Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Gopher CSG | SoCore Energy LLC | Taylor Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | Dec 2017 | Dec 2024 | Solar |
| Richmond CSG | SoCore Energy LLC | Richmond, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Taylors Falls CSG | SoCore Energy LLC | Taylor Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Dec 2017 | Dec 2024 | Solar |
| DG AMP Solar Coldwater | DG AMP Solar, LLC | Coldwater, MI | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jan 2018 | Dec 2024 | Solar |
| Frontenac Holdco LLC, CSG | Frontenac Holdco LLC | Frontenac, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Feb 2019 | Dec 2024 | Solar |
| Northfield Holdco CSG | Northfield Holdco LLC | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.2 GWh | Nov 2017 | Dec 2024 | Solar |
| Waterford Holdco CSG | Waterford Holdco LLC | Waterford, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Oct 2017 | Dec 2024 | Solar |
| Rengstorf Solar CSG | National Grid Renewables | Coutland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Oct 2017 | Dec 2024 | Solar |
| B.R. Sartell CSG | Minnesota Solar CSG 21, LLC | Sartell, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Oct 2017 | Dec 2024 | Solar |
| B.R. Sauk Rapids CSG | Minnesota Solar CSG 9, LLC | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Oct 2017 | Dec 2024 | Solar |
| Montgomery Winsted CSG | Minnesota Solar CSG 4, LLC | Winsted, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Oct 2017 | Dec 2024 | Solar |
| Cornillie | Terraform Arcadia | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jul 2018 | Dec 2024 | Solar |
| Pegasus Wind | Pegasus Wind, LLC | Reese, MI | Midcontinent Independent System Operator, Inc. (MISO) | 374.8 GWh | Nov 2019 | Mar 2026 | Wind |
| Lahr 1, LLC | SoCore Energy LLC | Wakefield Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.6 GWh | Dec 2017 | Dec 2024 | Solar |
| Sherburne North Project CSG | MN Solar Community, LLC | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Jun 2018 | Dec 2024 | Solar |
| Big Lake Project CSG | DG Minnesota CSG, LLC | Big Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | May 2018 | Dec 2024 | Solar |
| Meadow Lake Wind Farm VI LLC | Meadow Lake Wind Farm VI LLC | Remington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 634.2 GWh | Oct 2018 | Mar 2026 | Wind |
| Delphinus Community Solar | Delphinus Community Solar | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Feb 2018 | Dec 2024 | Solar |
| Corcoran CSG | Altus Power America Management, LLC | Corcoran, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Dec 2018 | Dec 2024 | Solar |
| Stuttgart Solar | Stuttgart Solar, LLC | Stuttgart, AR | Midcontinent Independent System Operator, Inc. (MISO) | 151.7 GWh | Dec 2017 | Mar 2026 | Solar |
| Hurricane Creek Lift Station | Johnson County Rural E M C | Greenwood, IN | Midcontinent Independent System Operator, Inc. (MISO) | 143.0 MWh | Aug 2004 | Dec 2024 | Distillate Fuel Oil |
| Chisago Holdco LLC, CSG | Chisago Holdco LLC | Center City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Apr 2019 | Dec 2024 | Solar |
| Hilltop Power | Hilltop Power, LLC | Edgerton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2008 | Dec 2024 | Wind |
| Bishop Hill III | Invenergy Services LLC | Cambridge, IL | Midcontinent Independent System Operator, Inc. (MISO) | 418.1 GWh | May 2018 | Mar 2026 | Wind |
