Arroyo Solar Energy Storage Hybrid

TBD, Pueblo Pintado, NM 87013

Plant Summary Information

Arroyo Solar Energy Storage Hybrid is ranked #37 out of 7,209 solar farms nationwide in terms of total annual net electricity generation.

Arroyo Solar Energy Storage Hybrid generated 237.5 GWh during the 3-month period between May 2026 to August 2026.

Plant NameArroyo Solar Energy Storage Hybrid
Utility NameArroyo Solar LLC
LocationMcKinley County, NM
Initial Operation DateJuly 2023
Last Update Aug 2026
Annual Generation 735.5 GWh
Annual Consumption 2.8 M MMBtu
Ranked #984 out of 13,301 Power Plants Nationwide
Ranked #37 out of 7,209 Solar Power Plants Nationwide
Ranked #17 out of 158 New Mexico Power Plants
Ranked #1 out of 102 New Mexico Solar Power Plants
Fuel Types Solar

Map of Arroyo Solar Energy Storage Hybrid

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Arroyo Solar Energy Storage Hybrid.

Create Your Account Today

Monthly Net Generation for Arroyo Solar Energy Storage Hybrid

Monthly Plant Fuel Consumption for Arroyo Solar Energy Storage Hybrid

Arroyo Solar Energy Storage Hybrid Details

Summary Information
Plant NameArroyo Solar Energy Storage Hybrid (63172)
Plant AddressTBD, Pueblo Pintado, NM 87013
UtilityArroyo Solar LLC (62921)
Latitude, Longitude35.97035, -107.56308
Generation Dates on FileJul 2023 to Aug 2026
Initial Operation DateJuly 2023
Annual Generation 735.5 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityPublic Service Company of New Mexico (PNM)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPublic Service Co of NM (15473) NM
Grid Voltage 345.00 kV
Energy StorageYes

Generator ARESS Details Operating July 2023

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
Nameplate Capacity150 MW
Summer Capacity150 MW
Winter Capacity150 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2023
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH600
Maximum Charge Rate150 MW
Maximum Discharge Rate150 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating150
Storage Enclosure TypeCS
ArbitrageP
Direct Support Of Another UnitNo
Support T D AssetNo

Generator ARSOL Details Operating January 2024

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity300 MW
Summer Capacity300 MW
Winter Capacity300 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 2024
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Time From Cold Shutdown To Full Load10M
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity346.98 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Arroyo Solar Energy Storage Hybrid Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#27Daggett 3Daggett, CA818.1 GWh
#28Ash Creek SolarAbbott, TX822.0 GWh
#29McFarland B Solar and StorageDateland, AZ799.3 GWh
#30Solana Generating StationGila Bend, AZ808.2 GWh
#31Red Tailed Hawk Solar LLCEl Campo, TX808.2 GWh
#32Eleven Mile Solar CenterCoolidge, AZ767.3 GWh
#33Sun Streams 4Tonopah, AZ732.3 GWh
#34Solar Star 2Rosamond, CA769.1 GWh
#35Parliament SolarWaller, TX766.0 GWh
#36Cottonwood Bayou SolarLiverpool, TX765.3 GWh
#38Atrisco Solar LLCRio Rancho, NM753.9 GWh
#39Juno Solar ProjectLamesa, TX751.8 GWh
#40Mammoth North SolarKnox, IN751.5 GWh
#41Arica SolarDesert Center, CA722.5 GWh
#42Rexford Solar FarmDucor, CA711.8 GWh
#43BT Hickerson Solar, LLCClifton, TX737.3 GWh
#44Hecate Energy Longhorn Solar LLCJacksboro, TX737.1 GWh
#45Lumina II Solar ProjectSnyder, TX719.6 GWh
#46Copper Mountain Solar 2Boulder City, NV726.0 GWh
#47Texas Solar Nova 1Spur, TX725.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Arroyo Solar Energy Storage Hybrid.

Plant NamePlant LocationAnnual GenerationDistance
Abiquiu DamAbiquiu, NM15.7 GWh66.3 mi
ASG-2 Community SolarRio Rancho, NM165.0 MWh65.6 mi
Bluewater CDEC 1Bluewater, NM6.6 GWh54.9 mi
BluffviewFarmington, NM276.1 GWh63.1 mi
CibolaSeboyeta, NM19.5 GWh56.1 mi
Cuba 2.5ac, LLCCuba, NM5.8 GWh34.7 mi
El Vado DamTierra Amarilla, NM4.4 GWh63.2 mi
Encino Solar Energy CenterRio Rancho Estates, NM130.5 GWh58.1 mi
Escalante (NM)Grants, NM518.1 GWh48.5 mi
Grants CDEC 2Grants, NM11.5 GWh59.2 mi
Jicarilla Solar 1 LLCDulce, NM118.5 GWh28.7 mi
Jicarilla Solar 2Dulce, NM129.5 GWh24.9 mi
Navajo DamFarmington, NM88.3 GWh57.8 mi
NMRD Data Center III, LLCRio Ranchero, NM129.3 GWh57.4 mi
Quail Ranch Solar and BESSRio Rancho, NM218.4 GWh66.4 mi
Red Mesa Wind LLCSeboyeta, NM163.2 GWh49.5 mi
Route 66 Energy Center, LLCSan Fidel, NM131.9 GWh60.3 mi
Sandoval Solar Energy CenterRio Rancho, NM15.7 GWh63.5 mi
Shallow BasketDulce, NM381.6 GWh24 mi
TAGRio Rancho, NM370.1 GWh62.3 mi