | Anaheim, CA | California Independent System Operator (CISO) | 18.1 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 39.2 GWh | Aug 2023 | Dec 2024 | Solar |
| ATT Kelvin | Bloom Energy | Irvine, CA | California Independent System Operator (CISO) | 8.0 GWh | Mar 2017 | Dec 2024 | Natural Gas |
| Preferred Freezer San Leandro | Powerflex | San Leandro, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2017 | Dec 2023 | Solar |
| PFMG Solar Grossmont Helix LLC | Altus Power America Management, LLC | La Mesa, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2018 | Dec 2024 | Solar |
| Alticor Inc - Solar Project | MN8 Energy LLC | Buena Park, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2017 | Dec 2024 | Solar |
| Grossmont HS Solar Project | MN8 Energy LLC | El Cajon, CA | California Independent System Operator (CISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Kaiser Napa Valley Corporate Dr Fuel Cel | 2016 ESA Project Company, LLC | Napa, CA | California Independent System Operator (CISO) | 37.6 GWh | May 2017 | Dec 2024 | Natural Gas |
| Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.9 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Equinix Douglas St. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 8.0 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Equinix Maple Ave. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 7.7 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Solar Star Palo Alto I, LLC | DG 1 Acquisition Co., LLC | Palo Alto, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2019 | Dec 2024 | Solar |
| Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2020 | Dec 2024 | Solar |
| Windsor Floating Solar | CA ODEVI LLC | Windsor, CA | California Independent System Operator (CISO) | 2.5 GWh | Oct 2020 | Dec 2024 | Solar |
| CID Solar (CA) | DG California Solar LLC | Corcoran, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2019 | Dec 2024 | Solar |
| Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 26.3 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Bio-Rad | Vista Solar, Inc. | Hercules, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2021 | Dec 2024 | Solar |
| SCCCD - Clovis Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
| CalCity Solar 1 | CalCity Solar 1, LLC | California City, CA | California Independent System Operator (CISO) | 7.9 GWh | Oct 2019 | Dec 2024 | Solar |
| SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.8 GWh | Sep 2018 | Dec 2024 | Solar |
| Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Eagle Creek | ZGlobal Inc | Taft, CA | California Independent System Operator (CISO) | 6.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Santa Barbara ReSource Center | County of Santa Barbara | Goleta, CA | California Independent System Operator (CISO) | 5.4 GWh | May 2022 | Dec 2024 | Other Biomass Gas |
| Kaiser Deer Valley Rd. Fuel Cell | 2016 ESA Project Company, LLC | Antioch, CA | California Independent System Operator (CISO) | 11.2 GWh | Mar 2017 | Dec 2024 | Natural Gas |
| SFDK Solar | AES Distributed Energy | Vallejo, CA | California Independent System Operator (CISO) | 10.2 GWh | Nov 2019 | Dec 2024 | Solar |
| Foundation Dole Fresh Vegetables | Foundation CA Fund X Manager LLC | Soledad, CA | California Independent System Operator (CISO) | 17.1 GWh | Jul 2022 | Dec 2024 | Wind |
| HL Solar | HL Solar LLC | Wendel, CA | California Independent System Operator (CISO) | 11.5 GWh | May 2019 | Dec 2024 | Solar |
| Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 38.3 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 31.7 GWh | May 2021 | Dec 2024 | Solar |
| Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.0 GWh | May 2021 | Dec 2024 | Solar |