| Delta Solar Power II | Delta Solar Power II, LLC | Grand Ledge, MI | Midcontinent Independent System Operator, Inc. (MISO) | 26.3 GWh | Jun 2018 | Dec 2024 | Solar |
| Delta Solar Power I | Delta Solar Power I, LLC | Grand Ledge, MI | Midcontinent Independent System Operator, Inc. (MISO) | 13.6 GWh | May 2018 | Dec 2024 | Solar |
| Crater Community Solar | Crater Community Solar | Granite Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Ivester Wind Farm | MidAmerican Energy Co | Wellsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 316.5 GWh | Nov 2018 | Mar 2026 | Wind |
| Oak Hill Solar Array | Southern Indiana Gas & Elec Co | Evansville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Oct 2018 | Dec 2024 | Solar |
| Volkman Road Solar Array Hybrid | Southern Indiana Gas & Elec Co | Evansville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Oct 2018 | Dec 2024 | Solar |
| Red Pine Wind Project | EDF Renewable Asset Holdings, Inc. | Ivanhoe, MN | Midcontinent Independent System Operator, Inc. (MISO) | 762.8 GWh | Nov 2017 | Mar 2026 | Wind |
| Equuleus Community Solar Gardens | MN8 Energy LLC | Rosemount, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.2 GWh | Jul 2017 | Dec 2024 | Solar |
| IKEA Oak Creek Rooftop PV System | IKEA Property Inc | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | May 2018 | Dec 2024 | Solar |
| DodgeSun CSG | National Grid Renewables | Kasson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.5 GWh | Nov 2017 | Dec 2024 | Solar |
| Johnson Solar CSG | National Grid Renewables | Edgerton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | Dec 2017 | Dec 2024 | Solar |
| Koppelman Sun CSG | National Grid Renewables | Eagle Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.1 GWh | Oct 2017 | Dec 2024 | Solar |
| Lindstrom Solar CSG | National Grid Renewables | Lindstrom, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Mar 2018 | Dec 2024 | Solar |
| Lake Waconia IV Community Solar Garden | Lake Waconia Solar IV LLC | Waconia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jan 2018 | Dec 2024 | Solar |
| SunE Feely 1 CSG, LLC | Ecoplexus, Inc | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Aug 2018 | Dec 2024 | Solar |
| WrightSun CSG, LLC | Cypress Creek Renewables | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 GWh | Dec 2017 | Dec 2024 | Solar |
| CF Novel Solar CSG Gardens Seven, LLC | Cypress Creek Renewables | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Heyer CSG | Heyer CSG LLC | Morristown, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2018 | Dec 2024 | Solar |
| FECC Solar Benton | Today's Power, Inc. | Benton, AR | Midcontinent Independent System Operator, Inc. (MISO) | 967.0 MWh | Feb 2017 | Oct 2024 | Solar |
| Upland Prairie | Interstate Power and Light Co | Spencer, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 TWh | Feb 2019 | Mar 2026 | Wind |
| English Farms | Interstate Power and Light Co | Montezuma, IA | Midcontinent Independent System Operator, Inc. (MISO) | 553.8 GWh | Feb 2019 | Mar 2026 | Wind |
| Veseli Community Solar Garden | Veseli Solar I LLC | Webster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jan 2018 | Dec 2024 | Solar |
| New Germany Community Solar Garden | New Germany Solar I LLC | New Germany, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Mar 2018 | Dec 2024 | Solar |
