Arroyo Solar Energy Storage Hybrid
TBD, Pueblo Pintado, NM 87013Plant Summary Information
Arroyo Solar Energy Storage Hybrid is ranked #36 out of 6,410 solar farms nationwide in terms of total annual net electricity generation.
Arroyo Solar Energy Storage Hybrid generated 174.7 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Arroyo Solar Energy Storage Hybrid |
|---|---|
| Utility Name | Arroyo Solar LLC |
| Location | McKinley County, NM |
| Initial Operation Date | July 2023 |
| Last Update | Oct 2025 |
| Annual Generation | 680.9 GWh |
| Annual Consumption | 2.6 M MMBtu |
| Ranked #1,025 out of 12,553 Power Plants Nationwide | |
| Ranked #36 out of 6,410 Solar Power Plants Nationwide | |
| Ranked #15 out of 140 New Mexico Power Plants | |
| Ranked #2 out of 87 New Mexico Solar Power Plants | |
| Fuel Types | Solar |
Map of Arroyo Solar Energy Storage Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Arroyo Solar Energy Storage Hybrid.
Monthly Net Generation for Arroyo Solar Energy Storage Hybrid
Arroyo Solar Energy Storage Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Arroyo Solar Energy Storage Hybrid (63172) |
| Plant Address | TBD, Pueblo Pintado, NM 87013 |
| Utility | Arroyo Solar LLC (62921) |
| Latitude, Longitude | 35.97035, -107.56308 |
| Generation Dates on File | Jul 2023 to Oct 2025 |
| Initial Operation Date | July 2023 |
| Annual Generation | 680.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Public Service Company of New Mexico (PNM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Public Service Co of NM (15473) NM |
| Grid Voltage | 345.00 kV |
| Energy Storage | Yes |
Generator ARESS Details Operating July 2023
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 150 MW |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 600 |
|---|---|
| Maximum Charge Rate | 150 MW |
| Maximum Discharge Rate | 150 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 150 |
| Storage Enclosure Type | CS |
| Arbitrage | P |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Generator ARSOL Details Operating January 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 300 MW |
| Summer Capacity | 300 MW |
| Winter Capacity | 300 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 346.98 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Arroyo Solar Energy Storage Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #26 | Dunns Bridge II Solar | San Pierre, IN | 737.7 GWh |
| #27 | Red Tailed Hawk Solar LLC | Pierce, TX | 750.5 GWh |
| #28 | Five Wells Solar Center - Hybrid | Rogers, TX | 724.6 GWh |
| #29 | Mammoth North Solar | Knox, IN | 733.9 GWh |
| #30 | Solar Star 2 | Rosamond, CA | 721.9 GWh |
| #31 | Atrisco Solar LLC | Rio Rancho, NM | 711.8 GWh |
| #32 | Athos Solar Project | Desert Center, CA | 707.0 GWh |
| #33 | Solar Blue | Lemoore, CA | 666.8 GWh |
| #34 | Lumina II Solar Project | Snyder, TX | 702.7 GWh |
| #35 | Texas Solar Nova 1 | Spur, TX | 699.7 GWh |
| #37 | Neptune Energy Center Hybrid | Boone, CO | 681.0 GWh |
| #38 | Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 676.3 GWh |
| #39 | Copper Mountain Solar 5, LLC | Boulder City, NV | 690.3 GWh |
| #40 | Lumina Solar Project | Snyder, TX | 682.4 GWh |
| #41 | Aquamarine | Lemoore, CA | 683.9 GWh |
| #42 | Mount Signal Solar Farm V | Calexico, CA | 675.3 GWh |
| #43 | Silver State Solar Power South | Primm Valley, NV | 673.2 GWh |
| #44 | McCoy Solar Energy Project Hybrid | Blythe, CA | 646.7 GWh |
| #45 | Prospero Solar II | Andrews, TX | 667.3 GWh |
| #46 | Desert Sunlight 300, LLC | Desert Center, CA | 666.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Arroyo Solar Energy Storage Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Abiquiu Dam | Abiquiu, NM | 24.3 GWh | 66.3 mi |
| Atrisco Solar LLC | Rio Rancho, NM | 711.8 GWh | 66.9 mi |
| Bluewater CDEC 1 | Bluewater, NM | 6.6 GWh | 54.9 mi |
| Bluffview | Farmington, NM | 404.3 GWh | 63.1 mi |
| Cibola | Seboyeta, NM | 19.2 GWh | 56.1 mi |
| City of Rio Rancho WWTP | Rio Rancho, NM | 2.7 GWh | 69.2 mi |
| Cuba 2.5ac, LLC | Cuba, NM | 5.9 GWh | 34.7 mi |
| Encino Solar Energy Center | Rio Rancho Estates, NM | 143.5 GWh | 58.1 mi |
| Escalante (NM) | Grants, NM | 527.1 GWh | 48.5 mi |
| Grants CDEC 2 | Grants, NM | 12.1 GWh | 59.2 mi |
| Jicarilla Solar 1 LLC | Dulce, NM | 107.1 GWh | 28.7 mi |
| Jicarilla Solar 2 | Dulce, NM | 124.7 GWh | 24.9 mi |
| Navajo Dam | Farmington, NM | 72.0 GWh | 57.8 mi |
| NMRD Data Center III, LLC | Rio Ranchero, NM | 136.3 GWh | 57.4 mi |
| Red Mesa Wind LLC | Seboyeta, NM | 162.1 GWh | 49.5 mi |
| Route 66 Energy Center, LLC | San Fidel, NM | 130.0 GWh | 60.3 mi |
| Sandoval Solar Energy Center | Rio Rancho, NM | 15.6 GWh | 63.5 mi |
| Shallow Basket | Dulce, NM | 97.2 GWh | 24 mi |
| Sue Cleveland High School | Rio Rancho, NM | 2.3 GWh | 68.2 mi |
| TAG | Rio Rancho, NM | 51.8 GWh | 62.3 mi |