| American Canyon Solar | RP Napa Solar 1, LLC | American Canyon, CA | California Independent System Operator (CISO) | 6.9 GWh | Aug 2019 | Dec 2024 | Solar |
| Malech Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 4.8 GWh | Sep 2017 | Dec 2024 | Solar |
| Hellyer Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2017 | Dec 2023 | Solar |
| Guadalupe Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2018 | Dec 2024 | Solar |
| Mission College Blvd. Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 39.9 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Drew Solar LLC | Drew Solar LLC | Calexico, CA | California Independent System Operator (CISO) | 309.4 GWh | Oct 2022 | Oct 2025 | Solar |
| Kaiser Owens Dr. Fuel Cell | 2016 ESA Project Company, LLC | Pleasanton, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| CED Ducor 2 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 52.2 GWh | Nov 2016 | Dec 2024 | Solar |
| Genentech Vacaville Meter #1 | Tesla Inc. | Vacaville, CA | California Independent System Operator (CISO) | 11.0 GWh | Apr 2017 | Dec 2024 | Solar |
| CED Ducor 4 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 51.6 GWh | Nov 2016 | Dec 2024 | Solar |
| Bayshore Solar B, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.4 GWh | Nov 2017 | Dec 2024 | Solar |
| Sun Streams, LLC | EDP Renewables North America LLC | Arlington, AZ | California Independent System Operator (CISO) | 403.4 GWh | Dec 2019 | Oct 2025 | Solar |
| Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 60.8 GWh | Oct 2017 | Oct 2025 | Solar |
| Frontier Solar LLC | Boralex US Operations LLC | Newman, CA | California Independent System Operator (CISO) | 38.6 GWh | May 2016 | Dec 2024 | Solar |
| CED Ducor 3 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 39.1 GWh | Nov 2016 | Dec 2024 | Solar |
| Redwood 4 Solar Farm | 54 KR 8me LLC | Edison, CA | California Independent System Operator (CISO) | 39.9 GWh | Nov 2017 | Dec 2024 | Solar |
| SunAnza | Arizona Electric Pwr Coop Inc | Anza, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2017 | Dec 2024 | Solar |
| PVN Milliken, LLC | PVN Milliken, LLC | Ontario, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2017 | Dec 2024 | Solar |
| Tequesquite Landfill Solar PV Project | Solar Star California XXXI, LLC | Riverside, CA | California Independent System Operator (CISO) | 12.7 GWh | Sep 2015 | Dec 2024 | Solar |
| CA Flats Solar 150, LLC | Arevon Energy, Inc. | Shandon, CA | California Independent System Operator (CISO) | 299.6 GWh | Jan 2019 | Oct 2025 | Solar |
| CA Flats Solar 130, LLC | California Flats Solar 130, LLC | Shandon, CA | California Independent System Operator (CISO) | 258.8 GWh | Oct 2017 | Oct 2025 | Solar |
| SunE Rochester | SunE Solar XVI Lessor, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 991.0 MWh | Jul 2016 | Jul 2024 | Solar |
| CED Ducor 1 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 51.9 GWh | Nov 2016 | Dec 2024 | Solar |
| CED Avenal | Consolidated Edison Development Inc. | Avenal, CA | California Independent System Operator (CISO) | 9.7 GWh | Dec 2016 | Dec 2024 | Solar |
| Lindberg FIeld Solar | Lindberg Field Solar I LLC | San Diego, CA | California Independent System Operator (CISO) | 3.0 GWh | Aug 2015 | Dec 2024 | Solar |
| Kingbird B Solar, LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 55.8 GWh | Mar 2016 | Dec 2024 | Solar |
| Blythe Solar II, LLC | Blythe Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 340.1 GWh | Jun 2016 | Oct 2025 | Solar |
| Blythe Solar 110, LLC | Blythe Solar 110, LLC | Blythe, CA | California Independent System Operator (CISO) | 580.5 GWh | Feb 2016 | Dec 2024 | Solar |
| Blythe Solar III, LLC Hybrid | Blythe Solar III, LLC | Blythe, CA | California Independent System Operator (CISO) | 356.4 GWh | Apr 2020 | Oct 2025 | Solar |
