Intel - Ocotillo Campus Solar
4500 S Dobson Rd, Chandler, AZ 85248Plant Summary Information
Intel - Ocotillo Campus Solar is ranked #97 out of 115 solar farms in Arizona in terms of total annual net electricity generation.
Intel - Ocotillo Campus Solar generated 529.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Intel - Ocotillo Campus Solar |
|---|---|
| Utility Name | Tesla Inc. |
| Location | Maricopa County, AZ |
| Initial Operation Date | December 2017 |
| Last Update | Dec 2024 |
| Annual Generation | 2.3 GWh |
| Annual Consumption | 9.8 k MMBtu |
| Ranked #10,065 out of 12,539 Power Plants Nationwide | |
| Ranked #4,892 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #150 out of 168 Arizona Power Plants | |
| Ranked #97 out of 115 Arizona Solar Power Plants | |
| Fuel Types | Solar |
Map of Intel - Ocotillo Campus Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Intel - Ocotillo Campus Solar.
Monthly Net Generation for Intel - Ocotillo Campus Solar
Intel - Ocotillo Campus Solar Details
| Summary Information | |
|---|---|
| Plant Name | Intel - Ocotillo Campus Solar (60822) |
| Plant Address | 4500 S Dobson Rd, Chandler, AZ 85248 |
| Utility | Tesla Inc. (57313) |
| Latitude, Longitude | 33.24326, -111.89235 |
| Generation Dates on File | Jan 2018 to Dec 2024 |
| Initial Operation Date | December 2017 |
| Annual Generation | 2.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Arizona Public Service Company (AZPS) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Salt River Project (16572) AZ |
| Grid Voltage | 0.48 kV |
| Energy Storage | No |
Generator PV1 Details Operating December 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2.8 MW |
| Summer Capacity | 2.8 MW |
| Winter Capacity | 2.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 162 |
| Tilt Angle | 5 |
| DC Net Capacity | 4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 4 MW |
| Virtual Net Metering Agreement | No |
Generator PV2 Details Operating March 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.4 MW |
| Summer Capacity | 1.4 MW |
| Winter Capacity | 1.4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 162 |
| Tilt Angle | 5 |
| DC Net Capacity | 2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 2 MW |
| Virtual Net Metering Agreement | No |
Intel - Ocotillo Campus Solar Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4882 | Norton Landfill Solar | Norton, MA | 2.4 GWh |
| #4883 | Gifford CSG | Schenectady, NY | 2.4 GWh |
| #4884 | Rose Acre Solar Energy Storage | Currituck, NC | 2.2 GWh |
| #4885 | Love Lane Solar | Upper Deerfield Towns, NJ | 2.4 GWh |
| #4886 | BWC Pocasset River | Wareham, MA | 2.4 GWh |
| #4887 | MN CSG 2019-38 DE LLC | Cleveland, MN | 2.4 GWh |
| #4888 | Calabro Airport North Solar Project | Shirley, NY | 2.4 GWh |
| #4889 | Deshler Solar | Hebron, NE | 2.3 GWh |
| #4890 | Bayer - Whippany, NJ | Whippany, NJ | 2.3 GWh |
| #4891 | Dulles | Jurupa Valley, CA | 2.3 GWh |
| #4893 | SR Skylark C | Windsor, CO | 2.3 GWh |
| #4894 | Urbana-Heartland | Chanute, KS | 2.3 GWh |
| #4895 | Whiskey Hill Solar | Walden, CO | 2.3 GWh |
| #4896 | Faunce Corner Community Solar | Dartmouth, MA | 2.2 GWh |
| #4897 | Studebaker | Fredonia, KS | 2.3 GWh |
| #4898 | Ny Frankfort Bleecker St - Frankfort -NG | Frankfort, NY | 2.3 GWh |
| #4899 | DG AMP Solar Brewster | Brewster, OH | 2.3 GWh |
| #4900 | Sidney | Sidney, ME | 2.3 GWh |
| #4901 | Billings Road | Hardwick, VT | 2.3 GWh |
| #4902 | FreeState Kiro Solar I | Silver Lake, KS | 2.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Intel - Ocotillo Campus Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arizona State University CHP | Tempe, AZ | 40.2 GWh | 12.2 mi |
| AZ State University - Tempe Campus Solar | Tempe, AZ | 1.1 GWh | 12.7 mi |
| Banner Solar Ironwood | Queen Creek, AZ | 3.8 GWh | 18.9 mi |
| Copper Crossing Energy and Research Cent | Florence, AZ | 5.1 GWh | 24.4 mi |
| Desert Basin | Casa Grande, AZ | 2.0 TWh | 24.2 mi |
| Gilbert Solar Facility I, LLC | Gilbert, AZ | 3.8 GWh | 9.4 mi |
| Jewish Community Center PV | Scottsdale, AZ | 1.8 GWh | 24.9 mi |
| Kyrene | Tempe, AZ | 910.1 GWh | 8.1 mi |
| Mesa Carport PV | Mesa, AZ | 7.5 GWh | 18.2 mi |
| Ocotillo | Tempe, AZ | 473.2 GWh | 12.4 mi |
| Phoenix Airport East Economy Lot | Phoenix, AZ | 1.3 GWh | 14.2 mi |
| Phoenix Airport Rental Car Center | Phoenix, AZ | 4.4 GWh | 15.6 mi |
| Poseidon Solar, LLC | Globe, AZ | 50.2 GWh | 24.3 mi |
| Queen Creek Solar Farm | Queen Creek, AZ | 40.7 GWh | 16.3 mi |
| Santan | Gilbert, AZ | 5.8 TWh | 10.3 mi |
| T0588 Phoenix - AZ | Phoenix, AZ | 2.1 GWh | 23.5 mi |
| TJX Phoenix | Phoenix, AZ | 5.0 GWh | 20.5 mi |
| Union HS at Casa Grande | Casa Grande, AZ | 2.9 GWh | 23 mi |
| Vista Grande HS at Casa Grande | Casa Grande, AZ | 2.8 GWh | 26.4 mi |
| West Phoenix | Phoenix, AZ | 4.2 TWh | 20.6 mi |