Driver Solar
TBD, Osceola, AR 72370Plant Summary Information
Driver Solar is ranked #25 out of 97 power plants in Arkansas in terms of total annual net electricity generation.
Driver Solar generated 119.8 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | Driver Solar |
---|---|
Utility Name | Entergy Arkansas LLC |
Location | Mississippi County, AR |
Initial Operation Date | November 2024 |
Last Update | Apr 2025 |
Annual Generation | 246.1 GWh |
Annual Consumption | 839.5 k MMBtu |
Ranked #2,157 out of 12,299 Power Plants Nationwide | |
Ranked #257 out of 6,182 Solar Power Plants Nationwide | |
Ranked #25 out of 97 Arkansas Power Plants | |
Ranked #4 out of 52 Arkansas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Lightsource Renewable Energy Asset Management, LLC (2021 to 2023) Entergy Arkansas LLC (2024 to 2024) |
Map of Driver Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Driver Solar.
Monthly Net Generation for Driver Solar
Driver Solar Details
Summary Information | |
---|---|
Plant Name | Driver Solar (65736) |
Plant Address | TBD, Osceola, AR 72370 |
Utility | Entergy Arkansas LLC (814) |
Latitude, Longitude | 35.64057, -89.96939 |
Generation Dates on File | Aug 2024 to Apr 2025 |
Initial Operation Date | November 2024 |
Annual Generation | 246.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Entergy Arkansas LLC (814) AR |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator AKDR1 Details Operating November 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 150 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2024 |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 312.53 MW |
Thin Film CDTE | No |
Thin Film A Si | No |
Thin Film Other | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Driver Solar Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Driver Solar, LLC | 400 Montgomery Street, 8th Floor, San Francisco, CA 94104 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#247 | Playa Solar 2 | North Las Vegas, NV | 253.5 GWh |
#248 | West of the Pecos Solar | TBD, TX | 252.0 GWh |
#249 | Ivanpah 3 | Nipton, CA | 261.8 GWh |
#250 | Springbok 3 Solar Farm Hybrid | Cantil, CA | 250.8 GWh |
#251 | Porter Solar, LLC (TX) | Krum, TX | 250.4 GWh |
#252 | Nebula Solar | La Feria, TX | 250.0 GWh |
#253 | East Line Solar | Coolidge, AZ | 249.3 GWh |
#254 | Chesapeake Solar Project | Chesapeake, VA | 248.6 GWh |
#255 | Rabbitbrush Solar, LLC | Rosamond, CA | 246.2 GWh |
#256 | Maverick Solar 6, LLC | Desert Center, CA | 238.4 GWh |
#258 | Taylor County Solar | Butler, GA | 245.4 GWh |
#259 | OCI Alamo 7 LLC | Haskell, TX | 245.3 GWh |
#260 | San Pablo Raceway | Lancaster, CA | 243.5 GWh |
#261 | Willow Spring Solar, LLC | Rosamond, CA | 243.5 GWh |
#262 | SR Snipesville II | Denton, GA | 242.2 GWh |
#263 | SR Snipesville III | Denton, GA | 241.4 GWh |
#264 | Oak Trail Solar, LLC | Moyock, NC | 241.1 GWh |
#265 | Alamo 6 | Fort Stockton, TX | 240.8 GWh |
#266 | Robins Air Force Base Solar | Macon, GA | 240.3 GWh |
#267 | Elara Solar | Pearsall, TX | 238.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Driver Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allen | Memphis, TN | 6.7 TWh | 40.4 mi |
Big Cypress Solar, LLC | Crawfordsville, AR | 416.8 GWh | 27.9 mi |
Brownsville Peaking Power | Brownsville, TN | 67.5 GWh | 43.9 mi |
Craighead Electric Solar One | Brookland, AR | 2.2 GWh | 38.8 mi |
Crooked Lake Solar, LLC | Blytheville, AR | 382.2 GWh | 21.6 mi |
Dell Power Station | Dell, AR | 3.9 TWh | 15.6 mi |
Haywood Solar | Brownsville, TN | 5.4 GWh | 38.6 mi |
IKEA Memphis 508 | Cordova, TN | 934.0 MWh | 32.6 mi |
Jonesboro CWL Solar Park | Jonesboro, AR | 22.1 GWh | 36.2 mi |
Kennett | Kennett, MO | 1.8 GWh | 41.2 mi |
Lagoon Creek | Brownsville, TN | 3.5 TWh | 32.2 mi |
Millington Solar Farm | Millington, TN | 97.3 GWh | 21 mi |
Paragould Reciprocating | Paragould, AR | 428.0 MWh | 40.2 mi |
Paragould Solar Farm | Paragould, AR | 3.1 GWh | 39.4 mi |
Paragould Turbine | Paragould, AR | 145.0 MWh | 40.2 mi |
Plum Point Energy Station | Osceola, AR | 3.7 TWh | 2 mi |
SR Canadaville, LLC | Collierville, TN | 36.1 GWh | 42.8 mi |
SR Innovation - NIKE PV | Memphis, TN | 3.4 GWh | 23.5 mi |
West Memphis Solar Station | Crawfordsville, AR | 124.6 GWh | 38.5 mi |
West Tennessee Solar Farm | Stanton, TN | 2.4 GWh | 36.4 mi |