Webberville Solar Project
18580 FM 969, Manor, TX 78653Plant Summary Information
Webberville Solar Project is ranked #171 out of 245 solar farms in Texas in terms of total annual net electricity generation.
Webberville Solar Project generated 11.7 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Webberville Solar Project |
|---|---|
| Utility Name | FRV AE Solar LLC |
| Location | Travis County, TX |
| Initial Operation Date | December 2011 |
| Last Update | Dec 2025 |
| Annual Generation | 56.4 GWh |
| Annual Consumption | 201.6 k MMBtu |
| Ranked #4,050 out of 13,081 Power Plants Nationwide | |
| Ranked #1,069 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #552 out of 852 Texas Power Plants | |
| Ranked #171 out of 245 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Webberville Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Webberville Solar Project.
Monthly Net Generation for Webberville Solar Project
Monthly Plant Fuel Consumption for Webberville Solar Project
Webberville Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Webberville Solar Project (57699) |
| Plant Address | 18580 FM 969, Manor, TX 78653 |
| Utility | FRV AE Solar LLC (57021) |
| Latitude, Longitude | 30.23849, -97.50881 |
| Generation Dates on File | Jan 2012 to Dec 2025 |
| Initial Operation Date | December 2011 |
| Annual Generation | 56.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Austin Energy (1015) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator AES1 Details Operating December 2011
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 30 MW |
| Summer Capacity | 30 MW |
| Winter Capacity | 30 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2011 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 35 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Webberville Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1059 | TA-High Desert LLC | Lancaster, CA | 57.9 GWh |
| #1060 | Prairie Creek Solar | Jacksonville, IL | 57.8 GWh |
| #1061 | Pinal Central Energy Center Hybrid | Casa Grande, AZ | 55.5 GWh |
| #1062 | Caprock Solar 1 LLC | San Jon, NM | 57.5 GWh |
| #1063 | Elm City Solar Facility | Elm City, NC | 57.5 GWh |
| #1064 | Alpaugh 50 | Alpaugh, CA | 57.3 GWh |
| #1065 | Elkhart County Solar Project | Benton Township, IN | 57.1 GWh |
| #1066 | RE Garland A | Rosamond, CA | 56.7 GWh |
| #1067 | Hayhurst New Mexico Solar | Malaga, NM | 56.6 GWh |
| #1068 | SR McNeal | McNeal, AZ | 53.8 GWh |
| #1070 | Caden Energix Hickory LLC | Chesapeake, VA | 56.2 GWh |
| #1071 | Waiawa Solar Power Hybrid | Waipahu, HI | 52.9 GWh |
| #1072 | Caden Energix Endless Caverns, LLC | New Market, VA | 56.1 GWh |
| #1073 | Summer Solar LLC | Lancaster, CA | 55.9 GWh |
| #1074 | Wilmot Energy Center II | Sahuarita, AZ | 52.4 GWh |
| #1075 | Red Horse III | Wilcox, AZ | 55.6 GWh |
| #1076 | Keydet Solar Center | Charles City, VA | 55.6 GWh |
| #1077 | Gaskell West 1 Solar Facility | Lancaster, CA | 55.6 GWh |
| #1078 | Catalina Solar 2, LLC | Rosamond, CA | 55.4 GWh |
| #1079 | Apache Solar I | Cochise, AZ | 55.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Webberville Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ABIA Parking Structure | Austin, TX | 3.1 GWh | 9.8 mi |
| Austin | Austin, TX | 9.7 GWh | 16.9 mi |
| Austin Gas Recovery | Austin, TX | 32.2 GWh | 9.4 mi |
| Bastrop Energy Center | Cedar Creek, TX | 2.2 TWh | 6.9 mi |
| Big Star Solar, LLC (Hybrid) | Rosanky, TX | 416.4 GWh | 27.7 mi |
| East Blackland Solar Project 1 | Manor, TX | 275.9 GWh | 13 mi |
| Gransolar Texas One, LLC | Thorndale, TX | 113.4 GWh | 32.7 mi |
| Hal C Weaver Power Plant | Austin, TX | 357.4 GWh | 13.9 mi |
| HEB00591 | Round Rock, TX | 300.0 MWh | 21.3 mi |
| Lost Pines 1 Power Project | Bastrop, TX | 2.8 TWh | 15.5 mi |
| Marshall Ford | Austin, TX | 45.2 GWh | 26 mi |
| PowerFin Kingsbery | Austin, TX | 3.0 GWh | 10.7 mi |
| Robert Mueller Energy Center | Austin, TX | 30.0 GWh | 12.7 mi |
| RP SCG Texas Solar | Austin, TX | 1.5 GWh | 19.3 mi |
| Sand Hill | Austin, TX | 1.8 TWh | 6.5 mi |
| Sim Gideon | Bastrop, TX | 1.0 TWh | 15.6 mi |
| Stoneridge Solar, LLC | Thorndale, TX | 384.9 GWh | 33 mi |
| Timmerman Power Plant | Maxwell, TX | 207.9 GWh | 30.8 mi |
| WAL5480 | Round Rock, TX | 303.0 MWh | 21.3 mi |
| Winchester Power Park | Winchester, TX | 58.1 GWh | 34.1 mi |