Chevelon Butte Wind Farm
25400 State Route 99, Winslow, AZ 86047Plant Summary Information
Chevelon Butte Wind Farm is ranked #29 out of 168 power plants in Arizona in terms of total annual net electricity generation.
Chevelon Butte Wind Farm generated 160.5 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Chevelon Butte Wind Farm |
|---|---|
| Utility Name | AES Clean Energy |
| Location | Coconino County, AZ |
| Initial Operation Date | May 2023 |
| Last Update | Sep 2025 |
| Annual Generation | 633.1 GWh |
| Annual Consumption | 2.3 M MMBtu |
| Ranked #1,083 out of 12,539 Power Plants Nationwide | |
| Ranked #244 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #29 out of 168 Arizona Power Plants | |
| Ranked #2 out of 9 Arizona Wind Power Plants | |
| Fuel Types | Wind |
Map of Chevelon Butte Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chevelon Butte Wind Farm.
Monthly Net Generation for Chevelon Butte Wind Farm
Chevelon Butte Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Chevelon Butte Wind Farm (66001) |
| Plant Address | 25400 State Route 99, Winslow, AZ 86047 |
| Utility | AES Clean Energy (64904) |
| Latitude, Longitude | 34.6815, -110.80173 |
| Generation Dates on File | May 2023 to Sep 2025 |
| Initial Operation Date | May 2023 |
| Annual Generation | 633.1 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 'pending' |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Arizona Public Service Company (AZPS) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Arizona Public Service Co (803) AZ |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator CHVB Details Operating May 2023
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 238.2 MW |
| Summer Capacity | 238.2 MW |
| Winter Capacity | 238.2 MW |
| Minimum Load | 2.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 57 |
| Turbine Details | |
| Number Of Turbines | 57 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V15 |
| Design Wind Speed | 15.5 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 393.7 |
Chevelon Butte Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #234 | Sweetwater Wind 4 LLC | Roscoe, TX | 644.6 GWh |
| #235 | Reading Wind Project | Reading, KS | 644.1 GWh |
| #236 | Sugar Creek Wind One LLC | TBD, IL | 642.8 GWh |
| #237 | Meadow Lake Wind Farm VI LLC | Remington, IN | 639.7 GWh |
| #238 | Brady II Wind Energy Center | Dickinson, ND | 638.9 GWh |
| #239 | Kelly Creek Wind Project | Cabery, IL | 638.3 GWh |
| #240 | Buckeye Wind Energy Center | Hays, KS | 638.1 GWh |
| #241 | El Sauz Ranch Wind, LLC | San Perlita, TX | 636.3 GWh |
| #242 | Coyote Wind LLC | Snyder, TX | 635.5 GWh |
| #243 | Glacier Sands Wind Power, LLC | Mason City, IL | 635.4 GWh |
| #245 | Brady Wind Energy Center | Dickinson, ND | 632.3 GWh |
| #246 | Heart of Texas Wind Project | Brady, TX | 629.5 GWh |
| #247 | Rio Bravo Windpower, LLC | Roma, TX | 628.6 GWh |
| #248 | Oso Grande Wind Farm | Maljamar, NM | 628.5 GWh |
| #249 | Horizon Hill Wind Project | Crescent, OK | 626.6 GWh |
| #250 | Castle Gap Wind | Goldthwaite, TX | 626.0 GWh |
| #251 | Bison 4 Wind Energy Center | New Salem, ND | 624.2 GWh |
| #252 | Limon III Wind LLC | Limon, CO | 623.9 GWh |
| #253 | FPL Energy Illinois Wind LLC Hybrid | Shabbona, IL | 619.8 GWh |
| #254 | Pilot Hill Wind Farm | Herscher, IL | 618.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chevelon Butte Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Babbitt Ranch Energy Center | Flagstaff, AZ | 560.1 GWh | 88.9 mi |
| Chevelon Butte Phase 2 | Winslow, AZ | 535.8 GWh | 0.1 mi |
| Chino Valley Solar | Chino Valley, AZ | 41.0 GWh | 92.5 mi |
| Cholla | Joseph City, AZ | 1.3 TWh | 33.4 mi |
| Coronado | St Johns, AZ | 2.6 TWh | 87.3 mi |
| Dry Lake Wind LLC | Heber, AZ | 110.3 GWh | 29.4 mi |
| Horse Mesa | Apache Junction, AZ | 96.4 GWh | 81.5 mi |
| Jewish Community Center PV | Scottsdale, AZ | 1.8 GWh | 98.4 mi |
| Lake Pleasant WTP | Peoria, AZ | 12.9 GWh | 101.4 mi |
| Mesa Carport PV | Mesa, AZ | 7.5 GWh | 103 mi |
| Mormon Flat | Apache Junction, AZ | 48.0 GWh | 86.1 mi |
| Novo BioPower Plant | Snowflake, AZ | 168.1 GWh | 29.3 mi |
| Paradise Valley H.S. PV | Phoenix, AZ | 2.1 GWh | 99.3 mi |
| Perrin Ranch Wind LLC | Williams, AZ | 178.8 GWh | 97.4 mi |
| Poseidon Wind, LLC | Herber, AZ | 106.8 GWh | 36.1 mi |
| Prescott Airport | Prescott, AZ | 2.5 GWh | 90.9 mi |
| Prescott Solar Plant | Prescott, AZ | 23.0 GWh | 92.4 mi |
| Roosevelt | Roosevelt, AZ | 101.8 GWh | 72.8 mi |
| Springerville | Springerville, AZ | 5.2 TWh | 96.6 mi |
| Stewart Mountain | Phoenix, AZ | 45.7 GWh | 87.8 mi |