Waco Solar
125 LCR 132,, Mt Calm, TX 76673Plant Summary Information
Waco Solar is ranked #13 out of 6,487 solar farms nationwide in terms of total annual net electricity generation.
Waco Solar generated 162.4 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Waco Solar |
|---|---|
| Utility Name | Waco Solar, LLC |
| Location | Limestone County, TX |
| Initial Operation Date | March 2024 |
| Last Update | Feb 2026 |
| Annual Generation | 915.1 GWh |
| Annual Consumption | 3.3 M MMBtu |
| Ranked #788 out of 12,637 Power Plants Nationwide | |
| Ranked #13 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #133 out of 820 Texas Power Plants | |
| Ranked #9 out of 219 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Waco Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Waco Solar.
Monthly Net Generation for Waco Solar
Monthly Plant Fuel Consumption for Waco Solar
Waco Solar Details
| Summary Information | |
|---|---|
| Plant Name | Waco Solar (65762) |
| Plant Address | 125 LCR 132,, Mt Calm, TX 76673 |
| Utility | Waco Solar, LLC (65014) |
| Latitude, Longitude | 31.71042, -96.81868 |
| Generation Dates on File | Mar 2024 to Feb 2026 |
| Initial Operation Date | March 2024 |
| Annual Generation | 915.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Lone Star Transmission () TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator SWACO Details Operating March 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 400 MW |
| Summer Capacity | 400 MW |
| Winter Capacity | 400 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Other Solar Technology | No |
| Azimuth Angle | 180 |
| DC Net Capacity | 544.54 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Waco Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3 | Hecate Energy Frye Solar LLC | Kress, TX | 1.3 TWh |
| #4 | Fox Squirrel Solar | Mt Sterling, OH | 1.2 TWh |
| #5 | Sonoran Solar Energy | Buckeye, AZ | 1.1 TWh |
| #6 | Roseland Solar Project, LLC | Riesel, TX | 1.1 TWh |
| #7 | Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh |
| #8 | Topaz Solar Farm | Santa Margarita, CA | 1.0 TWh |
| #9 | 2W Permian Solar Project Hybrid | Andrews, TX | 1.0 TWh |
| #10 | Aktina Solar | El Campo, TX | 1.0 TWh |
| #11 | Mockingbird Solar Center | Brookston, TX | 943.5 GWh |
| #12 | Old 300 Solar Center, LLC | Needville, TX | 939.4 GWh |
| #14 | Eagle Shadow Mountain Solar Farm | Moapa, NV | 893.1 GWh |
| #15 | Solar Star 1 | Rosamond, CA | 888.2 GWh |
| #16 | Double Back Diamond | Virden, IL | 887.5 GWh |
| #17 | Daggett 3 | Daggett, CA | 859.8 GWh |
| #18 | Solana Generating Station | Gila Bend, AZ | 853.4 GWh |
| #19 | Desert Quartzite | Blythe, CA | 830.4 GWh |
| #20 | Greasewood II LLC | Girvin, TX | 846.1 GWh |
| #21 | Eleven Mile Solar Center | Coolidge, AZ | 791.1 GWh |
| #22 | Dunns Bridge II Solar | San Pierre, IN | 811.1 GWh |
| #23 | Arica Solar | Desert Center, CA | 779.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Waco Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AbbVie Waco | Waco, TX | 811.0 MWh | 27.2 mi |
| Ash Creek Solar | Abbott, TX | 532.2 GWh | 18.2 mi |
| BPL Crown Solar LLC | Chilton, TX | 214.7 GWh | 29.6 mi |
| BPL Sol Solar LLC | Chilton, TX | 211.9 GWh | 29.6 mi |
| Briar Creek Solar 1 | Corsicana, TX | 217.6 GWh | 28.2 mi |
| Copperhead Solar, LLC | Riesel, TX | 292.7 GWh | 18.2 mi |
| Griffin Solar | Robinson, TX | 9.2 GWh | 25 mi |
| Hubbard Wind | Mt Calm, TX | 931.4 GWh | 4.5 mi |
| Limestone Wind Project | Coolidge, TX | 1.0 TWh | 15.1 mi |
| Markum Solar Farm | Valley Mills, TX | 371.9 GWh | 32.7 mi |
| Marlin Solar | Marlin, TX | 9.9 GWh | 29.5 mi |
| Pisgah Ridge Solar, LLC | Richland, TX | 509.0 GWh | 24.3 mi |
| Pitts Dudik Solar | Hubbard, TX | 102.0 GWh | 13.1 mi |
| Prairie Hill Wind Project | Mart, TX | 94.0 GWh | 12.2 mi |
| Roseland Solar Project, LLC | Riesel, TX | 1.1 TWh | 17.2 mi |
| Sandy Creek Energy Station | Riesel, TX | 3.2 TWh | 18.2 mi |
| Sun Valley Solar Project | Abbott, TX | 563.7 GWh | 15.9 mi |
| Thad Hill Energy Center | Clifton, TX | 3.8 TWh | 33.3 mi |
| True North Solar, LLC | Otto, TX | 567.5 GWh | 16.8 mi |
| Whitney | Clifton, TX | 69.4 GWh | 34 mi |