| Blythe Solar IV, LLC | Blythe Solar IV, LLC | Blythe, CA | California Independent System Operator (CISO) | 341.6 GWh | Oct 2020 | Oct 2025 | Solar |
| Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2019 | Dec 2024 | Solar |
| RCWD PV Project | MN8 Energy LLC | Murrieta, CA | California Independent System Operator (CISO) | 7.7 GWh | May 2016 | Dec 2024 | Solar |
| Bayshore Solar A, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 46.4 GWh | Nov 2017 | Dec 2024 | Solar |
| Corcoran | Terraform Arcadia | Corcoran, CA | California Independent System Operator (CISO) | 1.7 GWh | Dec 2013 | Dec 2024 | Solar |
| CA Dept of Public Health at Richmond | California PV Energy LLC | Richmond, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2016 | Dec 2024 | Solar |
| Longboat Solar, LLC | Duke Energy Renewables Services | Barstow, CA | California Independent System Operator (CISO) | 42.0 GWh | Nov 2016 | Dec 2024 | Solar |
| US-TOPCO (Soccer Center) | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2016 | Dec 2024 | Solar |
| AVS Lancaster 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 8.7 GWh | Nov 2016 | Dec 2024 | Solar |
| Fresno Solar | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 4.7 GWh | Sep 2015 | Dec 2024 | Solar |
| Munro Valley Solar | Ecos Energy LLC | Olancha, CA | California Independent System Operator (CISO) | 10.7 GWh | Sep 2016 | Dec 2024 | Solar |
| Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 41.3 GWh | Nov 2017 | Dec 2024 | Solar |
| Golden Hills Wind | Golden Hills Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 247.4 GWh | Nov 2015 | Dec 2024 | Wind |
| Solar Star California, XLI, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 150.0 GWh | Nov 2016 | Oct 2025 | Solar |
| E&B Resources | Terraform Arcadia | Bakersfield, CA | California Independent System Operator (CISO) | 2.2 GWh | Nov 2013 | Dec 2024 | Solar |
| Zero Waste Energy Development Co LLC | Zero Waste Energy Development Company LLC | San Jose, CA | California Independent System Operator (CISO) | 1.8 GWh | Jan 2015 | Dec 2024 | Other Biomass Gas |
| Lemoore 1 | AES Distributed Energy | Lemoore, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2016 | Dec 2024 | Solar |
| Intel Santa Clara | Bloom Energy | Santa Clara, CA | California Independent System Operator (CISO) | 7.7 GWh | Dec 2014 | Dec 2024 | Natural Gas |
| Genentech-Oceanside Hybrid | Tesla Inc. | Oceanside, CA | California Independent System Operator (CISO) | 3.6 GWh | Mar 2016 | Dec 2024 | Solar |
| RE Garland | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 483.5 GWh | Oct 2016 | Dec 2024 | Solar |
| Algonquin SKIC 10 Solar, LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 14.8 GWh | Dec 2016 | Dec 2024 | Solar |
| Silicon Valley Clean Water | Silicon Valley Clean Water | Redwood City, CA | California Independent System Operator (CISO) | 7.0 GWh | Feb 2015 | Dec 2024 | Other Biomass Gas : 71.4% Natural Gas : 28.6% |
| Weymouth Solar Plant | Metropolitan Water District of S CA | La Verne, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2016 | Dec 2024 | Solar |
| Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 1.7 GWh | Jun 2020 | Oct 2025 | Natural Gas |
| Golden Fields Solar I, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 139.1 GWh | Nov 2016 | Oct 2025 | Solar |
| Equinix San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 16.4 GWh | Oct 2015 | Dec 2024 | Natural Gas |
| Westside Solar Power PV1 | Westside Assets LLC | Lemoore, CA | California Independent System Operator (CISO) | 4.9 GWh | Apr 2016 | Dec 2024 | Solar |
| Castor Solar | ZGlobal Inc | Dustin Acres, CA | California Independent System Operator (CISO) | 917.0 MWh | Mar 2016 | Dec 2023 | Solar |
