Chevelon Butte Wind Farm
25400 State Route 99, Winslow, AZ 86047Plant Summary Information
Chevelon Butte Wind Farm is ranked #29 out of 163 power plants in Arizona in terms of total annual net electricity generation.
Chevelon Butte Wind Farm generated 180.5 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Chevelon Butte Wind Farm |
---|---|
Utility Name | AES Clean Energy |
Location | Coconino County, AZ |
Initial Operation Date | May 2023 |
Last Update | Mar 2025 |
Annual Generation | 614.3 GWh |
Annual Consumption | 2.3 M MMBtu |
Ranked #1,104 out of 12,288 Power Plants Nationwide | |
Ranked #260 out of 1,353 Wind Power Plants Nationwide | |
Ranked #29 out of 163 Arizona Power Plants | |
Ranked #2 out of 9 Arizona Wind Power Plants | |
Fuel Types | Wind |
Map of Chevelon Butte Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chevelon Butte Wind Farm.
Monthly Net Generation for Chevelon Butte Wind Farm
Chevelon Butte Wind Farm Details
Summary Information | |
---|---|
Plant Name | Chevelon Butte Wind Farm (66001) |
Plant Address | 25400 State Route 99, Winslow, AZ 86047 |
Utility | AES Clean Energy (64904) |
Latitude, Longitude | 34.6815, -110.80173 |
Generation Dates on File | May 2023 to Mar 2025 |
Initial Operation Date | May 2023 |
Annual Generation | 614.3 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 'pending' |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Arizona Public Service Company (AZPS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Arizona Public Service Co (803) AZ |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator CHVB Details Operating May 2023
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 238.2 MW |
Summer Capacity | 238.2 MW |
Winter Capacity | 238.2 MW |
Minimum Load | 2.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 57 |
Turbine Details | |
Number Of Turbines | 57 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V15 |
Design Wind Speed | 15.5 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 393.7 |
Chevelon Butte Wind Farm Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#250 | Wild Horse | Ellensburg, WA | 631.0 GWh |
#251 | Tatanka Ridge | Toronto, SD | 627.1 GWh |
#252 | Caney River Wind Project | Howard, KS | 626.6 GWh |
#253 | Bison 4 Wind Energy Center | New Salem, ND | 624.2 GWh |
#254 | Headwaters Wind Farm LLC | Winchester, IN | 622.9 GWh |
#255 | Cedar Springs II | Douglas, WY | 622.5 GWh |
#256 | FPL Energy Crystal Lake Wind LLC | Britt, IA | 618.3 GWh |
#257 | Pilot Hill Wind Farm | Herscher, IL | 618.3 GWh |
#258 | Cedar Creek II | New Raymer, CO | 617.6 GWh |
#259 | Moraine Sands Wind Power | Mason City, IL | 615.0 GWh |
#261 | Border Winds Wind Farm | Rolla, ND | 614.0 GWh |
#262 | Carousel Wind Farm LLC | Burlington, CO | 613.9 GWh |
#263 | Boiling Springs Wind Farm | Woodward, OK | 609.4 GWh |
#264 | Prairie Wind Farm | Montezuma, IA | 608.2 GWh |
#265 | Route 66 Wind Plant | Panhandle, TX | 608.2 GWh |
#266 | English Farms | Montezuma, IA | 605.9 GWh |
#267 | NaturEner Rim Rock Energy | Kevin, MT | 604.6 GWh |
#268 | Sundance Wind Project, LLC | Alva, OK | 604.3 GWh |
#269 | Golden Hill Wind | Wasco, OR | 603.5 GWh |
#270 | King Creek Wind Farm 2, LLC | Throckmorton, TX | 603.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chevelon Butte Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Babbitt Ranch Energy Center | Flagstaff, AZ | 386.5 GWh | 88.9 mi |
Chevelon Butte Phase 2 | Winslow, AZ | 452.6 GWh | 0.1 mi |
Chino Valley Solar | Chino Valley, AZ | 41.0 GWh | 92.5 mi |
Cholla | Joseph City, AZ | 1.3 TWh | 33.4 mi |
Coronado | St Johns, AZ | 2.8 TWh | 87.3 mi |
Dry Lake Wind LLC | Heber, AZ | 108.4 GWh | 29.4 mi |
Horse Mesa | Apache Junction, AZ | 113.1 GWh | 81.5 mi |
Jewish Community Center PV | Scottsdale, AZ | 1.8 GWh | 98.4 mi |
Lake Pleasant WTP | Peoria, AZ | 12.9 GWh | 101.4 mi |
Mesa Carport PV | Mesa, AZ | 7.5 GWh | 103 mi |
Mormon Flat | Apache Junction, AZ | 57.3 GWh | 86.1 mi |
Novo BioPower Plant | Snowflake, AZ | 175.6 GWh | 29.3 mi |
Paradise Valley H.S. PV | Phoenix, AZ | 2.1 GWh | 99.3 mi |
Perrin Ranch Wind LLC | Williams, AZ | 178.9 GWh | 97.4 mi |
Poseidon Wind, LLC | Herber, AZ | 107.2 GWh | 36.1 mi |
Prescott Airport | Prescott, AZ | 2.5 GWh | 90.9 mi |
Prescott Solar Plant | Prescott, AZ | 23.0 GWh | 92.4 mi |
Roosevelt | Roosevelt, AZ | 101.8 GWh | 72.8 mi |
Springerville | Springerville, AZ | 5.4 TWh | 96.6 mi |
Stewart Mountain | Phoenix, AZ | 45.7 GWh | 87.8 mi |