Webberville Solar Project
18580 FM 969, Manor, TX 78653Plant Summary Information
Webberville Solar Project is ranked #123 out of 188 solar farms in Texas in terms of total annual net electricity generation.
Webberville Solar Project generated 12.5 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Webberville Solar Project |
---|---|
Utility Name | FRV AE Solar LLC |
Location | Travis County, TX |
Initial Operation Date | December 2011 |
Last Update | Dec 2024 |
Annual Generation | 56.3 GWh |
Annual Consumption | 205.3 k MMBtu |
Ranked #3,833 out of 12,288 Power Plants Nationwide | |
Ranked #835 out of 6,174 Solar Power Plants Nationwide | |
Ranked #500 out of 788 Texas Power Plants | |
Ranked #123 out of 188 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Webberville Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Webberville Solar Project.
Monthly Net Generation for Webberville Solar Project
Webberville Solar Project Details
Summary Information | |
---|---|
Plant Name | Webberville Solar Project (57699) |
Plant Address | 18580 FM 969, Manor, TX 78653 |
Utility | FRV AE Solar LLC (57021) |
Latitude, Longitude | 30.23849, -97.50881 |
Generation Dates on File | Jan 2012 to Dec 2024 |
Initial Operation Date | December 2011 |
Annual Generation | 56.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Austin Energy (1015) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator AES1 Details Operating December 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 30 MW |
Summer Capacity | 30 MW |
Winter Capacity | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2011 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 35 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Webberville Solar Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#825 | Techren Solar IV LLC | Boulder, NV | 58.1 GWh |
#826 | Caden Energix Hickory LLC | Chesapeake, VA | 57.8 GWh |
#827 | Sunray 2 | Daggett, CA | 57.7 GWh |
#828 | Antelope DSR 3 | Lancaster, CA | 57.7 GWh |
#829 | SR McNeal | McNeal, AZ | 55.0 GWh |
#830 | SR Russellville | Olmstead, KY | 57.4 GWh |
#831 | Innovative Solar 47 | Maxton, NC | 57.2 GWh |
#832 | Baxley | Baxley, GA | 56.9 GWh |
#833 | TA-High Desert LLC | Lancaster, CA | 56.8 GWh |
#834 | Peregrine Solar | Gollad, TX | 56.6 GWh |
#836 | Pinal Central Energy Center Hybrid | Casa Grande, AZ | 53.4 GWh |
#837 | Kingbird B Solar, LLC | Rosamond, CA | 55.8 GWh |
#838 | Georges Lake | TBD, FL | 55.8 GWh |
#839 | Cedar Trail | Glen St Mary, FL | 55.8 GWh |
#840 | Apache Solar I | Cochise, AZ | 55.5 GWh |
#841 | Oberon IB | Odessa, TX | 55.4 GWh |
#842 | Mountain View Solar | North Las Vegas, NV | 55.2 GWh |
#843 | Seville 1 | Ocotillo Wells, CA | 54.1 GWh |
#844 | Antelope Big Sky Ranch | Lancaster, CA | 54.0 GWh |
#845 | Barilla Solar | Fort Stockton, TX | 53.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Webberville Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
7V Solar Ranch | Muldoon, TX | 94.6 GWh | 39.6 mi |
ABIA Parking Structure | Austin, TX | 3.2 GWh | 9.8 mi |
Austin | Austin, TX | 4.1 GWh | 16.9 mi |
Austin Gas Recovery | Austin, TX | 32.2 GWh | 9.4 mi |
Bastrop Energy Center | Cedar Creek, TX | 3.3 TWh | 6.9 mi |
Big Star Solar, LLC (Hybrid) | Rosanky, TX | 42.0 GWh | 27.7 mi |
East Blackland Solar Project 1 | Manor, TX | 256.9 GWh | 13 mi |
GFTX BESS | Austin, TX | 12.2 GWh | 6.6 mi |
Gransolar Texas One, LLC | Thorndale, TX | 13.5 GWh | 32.7 mi |
Hal C Weaver Power Plant | Austin, TX | 361.2 GWh | 13.9 mi |
HEB00591 | Round Rock, TX | 327.0 MWh | 21.3 mi |
IKEA Round Rock 027 | Round Rock, TX | 1.6 GWh | 24.5 mi |
Lost Pines 1 Power Project | Bastrop, TX | 2.4 TWh | 15.5 mi |
Marshall Ford | Austin, TX | 24.0 GWh | 26 mi |
PowerFin Kingsbery | Austin, TX | 3.3 GWh | 10.7 mi |
Robert Mueller Energy Center | Austin, TX | 32.2 GWh | 12.7 mi |
Sand Hill | Austin, TX | 2.0 TWh | 6.5 mi |
Sim Gideon | Bastrop, TX | 1.2 TWh | 15.6 mi |
WAL5480 | Round Rock, TX | 259.0 MWh | 21.3 mi |
Winchester Power Park | Winchester, TX | 86.2 GWh | 34.1 mi |