Solana Generating Station is ranked #18 out of 6,487 solar farms nationwide in terms of total annual net electricity generation.
Solana Generating Station generated 101.6 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Solana Generating Station |
|---|---|
| Utility Name | Arizona Solar One LLC |
| Location | Maricopa County, AZ |
| Initial Operation Date | October 2013 |
| Last Update | Feb 2026 |
| Annual Generation | 853.4 GWh |
| Annual Consumption | 9.3 M MMBtu |
| Ranked #842 out of 12,637 Power Plants Nationwide | |
| Ranked #18 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #27 out of 170 Arizona Power Plants | |
| Ranked #2 out of 117 Arizona Solar Power Plants | |
| Fuel Types | Solar |
Map of Solana Generating Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Solana Generating Station.
Monthly Net Generation for Solana Generating Station
Monthly Plant Fuel Consumption for Solana Generating Station
Solana Generating Station Details
| Summary Information | |
|---|---|
| Plant Name | Solana Generating Station (56812) |
| Plant Address | 57750 S. Painted Rock Dam Road, Gila Bend, AZ 85337 |
| Utility | Arizona Solar One LLC (56023) |
| Latitude, Longitude | 32.92229, -112.95594 |
| Generation Dates on File | Oct 2013 to Feb 2026 |
| Initial Operation Date | October 2013 |
| Annual Generation | 853.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | ER10-2774-000, ER10-2774-001 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Arizona Public Service Company (AZPS) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | GW |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Arizona Public Service Co (803) AZ |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator GEN 1 Details Operating October 2013
| Technology | Solar Thermal with Energy Storage |
|---|---|
| Prime Mover | Concentrated Solar Power |
| Ownership | Single Owner |
| Nameplate Capacity | 140 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 147.8 MW |
| Winter Capacity | 147.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2013 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Parabolic Trough | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
| Energy Storage Details | |
| Load Management | Yes |
|---|---|
| Excess Wind And Solar Generation | Yes |
Generator GEN2 Details Operating October 2013
| Technology | Solar Thermal with Energy Storage |
|---|---|
| Prime Mover | Concentrated Solar Power |
| Ownership | Single Owner |
| Nameplate Capacity | 140 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 147.8 MW |
| Winter Capacity | 147.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2013 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Parabolic Trough | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
| Energy Storage Details | |
| Load Management | Yes |
|---|---|
| Excess Wind And Solar Generation | Yes |
Solana Generating Station Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #8 | Topaz Solar Farm | Santa Margarita, CA | 1.0 TWh |
| #9 | 2W Permian Solar Project Hybrid | Andrews, TX | 1.0 TWh |
| #10 | Aktina Solar | El Campo, TX | 1.0 TWh |
| #11 | Mockingbird Solar Center | Brookston, TX | 943.5 GWh |
| #12 | Old 300 Solar Center, LLC | Needville, TX | 939.4 GWh |
| #13 | Waco Solar | Mt Calm, TX | 915.1 GWh |
| #14 | Eagle Shadow Mountain Solar Farm | Moapa, NV | 893.1 GWh |
| #15 | Solar Star 1 | Rosamond, CA | 888.2 GWh |
| #16 | Double Back Diamond | Virden, IL | 887.5 GWh |
| #17 | Daggett 3 | Daggett, CA | 859.8 GWh |
| #19 | Desert Quartzite | Blythe, CA | 830.4 GWh |
| #20 | Greasewood II LLC | Girvin, TX | 846.1 GWh |
| #21 | Eleven Mile Solar Center | Coolidge, AZ | 791.1 GWh |
| #22 | Dunns Bridge II Solar | San Pierre, IN | 811.1 GWh |
| #23 | Arica Solar | Desert Center, CA | 779.1 GWh |
| #24 | Red Tailed Hawk Solar LLC | Pierce, TX | 798.8 GWh |
| #25 | Harquahala 2 | Tonopah, AZ | 750.4 GWh |
| #26 | Sun Streams 4 | Tonopah, AZ | 732.1 GWh |
| #27 | Juno Solar Project | Lamesa, TX | 761.1 GWh |
| #28 | Five Wells Solar Center - Hybrid | Rogers, TX | 732.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Solana Generating Station.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agave | Arlington, AZ | 298.0 GWh | 28.6 mi |
| Arlington Valley Energy Facility | Arlington, AZ | 3.0 TWh | 29.2 mi |
| Arlington Valley Solar Energy II | Arlington, AZ | 341.2 GWh | 27.4 mi |
| Cotton Center Solar Hybrid | Gila Bend, AZ | 36.5 GWh | 18.7 mi |
| Desert Star Hybrid | Buckeye, AZ | 29.2 GWh | 23 mi |
| Gila Bend Hybrid | Gila Bend, AZ | 84.7 GWh | 4.5 mi |
| Gila River Power Block 1 | Gila Bend, AZ | 2.9 TWh | 15.6 mi |
| Gila River Power Block 2 | Gila Bend, AZ | 2.4 TWh | 15.6 mi |
| Gila River Power Block 3 | Gila Bend, AZ | 3.2 TWh | 15.6 mi |
| Gila River Power Block 4 | Gila Bend, AZ | 2.4 TWh | 15.6 mi |
| Hyder II Hybrid | Hyder, AZ | 32.5 GWh | 23.9 mi |
| Hyder Solar Hybrid | Hyder, AZ | 35.3 GWh | 23.6 mi |
| Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh | 29.1 mi |
| Mesquite Solar 2, LLC | Tonopah, AZ | 288.1 GWh | 28.5 mi |
| Mesquite Solar 4, LLC | Tonopah, AZ | 143.2 GWh | 28 mi |
| Mesquite Solar 5, LLC | Tonopah, AZ | 137.5 GWh | 27.9 mi |
| Paloma Solar Hybrid | Gila Bend, AZ | 31.9 GWh | 18.4 mi |
| RE Gillespie 1 LLC | Gila Bend, AZ | 36.8 GWh | 18.3 mi |
| Red Hawk | Arlington, AZ | 5.2 TWh | 29.3 mi |
| Sun Streams 2 | Hassayampa, AZ | 336.2 GWh | 28.7 mi |