Chevelon Butte Wind Farm
25400 State Route 99, Winslow, AZ 86047Plant Summary Information
Chevelon Butte Wind Farm is ranked #29 out of 168 power plants in Arizona in terms of total annual net electricity generation.
Chevelon Butte Wind Farm generated 117.0 GWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Chevelon Butte Wind Farm |
|---|---|
| Utility Name | AES Clean Energy |
| Location | Coconino County, AZ |
| Initial Operation Date | May 2023 |
| Last Update | Nov 2025 |
| Annual Generation | 622.0 GWh |
| Annual Consumption | 2.3 M MMBtu |
| Ranked #1,097 out of 12,574 Power Plants Nationwide | |
| Ranked #253 out of 1,370 Wind Power Plants Nationwide | |
| Ranked #29 out of 168 Arizona Power Plants | |
| Ranked #2 out of 9 Arizona Wind Power Plants | |
| Fuel Types | Wind |
Map of Chevelon Butte Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chevelon Butte Wind Farm.
Monthly Net Generation for Chevelon Butte Wind Farm
Chevelon Butte Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Chevelon Butte Wind Farm (66001) |
| Plant Address | 25400 State Route 99, Winslow, AZ 86047 |
| Utility | AES Clean Energy (64904) |
| Latitude, Longitude | 34.6815, -110.80173 |
| Generation Dates on File | May 2023 to Nov 2025 |
| Initial Operation Date | May 2023 |
| Annual Generation | 622.0 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 'pending' |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Arizona Public Service Company (AZPS) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Arizona Public Service Co (803) AZ |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator CHVB Details Operating May 2023
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 238.2 MW |
| Summer Capacity | 238.2 MW |
| Winter Capacity | 238.2 MW |
| Minimum Load | 2.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 57 |
| Turbine Details | |
| Number Of Turbines | 57 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V15 |
| Design Wind Speed | 15.5 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 393.7 |
Chevelon Butte Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #243 | Cedar Springs II | Douglas, WY | 630.1 GWh |
| #244 | Foote Creek Rim | McFadden, WY | 628.9 GWh |
| #245 | King Creek Wind Farm 2, LLC | Throckmorton, TX | 628.5 GWh |
| #246 | Sweetwater Wind 4 LLC | Roscoe, TX | 628.5 GWh |
| #247 | Foxtail Wind, LLC | Forbes, ND | 627.5 GWh |
| #248 | Reading Wind Project | Reading, KS | 624.3 GWh |
| #249 | Bison 4 Wind Energy Center | New Salem, ND | 624.2 GWh |
| #250 | Castle Gap Wind | Goldthwaite, TX | 624.1 GWh |
| #251 | Coyote Wind LLC | Snyder, TX | 623.1 GWh |
| #252 | FPL Energy Illinois Wind LLC Hybrid | Shabbona, IL | 620.5 GWh |
| #254 | Kelly Creek Wind Project | Cabery, IL | 621.9 GWh |
| #255 | Pilot Hill Wind Farm | Herscher, IL | 618.3 GWh |
| #256 | Mesteno | Rio Grande City, TX | 618.0 GWh |
| #257 | Headwaters Wind Farm LLC | Winchester, IN | 617.8 GWh |
| #258 | Dakota Range III Wind Project | Summit, SD | 615.9 GWh |
| #259 | Border Winds Wind Farm | Rolla, ND | 614.0 GWh |
| #260 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 614.0 GWh |
| #261 | Carousel Wind Farm LLC | Burlington, CO | 613.9 GWh |
| #262 | Horizon Hill Wind Project | Crescent, OK | 612.7 GWh |
| #263 | Aragonne Wind LLC | Santa Rosa, NM | 611.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chevelon Butte Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Babbitt Ranch Energy Center | Flagstaff, AZ | 555.4 GWh | 88.9 mi |
| Chevelon Butte Phase 2 | Winslow, AZ | 523.1 GWh | 0.1 mi |
| Chino Valley Solar | Chino Valley, AZ | 41.0 GWh | 92.5 mi |
| Cholla | Joseph City, AZ | 1.3 TWh | 33.4 mi |
| Coronado | St Johns, AZ | 2.7 TWh | 87.3 mi |
| Dry Lake Wind LLC | Heber, AZ | 106.7 GWh | 29.4 mi |
| Horse Mesa | Apache Junction, AZ | 87.8 GWh | 81.5 mi |
| Jewish Community Center PV | Scottsdale, AZ | 1.8 GWh | 98.4 mi |
| Lake Pleasant WTP | Peoria, AZ | 12.9 GWh | 101.4 mi |
| Mesa Carport PV | Mesa, AZ | 7.5 GWh | 103 mi |
| Mormon Flat | Apache Junction, AZ | 45.2 GWh | 86.1 mi |
| Novo BioPower Plant | Snowflake, AZ | 168.1 GWh | 29.3 mi |
| Paradise Valley H.S. PV | Phoenix, AZ | 2.1 GWh | 99.3 mi |
| Perrin Ranch Wind LLC | Williams, AZ | 174.6 GWh | 97.4 mi |
| Poseidon Wind, LLC | Herber, AZ | 102.4 GWh | 36.1 mi |
| Prescott Airport | Prescott, AZ | 2.5 GWh | 90.9 mi |
| Prescott Solar Plant | Prescott, AZ | 23.0 GWh | 92.4 mi |
| Roosevelt | Roosevelt, AZ | 101.8 GWh | 72.8 mi |
| Springerville | Springerville, AZ | 5.4 TWh | 96.6 mi |
| Stewart Mountain | Phoenix, AZ | 45.7 GWh | 87.8 mi |