Juno Solar Project
136 County Road 116, Lamesa, TX 79331Plant Summary Information
Juno Solar Project is ranked #11 out of 5,634 solar farms nationwide in terms of total annual net electricity generation.
Juno Solar Project generated 257.8 GWh during the 3-month period between April 2024 to July 2024.
Plant Name | Juno Solar Project |
---|---|
Utility Name | SE Juno, LLC |
Location | Borden County, TX |
Initial Operation Date | June 2021 |
Last Update | Jul 2024 |
Annual Generation | 793.7 GWh |
Annual Consumption | 3.0 M MMBtu |
Ranked #882 out of 11,825 Power Plants Nationwide | |
Ranked #11 out of 5,634 Solar Power Plants Nationwide | |
Ranked #150 out of 746 Texas Power Plants | |
Ranked #4 out of 158 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Juno Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Juno Solar Project.
Monthly Net Generation for Juno Solar Project
Juno Solar Project Details
Summary Information | |
---|---|
Plant Name | Juno Solar Project (63328) |
Plant Address | 136 County Road 116, Lamesa, TX 79331 |
Utility | SE Juno, LLC (63100) |
Latitude, Longitude | 32.77289, -101.39102 |
Generation Dates on File | Jan 2021 to Jul 2024 |
Initial Operation Date | June 2021 |
Annual Generation | 793.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Wind Energy Transmission Texas LLC (60066) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator JUNO1 Details Operating June 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 159 MW |
Summer Capacity | 159 MW |
Winter Capacity | 159 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 60 |
Tilt Angle | 60 |
DC Net Capacity | 219 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator IPJNO Details Operating August 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 143.5 MW |
Summer Capacity | 143.5 MW |
Winter Capacity | 143.5 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | September 2023 |
Status | Operating |
---|---|
First Operation Date | August 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 60 |
Tilt Angle | 60 |
DC Net Capacity | 203.5 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Juno Solar Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Topaz Solar Farm | Santa Margarita, CA | 1.1 TWh |
#2 | Roadrunner, LLC Hybrid | McCamey, TX | 987.2 GWh |
#3 | 2W Permian Solar Project Hybrid | Andrews, TX | 907.3 GWh |
#4 | Eagle Shadow Mountain Solar Farm | Moapa River Indian Re, NV | 900.7 GWh |
#5 | Solar Star 1 | Rosamond, CA | 861.3 GWh |
#6 | Roseland Solar Project, LLC | Riesel, TX | 851.2 GWh |
#7 | Sonoran Solar Energy | Buckeye, AZ | 774.8 GWh |
#8 | Daggett 3 | Daggett, CA | 797.7 GWh |
#9 | Solana Generating Station | Gila Bend, AZ | 796.5 GWh |
#10 | Gemini Solar | Unincorporated, NV | 778.7 GWh |
#12 | Aktina Solar | El Campo, TX | 793.4 GWh |
#13 | Prospero Solar | Andrews, TX | 748.1 GWh |
#14 | Neptune Energy Center Hybrid | Boone, CO | 710.5 GWh |
#15 | IP Radian, LLC | Brookesmith, TX | 704.1 GWh |
#16 | Solar Star 2 | Rosamond, CA | 687.2 GWh |
#17 | Copper Mountain Solar 5, LLC | Boulder City, NV | 679.0 GWh |
#18 | Prospero Solar II | Andrews, TX | 676.3 GWh |
#19 | Agua Caliente Solar Project | Dateland, AZ | 672.9 GWh |
#20 | Desert Sunlight 300, LLC | Desert Center, CA | 659.4 GWh |
#21 | Slate Hybrid | Stratford, CA | 630.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Juno Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brazos Wind Farm | Fluvanna, TX | 82.9 GWh | 18.6 mi |
Bull Creek Wind | O'Donnell, TX | 269.0 GWh | 15.3 mi |
C R Wing Cogen Plant | Big Spring, TX | 99.6 GWh | 34.6 mi |
Canyon Wind Project, LLC | Scurry, TX | 618.5 GWh | 24.3 mi |
Coyote Wind LLC | Snyder, TX | 629.3 GWh | 30.9 mi |
Dermott Wind | Snyder, TX | 901.9 GWh | 25 mi |
EG178 Facility | Snyder, TX | 686.9 GWh | 25.4 mi |
ENGIE Long Draw Solar LLC | Gail, TX | 513.0 GWh | 13.6 mi |
Fluvanna | Fluvanna, TX | 523.3 GWh | 18.1 mi |
Gopher Creek Wind Farm | Fluvanna, TX | 600.3 GWh | 12.7 mi |
Lamesa II | Lamesa, TX | 120.5 GWh | 29 mi |
Lamesa Solar | Lamesa, TX | 192.8 GWh | 31.4 mi |
Lumina Solar Project | Snyder, TX | 430.9 GWh | 25.3 mi |
Mesquite Creek Wind | Lamesa, TX | 380.5 GWh | 21 mi |
Post Wind Farm LP | Fluvanna, TX | 311.7 GWh | 14.5 mi |
Scurry County Wind II | Snyder, TX | 201.1 GWh | 34.9 mi |
Scurry County Wind LP | Snyder, TX | 233.6 GWh | 23.3 mi |
Stephens Ranch Wind Energy LLC | O'Donnell, TX | 1.1 TWh | 18.3 mi |
Tahoka Wind | Tahoka, TX | 1.1 TWh | 31 mi |
WAL1272 | Snyder, TX | 287.0 MWh | 28.1 mi |