Arlington Valley Solar Energy II
South of Elliot Road and west, Arlington, AZ 85326Plant Summary Information
Arlington Valley Solar Energy II is ranked #46 out of 169 power plants in Arizona in terms of total annual net electricity generation.
Arlington Valley Solar Energy II generated 71.7 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Arlington Valley Solar Energy II |
|---|---|
| Utility Name | Arevon Energy, Inc. |
| Location | Maricopa County, AZ |
| Initial Operation Date | April 2013 |
| Last Update | Dec 2024 |
| Annual Generation | 341.2 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,822 out of 12,613 Power Plants Nationwide | |
| Ranked #226 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #46 out of 169 Arizona Power Plants | |
| Ranked #18 out of 116 Arizona Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Arlington Valley Solar Energy II LLC (2013 to 2019) CD Arevon USA, Inc. (2020 to 2021) Arevon Energy, Inc. (2022 to 2024) |
Map of Arlington Valley Solar Energy II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Arlington Valley Solar Energy II.
Monthly Net Generation for Arlington Valley Solar Energy II
Monthly Plant Fuel Consumption for Arlington Valley Solar Energy II
Arlington Valley Solar Energy II Details
| Summary Information | |
|---|---|
| Plant Name | Arlington Valley Solar Energy II (57680) |
| Plant Address | South of Elliot Road and west, Arlington, AZ 85326 |
| Utility | Arevon Energy, Inc. (61230) |
| Latitude, Longitude | 33.305, -112.83389 |
| Generation Dates on File | Apr 2013 to Dec 2024 |
| Initial Operation Date | April 2013 |
| Annual Generation | 341.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Arizona Public Service Company (AZPS) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Salt River Project (16572) AZ |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
Generator AVSE1 Details Operating April 2013
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 19 MW |
| Summer Capacity | 18.5 MW |
| Winter Capacity | 18.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 90 |
| DC Net Capacity | 26.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator AVSE2 Details Operating April 2013
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 28 MW |
| Summer Capacity | 27.3 MW |
| Winter Capacity | 27.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 90 |
| DC Net Capacity | 38.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator AVSE3 Details Operating May 2013
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 28 MW |
| Summer Capacity | 27.3 MW |
| Winter Capacity | 27.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 90 |
| DC Net Capacity | 38.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator AVSE4 Details Operating August 2013
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 26 MW |
| Summer Capacity | 25 MW |
| Winter Capacity | 25 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 90 |
| DC Net Capacity | 33.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator AVSE5 Details Operating August 2013
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 28 MW |
| Summer Capacity | 27.3 MW |
| Winter Capacity | 27.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 90 |
| DC Net Capacity | 38.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Arlington Valley Solar Energy II Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #216 | Maverick Solar 7, LLC | Desert Center, CA | 352.1 GWh |
| #217 | Blythe Solar II, LLC | Blythe, CA | 337.0 GWh |
| #218 | Edwards Sanborn E1A | Mojave, CA | 332.6 GWh |
| #219 | Ganado Solar | Gail, TX | 339.9 GWh |
| #220 | West Memphis Solar Station | Crawfordsville, AR | 347.3 GWh |
| #221 | Samson Solar Energy | Cunningham, TX | 346.7 GWh |
| #222 | Agave | Arlington, AZ | 346.4 GWh |
| #223 | Spanish Peaks Solar | Trinidad, CO | 344.2 GWh |
| #224 | SR Russellville | Olmstead, KY | 343.7 GWh |
| #225 | Serrano | Marana, AZ | 324.7 GWh |
| #227 | Arlington Energy Center III | Blythe, CA | 320.9 GWh |
| #228 | Vikings Energy Farm | Holtville, CA | 314.9 GWh |
| #229 | Midway Solar - TX | Fort Stockton, TX | 332.5 GWh |
| #230 | Cass County Renewable Energy Center | Beardstown, IL | 331.8 GWh |
| #231 | Twin Lakes Solar LLC | Monticello, IN | 328.9 GWh |
| #232 | Hardin Solar Energy II LLC | Belle Center, OH | 328.8 GWh |
| #233 | Sun Streams 2 | Hassayampa, AZ | 328.2 GWh |
| #234 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 301.1 GWh |
| #235 | Edwards Sanborn E4 | Mojave, CA | 321.3 GWh |
| #236 | Golden Triangle II | St.Artesia, MS | 319.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Arlington Valley Solar Energy II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agave | Arlington, AZ | 346.4 GWh | 1.3 mi |
| Arlington Valley Energy Facility | Arlington, AZ | 3.3 TWh | 4.1 mi |
| Badger 1 | Tonopah, AZ | 33.2 GWh | 13.4 mi |
| Buckeye Union HS District 201 | Buckeye, AZ | 6.8 GWh | 16.8 mi |
| Desert Star Hybrid | Buckeye, AZ | 29.2 GWh | 14.9 mi |
| Harquahala 2 | Tonopah, AZ | 647.6 GWh | 19.2 mi |
| Mesquite Generating Station Block 1 | Arlington, AZ | 3.5 TWh | 3.3 mi |
| Mesquite Generating Station Block 2 | Arlington, AZ | 4.0 TWh | 3.3 mi |
| Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh | 4.8 mi |
| Mesquite Solar 2, LLC | Tonopah, AZ | 285.5 GWh | 4.9 mi |
| Mesquite Solar 3, LLC | Tonopah, AZ | 443.4 GWh | 6.6 mi |
| Mesquite Solar 4, LLC | Tonopah, AZ | 144.4 GWh | 5.1 mi |
| Mesquite Solar 5, LLC | Tonopah, AZ | 134.4 GWh | 5.1 mi |
| Palo Verde | Wintersburg, AZ | 31.3 TWh | 6 mi |
| Red Hawk | Arlington, AZ | 4.8 TWh | 2.1 mi |
| Sonoran Solar Energy | Buckeye, AZ | 1.1 TWh | 17.3 mi |
| Sun Streams 2 | Hassayampa, AZ | 328.2 GWh | 1.5 mi |
| Sun Streams 3 | Arlington, AZ | 493.5 GWh | 2.2 mi |
| Sun Streams 4 | Tonopah, AZ | 647.2 GWh | 5 mi |
| Sun Streams, LLC | Arlington, AZ | 411.7 GWh | 3 mi |