| Lake Waconia Community Solar Garden | Lake Waconia Solar LLC | Waconia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jan 2018 | Dec 2024 | Solar |
| CGSun, LLC Community Solar | Cypress Creek Renewables | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Nov 2017 | Dec 2024 | Solar |
| Zumbro Community Solar Garden | Zumbro Solar LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Mar 2018 | Dec 2024 | Solar |
| Syncarpha Prinsburg CSG (Ledeboer) | Prinsburg CSG I, LLC | Prinsburg, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Syncarpha Clara City CSG I (Stamer) | Clara City CSG I, LLC | Clara City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Cottage Grove Project CSG | DG Minnesota CSG, LLC | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.9 GWh | Sep 2018 | Dec 2024 | Solar |
| Staunton | Cypress Creek Renewables | Brazil, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Kaus Community Solar | National Grid Renewables | Claremont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Dec 2018 | Dec 2024 | Solar |
| Deneb Community Solar | National Grid Renewables | Belgrade, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2019 | Dec 2024 | Solar |
| Scandia CSG | DG Minnesota CSG, LLC | Scandia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Dec 2017 | Dec 2024 | Solar |
| MontSun Community Solar | Generate Capital | Montrose, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Nov 2017 | Dec 2024 | Solar |
| WaveSun Community Solar | Generate Capital | Waverly, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Nov 2017 | Dec 2024 | Solar |
| Krause CSG | Krause CSG LLC | Renville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2018 | Dec 2024 | Solar |
| Cottage Grove CSG, LLC | Ecoplexus, Inc | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.1 GWh | Feb 2018 | Dec 2024 | Solar |
| Fox CSG, LLC | Ecoplexus, Inc | Taylors Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 GWh | Feb 2018 | Dec 2024 | Solar |
| SunE Stolee CSG, LLC | Ecoplexus, Inc | Kenyon, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 GWh | Feb 2018 | Dec 2024 | Solar |
| Wyoming 2 CSG, LLC | Ecoplexus, Inc | Wyoming, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.2 GWh | Feb 2018 | Dec 2024 | Solar |
| Wright Cuddyer CSG | Minnesota Solar CSG 1, LLC | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Sep 2018 | Dec 2024 | Solar |
| Carver Gladden CSG | Minnesota Solar CSG 8, LLC | Norwood Young America, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Mar 2018 | Dec 2024 | Solar |
| Porter Way Community Solar Garden | AEP Onsite Partners, LLC | Waconia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Jan 2018 | Mar 2026 | Solar |
| RJC I CSG | RJC I CSG LLC | Owatonna, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jun 2018 | Dec 2024 | Solar |
| Huneke I CSG | Huneke I CSG LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2018 | Dec 2024 | Solar |
| Foxtail Wind, LLC | Foxtail Wind, LLC | Forbes, ND | Midcontinent Independent System Operator, Inc. (MISO) | 579.9 GWh | Dec 2019 | Mar 2026 | Wind |
| School Sisters CSG | School Sisters CSG LLC | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Apr 2018 | Dec 2024 | Solar |
| O'Fallon Renewable Energy Center | Union Electric Co - (MO) | O'Fallon, MO | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Nov 2014 | Dec 2024 | Solar |
| PopeSun CSG, LLC | Cypress Creek Renewables | Starbuck, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Nov 2017 | Dec 2024 | Solar |