| Antelope Big Sky Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 54.0 GWh | Jul 2016 | Dec 2024 | Solar |
| Summer Solar LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 49.1 GWh | Jun 2016 | Dec 2024 | Solar |
| Central Antelope Dry Ranch B LLC | Central Antelope Dry Ranch B, LLC | Lancaster, CA | California Independent System Operator (CISO) | 6.7 GWh | Aug 2017 | Dec 2024 | Solar |
| Portal Ridge Solar C, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 25.3 GWh | Jan 2017 | Dec 2024 | Solar |
| Portal Ridge Solar B, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 46.9 GWh | Jan 2017 | Dec 2024 | Solar |
| Mesquite Solar 3, LLC | Consolidated Edison Development Inc. | Tonopah, AZ | California Independent System Operator (CISO) | 446.8 GWh | Nov 2016 | Oct 2025 | Solar |
| Mesquite Solar 2, LLC | Consolidated Edison Development Inc. | Tonopah, AZ | California Independent System Operator (CISO) | 287.9 GWh | Nov 2016 | Oct 2025 | Solar |
| Voyager Wind I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 406.4 GWh | Nov 2019 | Oct 2025 | Wind |
| Solar Blythe 2 | NRG Solar Blythe II LLC | Blythe, CA | California Independent System Operator (CISO) | 38.1 GWh | Mar 2017 | Dec 2024 | Solar |
| RE Garland A | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 58.2 GWh | Aug 2016 | Dec 2024 | Solar |
| Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 9.2 GWh | Nov 2016 | Dec 2024 | Natural Gas |
Summary of Power Plants By State
Figures are based on October 2025 generation numbers.| State | Rank | Active Plants | Oct 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 11,041.22 GWh |
| Alaska | # 49 | 144 | 484.88 GWh |
| Arizona | # 11 | 184 | 9,400.73 GWh |
| Arkansas | # 24 | 116 | 5,068.08 GWh |
| California | # 4 | 1,734 | 16,078.58 GWh |
| Colorado | # 30 | 302 | 4,272.03 GWh |
| Connecticut | # 38 | 166 | 3,176.41 GWh |
| Delaware | # 48 | 33 | 521.87 GWh |
| District of Columbia | # 51 | 16 | 15.93 GWh |
| Florida | # 2 | 321 | 22,593.36 GWh |
| Georgia | # 6 | 262 | 11,885.65 GWh |
| Hawaii | # 47 | 73 | 845.96 GWh |
| Idaho | # 44 | 147 | 1,448.54 GWh |
| Illinois | # 5 | 382 | 15,897.55 GWh |
| Indiana | # 12 | 211 | 9,138.69 GWh |
| Iowa | # 18 | 292 | 6,552.01 GWh |
| Kansas | # 31 | 187 | 4,138.18 GWh |
| Kentucky | # 23 | 60 | 5,089.89 GWh |
| Louisiana | # 14 | 86 | 8,618.27 GWh |
| Maine | # 45 | 215 | 1,114.12 GWh |
| Maryland | # 35 | 203 | 3,540.16 GWh |
| Massachusetts | # 41 | 648 | 1,963.73 GWh |
| Michigan | # 9 | 272 | 10,045.59 GWh |
| Minnesota | # 27 | 765 | 4,687.69 GWh |
| Mississippi | # 20 | 57 | 6,085.50 GWh |
| Missouri | # 21 | 127 | 5,515.65 GWh |
| State | Rank | Active Plants | Oct 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,455.83 GWh |
| Nebraska | # 36 | 129 | 3,412.31 GWh |
| Nevada | # 33 | 114 | 3,578.95 GWh |
| New Hampshire | # 43 | 60 | 1,661.03 GWh |
| New Jersey | # 25 | 393 | 4,903.52 GWh |
| New Mexico | # 37 | 143 | 3,370.59 GWh |
| New York | # 8 | 956 | 10,108.60 GWh |
| North Carolina | # 13 | 906 | 9,082.37 GWh |
| North Dakota | # 34 | 60 | 3,554.85 GWh |
| Ohio | # 10 | 197 | 9,920.42 GWh |
| Oklahoma | # 17 | 142 | 7,167.46 GWh |
| Oregon | # 26 | 275 | 4,755.34 GWh |
| Pennsylvania | # 3 | 256 | 16,669.60 GWh |
| Rhode Island | # 46 | 100 | 886.30 GWh |
| South Carolina | # 15 | 208 | 8,061.53 GWh |
| South Dakota | # 42 | 52 | 1,892.35 GWh |
| Tennessee | # 22 | 88 | 5,198.50 GWh |
| Texas | # 1 | 947 | 48,837.92 GWh |
| Utah | # 39 | 125 | 3,044.05 GWh |
| Vermont | # 50 | 117 | 151.45 GWh |
| Virginia | # 19 | 239 | 6,515.03 GWh |
| Washington | # 16 | 137 | 7,971.98 GWh |
| West Virginia | # 29 | 39 | 4,608.16 GWh |
| Wisconsin | # 28 | 250 | 4,687.23 GWh |
| Wyoming | # 32 | 70 | 3,770.47 GWh |