Juno Solar Project
136 County Road 116, Lamesa, TX 79331Plant Summary Information
Juno Solar Project is ranked #16 out of 6,182 solar farms nationwide in terms of total annual net electricity generation.
Juno Solar Project generated 162.5 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | Juno Solar Project |
---|---|
Utility Name | SE Juno, LLC |
Location | Borden County, TX |
Initial Operation Date | June 2021 |
Last Update | Apr 2025 |
Annual Generation | 786.7 GWh |
Annual Consumption | 2.9 M MMBtu |
Ranked #900 out of 12,299 Power Plants Nationwide | |
Ranked #16 out of 6,182 Solar Power Plants Nationwide | |
Ranked #156 out of 792 Texas Power Plants | |
Ranked #8 out of 190 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Juno Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Juno Solar Project.
Monthly Net Generation for Juno Solar Project
Juno Solar Project Details
Summary Information | |
---|---|
Plant Name | Juno Solar Project (63328) |
Plant Address | 136 County Road 116, Lamesa, TX 79331 |
Utility | SE Juno, LLC (63100) |
Latitude, Longitude | 32.77289, -101.39102 |
Generation Dates on File | Jan 2021 to Apr 2025 |
Initial Operation Date | June 2021 |
Annual Generation | 786.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Wind Energy Transmission Texas LLC (60066) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator JUNO1 Details Operating June 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 162.1 MW |
Summer Capacity | 162.1 MW |
Winter Capacity | 162.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 60 |
Tilt Angle | 60 |
DC Net Capacity | 219 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator IPJNO Details Operating August 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 143.5 MW |
Summer Capacity | 143.5 MW |
Winter Capacity | 143.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 60 |
Tilt Angle | 60 |
DC Net Capacity | 203.5 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Juno Solar Project Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#6 | Roseland Solar Project, LLC | Riesel, TX | 976.5 GWh |
#7 | 2W Permian Solar Project Hybrid | Andrews, TX | 957.4 GWh |
#8 | Waco Solar | Mt Calm, TX | 939.0 GWh |
#9 | Eagle Shadow Mountain Solar Farm | Moapa, NV | 928.8 GWh |
#10 | Aktina Solar | El Campo, TX | 907.4 GWh |
#11 | Daggett 3 | Daggett, CA | 884.5 GWh |
#12 | Solar Star 1 | Rosamond, CA | 891.8 GWh |
#13 | Old 300 Solar Center, LLC | Needville, TX | 877.4 GWh |
#14 | Fox Squirrel Solar | Mt Sterling, OH | 864.8 GWh |
#15 | Solana Generating Station | Gila Bend, AZ | 838.8 GWh |
#17 | Prospero Solar | Andrews, TX | 769.6 GWh |
#18 | Mockingbird Solar Center | Brookston, TX | 755.3 GWh |
#19 | Slate Hybrid | Stratford, CA | 700.2 GWh |
#20 | Solar Star 2 | Rosamond, CA | 724.3 GWh |
#21 | Five Wells Solar Center - Hybrid | Rogers, TX | 734.3 GWh |
#22 | Texas Solar Nova 1 | Spur, TX | 709.4 GWh |
#23 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 688.9 GWh |
#24 | Arica Solar | Desert Center, CA | 669.9 GWh |
#25 | Copper Mountain Solar 5, LLC | Boulder City, NV | 693.5 GWh |
#26 | Eleven Mile Solar Center | Coolidge, AZ | 655.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Juno Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brazos Wind Farm | Fluvanna, TX | 658.7 GWh | 18.6 mi |
Bull Creek Wind | O'Donnell, TX | 265.2 GWh | 15.3 mi |
C R Wing Cogen Plant | Big Spring, TX | 99.6 GWh | 34.6 mi |
Canyon Wind Project, LLC | Scurry, TX | 1.1 TWh | 24.3 mi |
Coyote Wind LLC | Snyder, TX | 636.9 GWh | 30.9 mi |
Dermott Wind | Snyder, TX | 905.1 GWh | 25 mi |
EG178 Facility | Snyder, TX | 713.1 GWh | 25.4 mi |
ENGIE Long Draw Solar LLC | Gail, TX | 513.2 GWh | 13.6 mi |
Fluvanna | Fluvanna, TX | 526.8 GWh | 18.1 mi |
Gopher Creek Wind Farm | Fluvanna, TX | 577.7 GWh | 12.7 mi |
Lamesa II | Lamesa, TX | 124.3 GWh | 29 mi |
Lamesa Solar | Lamesa, TX | 212.1 GWh | 31.4 mi |
Lumina Solar Project | Snyder, TX | 673.4 GWh | 25.3 mi |
Mesquite Creek Wind | Lamesa, TX | 500.5 GWh | 21 mi |
Post Wind Farm LP | Fluvanna, TX | 314.8 GWh | 14.5 mi |
Scurry County Wind II | Snyder, TX | 164.9 GWh | 34.9 mi |
Scurry County Wind LP | Snyder, TX | 205.4 GWh | 23.3 mi |
Stephens Ranch Wind Energy LLC | O'Donnell, TX | 1.0 TWh | 18.3 mi |
Tahoka Wind | Tahoka, TX | 1.2 TWh | 31 mi |
WAL1272 | Snyder, TX | 176.0 MWh | 28.1 mi |