| CF Novel Solar CSG Gardens Five, LLC | Cypress Creek Renewables | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 GWh | Nov 2017 | Dec 2024 | Solar |
| LeSun CSG, LLC | Cypress Creek Renewables | Waterville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.1 GWh | Dec 2017 | Dec 2024 | Solar |
| SABIC Innovative Plastics Mt. Vernon | SABIC IP Mt. Vernon, LLC | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 579.8 GWh | May 1996 | Mar 2026 | Natural Gas |
| Tuscola Wind II LLC | Tuscola Wind II LLC | Reese, MI | Midcontinent Independent System Operator, Inc. (MISO) | 291.9 GWh | Oct 2013 | Mar 2026 | Wind |
| MSC Sebewaing | Michigan Sugar Company | Sebewaing, MI | Midcontinent Independent System Operator, Inc. (MISO) | 509.0 MWh | Sep 1979 | Mar 2026 | Bituminous Coal : 67.9% Natural Gas : 32.1% |
| ADA Carbon Solutions Red River | ADA Carbon Solutions (Red River), LLC | Coushatta, LA | Midcontinent Independent System Operator, Inc. (MISO) | 106.1 GWh | Jan 2011 | Mar 2026 | Waste Heat |
| POET Biorefining Lake Crystal | POET Biorefining Lake Crystal | Lake Crystal, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.7 GWh | Mar 2005 | Mar 2026 | Natural Gas : 80.4% Distillate Fuel Oil : 19.6% |
| Rippey Wind Farm | Greenbacker Renewable Energy Corporation | Grand Junction, IA | Midcontinent Independent System Operator, Inc. (MISO) | 154.4 GWh | Jul 2012 | Dec 2024 | Wind |
| Cashton Greens Wind Farm | Cashton Greens Wind Farm LLC | Cashton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 10.7 GWh | Apr 2012 | Dec 2024 | Wind |
| Hawkeye Wind Farm | Greenbacker Renewable Energy Corporation | Sumner, IA | Midcontinent Independent System Operator, Inc. (MISO) | 173.3 GWh | Sep 2012 | Dec 2024 | Wind |
| IND Community Solar Farm 1st Phase | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.7 GWh | Oct 2013 | Dec 2024 | Solar |
| Greenfield Wind | Greenfield Wind Power, LLC | Greenfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Jul 2012 | Dec 2024 | Wind |
| Heritage Garden Wind Farm I LLC | DTE Sustainable Generation | Garden, MI | Midcontinent Independent System Operator, Inc. (MISO) | 74.9 GWh | Aug 2012 | Dec 2024 | Wind |
| LEPA Unit No. 1 | Louisiana Energy & Power Authority | Morgan City, LA | Midcontinent Independent System Operator, Inc. (MISO) | 144.7 GWh | May 2016 | Dec 2024 | Natural Gas |
| Watervliet | Energy Developments, Inc d/b/a EDL | Watervliet, MI | Midcontinent Independent System Operator, Inc. (MISO) | 28.2 GWh | Jan 2013 | Dec 2024 | Landfill Gas |
| Lake Charles Plant | Rain CII Carbon LLC | Sulphur, LA | Midcontinent Independent System Operator, Inc. (MISO) | 114.8 GWh | Nov 2012 | Oct 2025 | Waste Heat |
| Eolos Wind Energy Research Field Station | Regents of the University of Minnesota | Rosemount, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Sep 2011 | Dec 2024 | Wind |
| MSC Croswell | Michigan Sugar Company | Croswell, MI | Midcontinent Independent System Operator, Inc. (MISO) | 35.9 MWh | Sep 1948 | Jan 2025 | Natural Gas |
| Lansing BWL REO Town Plant | Lansing Board of Water and Light | Lansing, MI | Midcontinent Independent System Operator, Inc. (MISO) | 436.5 GWh | Jun 2013 | Dec 2024 | Natural Gas |
| Junction Hilltop Wind Farm | Junction Hilltop Management LLC | Dana, IA | Midcontinent Independent System Operator, Inc. (MISO) | 25.4 GWh | Feb 2012 | Dec 2024 | Wind |
