Lost Pines 1 Power Project
256 Power Plant Road, Bastrop, TX 78602Plant Summary Information
Lost Pines 1 Power Project is ranked #49 out of 314 natural gas power plants in Texas in terms of total annual net electricity generation.
Lost Pines 1 Power Project is comprised of 3 generators and generated 1.0 TWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Lost Pines 1 Power Project |
|---|---|
| Utility Name | Lower Colorado River Authority |
| Location | Bastrop County, TX |
| Initial Operation Date | May 2001 |
| Last Update | Sep 2025 |
| Annual Generation | 2.3 TWh |
| Annual Consumption | 19.3 M MMBtu |
| Ranked #471 out of 12,539 Power Plants Nationwide | |
| Ranked #287 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #64 out of 799 Texas Power Plants | |
| Ranked #49 out of 314 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Lost Pines 1 Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lost Pines 1 Power Project.
Monthly Net Generation for Lost Pines 1 Power Project
Lost Pines 1 Power Project Details
| Summary Information | |
|---|---|
| Plant Name | Lost Pines 1 Power Project (55154) |
| Plant Address | 256 Power Plant Road, Bastrop, TX 78602 |
| Utility | Lower Colorado River Authority (11269) |
| Latitude, Longitude | 30.1478, -97.2714 |
| Generation Dates on File | Jun 2001 to Sep 2025 |
| Initial Operation Date | May 2001 |
| Annual Generation | 2.3 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Lake Bastrop |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Austin Energy (1015) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name |
ENERGY TRANSFER COMPANY TEXAS PL LTD ENTERPRISE TEXAS PIPELINE |
| Natural Gas Storage | No |
Generator CTA Details Operating May 2001
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 202.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 169 MW |
| Winter Capacity | 178 MW |
| Minimum Load | 105 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2001 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTB Details Operating May 2001
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 202.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 169 MW |
| Winter Capacity | 178 MW |
| Minimum Load | 105 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2001 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator ST Details Operating May 2001
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Jointly Owned |
| Duct Burners | No |
| Nameplate Capacity | 204 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 172 MW |
| Winter Capacity | 184 MW |
| Minimum Load | 65 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2001 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Lost Pines 1 Power Project Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Lower Colorado River Authority | 3700 Lake Austin Blvd, Austin, TX 78703 | Generator CTA | 50.00% |
| GENTEX Power Corp | 3700 Lake Austin Blvd, Austin, TX 78703 | Generator CTA | 50.00% |
| Lower Colorado River Authority | 3700 Lake Austin Blvd, Austin, TX 78703 | Generator CTB | 50.00% |
| GENTEX Power Corp | 3700 Lake Austin Blvd, Austin, TX 78703 | Generator CTB | 50.00% |
| Lower Colorado River Authority | 3700 Lake Austin Blvd, Austin, TX 78703 | Generator ST | 50.00% |
| GENTEX Power Corp | 3700 Lake Austin Blvd, Austin, TX 78703 | Generator ST | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #277 | Metcalf Energy Center | San Jose, CA | 2.5 TWh |
| #278 | W A Parish | Thompsons, TX | 15.4 TWh |
| #279 | Corpus Christi Energy Center | Corpus Christi, TX | 2.5 TWh |
| #280 | Caithness Long Island Energy Center | Yaphank, NY | 2.5 TWh |
| #281 | R D Morrow | Purvis, MS | 2.4 TWh |
| #282 | Rocky Mountain Energy Center | Keenesburg, CO | 2.4 TWh |
| #283 | TalenEnergy Martins Creek | Bangor, PA | 2.4 TWh |
| #284 | Bridgeport Energy Project | Bridgeport, CT | 2.4 TWh |
| #285 | Emery Station | Clear Lake, IA | 2.3 TWh |
| #286 | Oyster Creek Unit VIII | Freeport, TX | 2.3 TWh |
| #288 | Gulf Clean Energy Center | Pensacola, FL | 2.3 TWh |
| #289 | Attala | Sallis, MS | 2.3 TWh |
| #290 | Black Dog | Burnsville, MN | 2.3 TWh |
| #291 | Mint Farm Generating Station | Longview, WA | 2.3 TWh |
| #292 | Sweeny Cogen Facility | Old Ocean, TX | 3.3 TWh |
| #293 | Cedar Bayou 4 | Eldon, TX | 2.3 TWh |
| #294 | Dogwood Energy Facility | Pleasant Hill, MO | 2.2 TWh |
| #295 | Coyote Springs II | Boardman, OR | 2.2 TWh |
| #296 | Colorado Bend Energy Center | Wharton, TX | 2.2 TWh |
| #297 | Rolling Hills Generating | Wilkesville, OH | 2.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lost Pines 1 Power Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 7V Solar Ranch | Muldoon, TX | 396.1 GWh | 26.3 mi |
| ABIA Parking Structure | Austin, TX | 3.2 GWh | 24 mi |
| Austin | Austin, TX | 4.1 GWh | 32.2 mi |
| Austin Gas Recovery | Austin, TX | 32.2 GWh | 24.6 mi |
| Bastrop Energy Center | Cedar Creek, TX | 2.9 TWh | 16.6 mi |
| Big Star Solar, LLC (Hybrid) | Rosanky, TX | 287.0 GWh | 17.5 mi |
| East Blackland Solar Project 1 | Manor, TX | 269.3 GWh | 22 mi |
| Fayette Power Project | La Grange, TX | 8.3 TWh | 35 mi |
| Gransolar Texas One, LLC | Thorndale, TX | 86.4 GWh | 32 mi |
| Hal C Weaver Power Plant | Austin, TX | 361.2 GWh | 29.3 mi |
| HEB00591 | Round Rock, TX | 327.0 MWh | 34.5 mi |
| IKEA Round Rock 027 | Round Rock, TX | 1.6 GWh | 37.7 mi |
| Marshall Ford | Austin, TX | 24.0 GWh | 41.5 mi |
| PowerFin Kingsbery | Austin, TX | 3.3 GWh | 26 mi |
| Robert Mueller Energy Center | Austin, TX | 32.2 GWh | 28.2 mi |
| Sand Hill | Austin, TX | 2.1 TWh | 20.8 mi |
| Sim Gideon | Bastrop, TX | 1.0 TWh | 0.2 mi |
| WAL5480 | Round Rock, TX | 259.0 MWh | 33.5 mi |
| Webberville Solar Project | Manor, TX | 56.3 GWh | 15.5 mi |
| Winchester Power Park | Winchester, TX | 51.5 GWh | 18.6 mi |