Winchester Power Park
1260 Farm to Market Road 448, Winchester, TX 78945Plant Summary Information
Winchester Power Park is ranked #154 out of 308 natural gas power plants in Texas in terms of total annual net electricity generation.
Winchester Power Park is comprised of 4 generators and generated 8.0 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Winchester Power Park |
|---|---|
| Utility Name | Lower Colorado River Authority |
| Location | Fayette County, TX |
| Initial Operation Date | May 2010 |
| Last Update | Dec 2024 |
| Annual Generation | 51.5 GWh |
| Annual Consumption | 550.1 k MMBtu |
| Ranked #4,113 out of 12,332 Power Plants Nationwide | |
| Ranked #1,071 out of 2,179 Natural Gas Power Plants Nationwide | |
| Ranked #549 out of 814 Texas Power Plants | |
| Ranked #154 out of 308 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Winchester Power Park
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Winchester Power Park.
Monthly Net Generation for Winchester Power Park
Monthly Plant Fuel Consumption for Winchester Power Park
Winchester Power Park Details
| Summary Information | |
|---|---|
| Plant Name | Winchester Power Park (56674) |
| Plant Address | 1260 Farm to Market Road 448, Winchester, TX 78945 |
| Utility | Lower Colorado River Authority (11269) |
| Latitude, Longitude | 30.02547, -96.9945 |
| Generation Dates on File | Apr 2010 to Dec 2024 |
| Initial Operation Date | May 2010 |
| Annual Generation | 51.5 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | ENERGY TRANSFER COMPANY TEXAS PL LTD |
| Natural Gas Storage | No |
Generator CGT1 Details Operating May 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44 MW |
| Winter Capacity | 46 MW |
| Minimum Load | 13 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2010 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CGT2 Details Operating May 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44 MW |
| Winter Capacity | 46 MW |
| Minimum Load | 13 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2010 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CGT3 Details Operating May 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44 MW |
| Winter Capacity | 46 MW |
| Minimum Load | 13 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2010 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CGT4 Details Operating May 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44 MW |
| Winter Capacity | 46 MW |
| Minimum Load | 13 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2010 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Winchester Power Park Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1061 | Brunswick Cellulose | Brunswick, GA | 230.1 GWh |
| #1062 | Hargis-Hebert Electric Generating | Lafayette, LA | 52.7 GWh |
| #1063 | General Chemical | Green River, WY | 212.9 GWh |
| #1064 | Franklin Heating Station | Rochester, MN | 63.2 GWh |
| #1065 | Laredo | Laredo, TX | 52.4 GWh |
| #1066 | Imperial Savannah LP | Port Wentworth, GA | 52.8 GWh |
| #1067 | Amalgamated Sugar LLC Nampa | Nampa, ID | 51.9 GWh |
| #1068 | Copper | El Paso, TX | 51.9 GWh |
| #1069 | Great Bend - Sunflower | Great Bend, KS | 51.9 GWh |
| #1070 | Benndale | Benndale, MS | 51.6 GWh |
| #1072 | TNSG North Plant | Deadhorse, AK | 51.3 GWh |
| #1073 | Greenleaf 2 Power Plant | Yuba City, CA | 51.1 GWh |
| #1074 | Interstate | Springfield, IL | 50.8 GWh |
| #1075 | Nippon Dynawave Packaging Longview WA | Longview, WA | 271.2 GWh |
| #1076 | DeCordova Steam Electric Station | Granbury, TX | 36.9 GWh |
| #1077 | Newington | Newington, NH | 153.4 GWh |
| #1078 | East Campus Steam Plant | University Park, PA | 50.3 GWh |
| #1079 | Wayne County Energy Complex | Goldsboro, NC | 58.3 GWh |
| #1080 | Sylvamo Corporation Eastover Facility | Eastover, SC | 558.8 GWh |
| #1081 | Georgia-Pacific Cedar Springs | Cedar Springs, GA | 468.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Winchester Power Park.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 7V Solar Ranch | Muldoon, TX | 527.3 GWh | 15.8 mi |
| ABIA Parking Structure | Austin, TX | 3.2 GWh | 42.1 mi |
| Austin | Austin, TX | 4.1 GWh | 50.7 mi |
| Austin Gas Recovery | Austin, TX | 32.2 GWh | 43.1 mi |
| Bastrop Energy Center | Cedar Creek, TX | 1.9 TWh | 34.2 mi |
| Big Star Solar, LLC (Hybrid) | Rosanky, TX | 430.0 GWh | 18.9 mi |
| East Blackland Solar Project 1 | Manor, TX | 282.1 GWh | 39.1 mi |
| Fayette Power Project | La Grange, TX | 8.3 TWh | 16.4 mi |
| Gransolar Texas One, LLC | Thorndale, TX | 117.9 GWh | 40.8 mi |
| Hal C Weaver Power Plant | Austin, TX | 361.2 GWh | 47.8 mi |
| HEB00591 | Round Rock, TX | 327.0 MWh | 52.3 mi |
| Lost Pines 1 Power Project | Bastrop, TX | 2.8 TWh | 18.6 mi |
| PowerFin Kingsbery | Austin, TX | 3.3 GWh | 44.5 mi |
| Robert Mueller Energy Center | Austin, TX | 32.2 GWh | 46.8 mi |
| Sand Hill | Austin, TX | 1.9 TWh | 39.1 mi |
| Sim Gideon | Bastrop, TX | 1.0 TWh | 18.5 mi |
| Sky Global Power One | Rock Island, TX | 79.7 GWh | 42.8 mi |
| Stoneridge Solar, LLC | Thorndale, TX | 133.2 GWh | 38.2 mi |
| WAL5480 | Round Rock, TX | 259.0 MWh | 50.9 mi |
| Webberville Solar Project | Manor, TX | 56.3 GWh | 34.1 mi |