| LSU Cogen | LSU and A&M College | Baton Rouge, LA | Midcontinent Independent System Operator, Inc. (MISO) | 72.9 GWh | Nov 2004 | Mar 2026 | Natural Gas |
| Echo Wind Park | DTE Electric Company | Elkton, MI | Midcontinent Independent System Operator, Inc. (MISO) | 563.6 GWh | Dec 2013 | Mar 2026 | Wind |
| McKinley Wind Park | DTE Electric Company | Pigeon, MI | Midcontinent Independent System Operator, Inc. (MISO) | 51.0 GWh | Nov 2012 | Mar 2026 | Wind |
| Rothschild Biomass Cogen Facility | Wisconsin Electric Power Co | Rothschild, WI | Midcontinent Independent System Operator, Inc. (MISO) | 152.8 GWh | Oct 2013 | Dec 2024 | Wood/Wood Waste Solids : 97.4% Natural Gas : 2.6% |
| Minden Wind Park | DTE Electric Company | Minden City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 109.6 GWh | Nov 2012 | Mar 2026 | Wind |
| Sigel Wind Park | DTE Electric Company | Harbor Beach, MI | Midcontinent Independent System Operator, Inc. (MISO) | 247.3 GWh | Nov 2012 | Mar 2026 | Wind |
| Red Rock Hydro Plant | Western Minnesota Mun Pwr Agny | Pella, IA | Midcontinent Independent System Operator, Inc. (MISO) | 207.1 GWh | Apr 2021 | Mar 2026 | Water |
Summary of Power Plants By State
Figures are based on March 2026 generation numbers.| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 76 | 10,194.39 GWh |
| Alaska | # 48 | 139 | 566.31 GWh |
| Arizona | # 15 | 183 | 8,256.99 GWh |
| Arkansas | # 25 | 114 | 4,973.03 GWh |
| California | # 5 | 1,656 | 15,197.83 GWh |
| Colorado | # 30 | 294 | 4,491.41 GWh |
| Connecticut | # 31 | 161 | 3,992.67 GWh |
| Delaware | # 49 | 33 | 248.78 GWh |
| District of Columbia | # 51 | 16 | 18.32 GWh |
| Florida | # 3 | 334 | 19,802.71 GWh |
| Georgia | # 8 | 247 | 10,697.11 GWh |
| Hawaii | # 46 | 69 | 784.18 GWh |
| Idaho | # 42 | 144 | 1,957.44 GWh |
| Illinois | # 4 | 379 | 15,489.73 GWh |
| Indiana | # 12 | 216 | 9,257.49 GWh |
| Iowa | # 21 | 289 | 6,478.67 GWh |
| Kansas | # 23 | 183 | 5,489.55 GWh |
| Kentucky | # 29 | 59 | 4,637.74 GWh |
| Louisiana | # 17 | 86 | 8,003.69 GWh |
| Maine | # 45 | 212 | 1,313.24 GWh |
| Maryland | # 39 | 202 | 2,834.84 GWh |
| Massachusetts | # 44 | 639 | 1,383.17 GWh |
| Michigan | # 13 | 268 | 8,564.76 GWh |
| Minnesota | # 26 | 760 | 4,875.53 GWh |
| Mississippi | # 24 | 55 | 5,467.46 GWh |
| Missouri | # 22 | 125 | 5,500.53 GWh |
| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 69 | 2,464.49 GWh |
| Nebraska | # 37 | 121 | 3,330.39 GWh |
| Nevada | # 35 | 114 | 3,487.65 GWh |
| New Hampshire | # 43 | 54 | 1,520.13 GWh |
| New Jersey | # 28 | 379 | 4,705.05 GWh |
| New Mexico | # 33 | 142 | 3,587.89 GWh |
| New York | # 9 | 935 | 10,247.40 GWh |
| North Carolina | # 11 | 896 | 9,821.46 GWh |
| North Dakota | # 32 | 59 | 3,854.12 GWh |
| Ohio | # 6 | 200 | 12,175.28 GWh |
| Oklahoma | # 19 | 142 | 7,305.54 GWh |
| Oregon | # 20 | 266 | 6,583.30 GWh |
| Pennsylvania | # 2 | 249 | 20,000.86 GWh |
| Rhode Island | # 47 | 100 | 610.71 GWh |
| South Carolina | # 14 | 204 | 8,273.25 GWh |
| South Dakota | # 41 | 52 | 2,184.62 GWh |
| Tennessee | # 18 | 88 | 7,335.80 GWh |
| Texas | # 1 | 961 | 46,858.09 GWh |
| Utah | # 38 | 125 | 3,184.50 GWh |
| Vermont | # 50 | 117 | 217.82 GWh |
| Virginia | # 16 | 233 | 8,059.42 GWh |
| Washington | # 7 | 131 | 10,773.76 GWh |
| West Virginia | # 34 | 40 | 3,543.98 GWh |
| Wisconsin | # 27 | 239 | 4,794.79 GWh |
| Wyoming | # 36 | 70 | 3,358.51 GWh |