Big Elm Solar
8856 Connection Rd., Troy, TX 76579Plant Summary Information
Big Elm Solar is ranked #59 out of 251 solar farms in Texas in terms of total annual net electricity generation.
Big Elm Solar generated 126.4 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Big Elm Solar |
|---|---|
| Utility Name | Big Elm Solar, LLC |
| Location | Bell County, TX |
| Initial Operation Date | January 2025 |
| Last Update | Jun 2026 |
| Annual Generation | 467.5 GWh |
| Annual Consumption | 1.8 M MMBtu |
| Ranked #1,442 out of 13,094 Power Plants Nationwide | |
| Ranked #142 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #302 out of 858 Texas Power Plants | |
| Ranked #59 out of 251 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Big Elm Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Big Elm Solar.
Monthly Net Generation for Big Elm Solar
Monthly Plant Fuel Consumption for Big Elm Solar
Big Elm Solar Details
| Summary Information | |
|---|---|
| Plant Name | Big Elm Solar (68180) |
| Plant Address | 8856 Connection Rd., Troy, TX 76579 |
| Utility | Big Elm Solar, LLC (66615) |
| Latitude, Longitude | 31.14105, -97.21698 |
| Generation Dates on File | Jan 2025 to Jun 2026 |
| Initial Operation Date | January 2025 |
| Annual Generation | 467.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator BELMS Details Operating January 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 272 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Big Elm Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #132 | Noble Solar | Krum, TX | 487.1 GWh |
| #133 | Great Valley Solar Portfolio Holdings, L | Cantua Creek, CA | 490.0 GWh |
| #134 | Proxima | Crows Landing, CA | 467.5 GWh |
| #135 | Townsite Solar Project Hybrid | Boulder City, NV | 468.6 GWh |
| #136 | Galloway 1 Solar Farm | Paint Rock, TX | 480.1 GWh |
| #137 | Angelo Solar | San Angelo, TX | 479.8 GWh |
| #138 | ENGIE Long Draw Solar LLC | Gail, TX | 478.8 GWh |
| #139 | Sequoia 1 | Cisco, TX | 477.6 GWh |
| #140 | Decatur Solar | Climax, GA | 475.2 GWh |
| #141 | TS Power Plant | Battle Mountain, NV | 1.6 TWh |
| #143 | Estonian Solar Project, LLC | Cooper, TX | 455.9 GWh |
| #144 | Harquahala Sun Solar Project | Tonopah, AZ | 464.4 GWh |
| #145 | Golden Triangle | Lowndes, MS | 456.4 GWh |
| #146 | Taygete II Energy Project | Coyanosa, TX | 462.9 GWh |
| #147 | Hecate Energy Longhorn Solar LLC | Jacksboro, TX | 461.4 GWh |
| #148 | Sandrini Solar 200 | Mettler, CA | 457.7 GWh |
| #149 | Hornshadow Solar II, LLC | Castle Dale, UT | 456.4 GWh |
| #150 | Horizon Solar | Pearsall, TX | 455.8 GWh |
| #151 | Pisgah Ridge Solar, LLC | Richland, TX | 453.7 GWh |
| #152 | Techren Solar II LLC | Boulder, NV | 452.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Big Elm Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blevins Solar & Storage | Eddy, TX | 268.8 GWh | 5.2 mi |
| BPL Crown Solar LLC | Chilton, TX | 212.0 GWh | 16.3 mi |
| BPL Sol Solar LLC | Chilton, TX | 207.7 GWh | 16.3 mi |
| BT Jungmann | Buckholts, TX | 80.8 GWh | 18.9 mi |
| Cattlemen Solar II | Rosebud, TX | 249.7 GWh | 21.6 mi |
| Cattlemen Solar Park | Rosebud, TX | 419.9 GWh | 22.2 mi |
| Chillingham Solar | Rogers, TX | 656.0 GWh | 9.7 mi |
| Eddy II | Eddy, TX | 16.5 GWh | 10.7 mi |
| Five Wells Solar Center - Hybrid | Rogers, TX | 677.1 GWh | 10.1 mi |
| HEB00182 | Temple, TX | 236.0 MWh | 10.3 mi |
| HEBTEMDistCenter | Temple, TX | 618.0 MWh | 8.6 mi |
| HEBTEMDistCenter1B | Temple, TX | 309.0 MWh | 8.6 mi |
| HEBTEMDistCenter2A | Temple, TX | 309.0 MWh | 8.6 mi |
| Orion I Solar Project | Burlington, TX | 432.9 GWh | 16.2 mi |
| Orion II Solar Project | Rosebud, TX | 540.2 GWh | 18.4 mi |
| Orion III Solar Project | Buckholts, TX | 524.7 GWh | 13.6 mi |
| Stillhouse Solar | Rogers, TX | 244.6 GWh | 12.4 mi |
| Temple Power Station | Temple, TX | 8.4 TWh | 8.4 mi |
| WAL1232 | Belton, TX | 368.0 MWh | 14.8 mi |
| WAL6929 | Temple, TX | 345.0 MWh | 11.8 mi |