Mesquite Wind Power LLC is ranked #172 out of 231 wind farms in Texas in terms of total annual net electricity generation.
Mesquite Wind Power LLC generated 76.8 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Mesquite Wind Power LLC |
|---|---|
| Utility Name | Mesquite Wind LLC |
| Location | Shackelford County, TX |
| Initial Operation Date | November 2007 |
| Last Update | Aug 2026 |
| Annual Generation | 332.7 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,918 out of 13,301 Power Plants Nationwide | |
| Ranked #574 out of 1,377 Wind Power Plants Nationwide | |
| Ranked #403 out of 861 Texas Power Plants | |
| Ranked #172 out of 231 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Lone Star Wind Farm LLC (2013 to 2014) Mesquite Wind LLC (2015 to 2025) |
Map of Mesquite Wind Power LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mesquite Wind Power LLC.
Monthly Net Generation for Mesquite Wind Power LLC
Monthly Plant Fuel Consumption for Mesquite Wind Power LLC
Mesquite Wind Power LLC Details
| Summary Information | |
|---|---|
| Plant Name | Mesquite Wind Power LLC (56395) |
| Plant Address | 299 FM 604, Abilene, TX 79601 |
| Utility | Mesquite Wind LLC (54759) |
| Latitude, Longitude | 32.6256, -99.4928 |
| Generation Dates on File | Nov 2007 to Aug 2026 |
| Initial Operation Date | November 2007 |
| Annual Generation | 332.7 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 06-64 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator 1 Details Operating November 2007
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2007 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 97 |
| Turbine Details | |
| Number Of Turbines | 97 |
|---|---|
| Predominant Turbine Manufacturer | Gamesa |
| Predominant Turbine Model Number | G87-2.0 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 255 |
Mesquite Wind Power LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #564 | Penascal II Wind Project LLC | Sarita, TX | 339.1 GWh |
| #565 | Hoopeston Wind LLC | Rossville, IL | 337.7 GWh |
| #566 | Buffalo Gap 3 Wind Farm | Nolan, TX | 337.7 GWh |
| #567 | MinnDakota Wind LLC | Ivanhoe, MN | 337.3 GWh |
| #568 | Goshen Phase II | Idaho Falls, ID | 337.1 GWh |
| #569 | Bishop Hill II Wind Farm | Cambridge, IL | 334.4 GWh |
| #570 | Gratiot Farms Wind Project | Carson City, MI | 334.1 GWh |
| #571 | Bent Tree Wind Farm Phase 1 | Hartland, MN | 334.1 GWh |
| #572 | Duran Mesa LLC | Duran, NM | 334.0 GWh |
| #573 | Mower County Wind Energy Center | Grand Meadow, MN | 334.0 GWh |
| #575 | Turkey Track Wind Energy LLC | Blackwell, TX | 331.4 GWh |
| #576 | Glacier Hills | Cambria, WI | 330.9 GWh |
| #577 | Michigan Wind 2 | Minden City, MI | 329.1 GWh |
| #578 | Oakfield Wind Project | City of Oakfield, ME | 328.7 GWh |
| #579 | Loraine Windpark Project LLC | Loraine, TX | 327.9 GWh |
| #580 | Cloud County Wind Farm | Concordia, KS | 326.1 GWh |
| #581 | Minco Wind I, LLC | Minco, OK | 325.5 GWh |
| #582 | Anacacho Wind Farm, LLC | Brackettville, TX | 324.3 GWh |
| #583 | Sac County Wind, LLC | Sac City, IA | 324.3 GWh |
| #584 | Minco Wind II, LLC | Minco, OK | 323.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mesquite Wind Power LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ANSON Solar Center, LLC | Anson, TX | 480.8 GWh | 27.8 mi |
| Azure Sky Solar | Haskell, TX | 496.9 GWh | 28.3 mi |
| Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.3 TWh | 39.8 mi |
| BMP Wind (TX) | Baird, TX | 998.6 GWh | 26 mi |
| Buffalo Gap Wind Farm | Merkel, TX | 158.7 GWh | 39.6 mi |
| Callahan Divide Wind Energy Center | Tusocola, TX | 422.0 GWh | 38 mi |
| Century Oak Wind Project, LLC | Cisco, TX | 559.3 GWh | 23.7 mi |
| Hackberry Wind Farm | Albany, TX | 228.4 GWh | 10.7 mi |
| HEB00070 | Abilene, TX | 255.0 MWh | 20.4 mi |
| Inertia Wind Project | Haskell, TX | 1.3 TWh | 39.2 mi |
| King Creek Wind Farm 2, LLC | Throckmorton, TX | 707.5 GWh | 38.9 mi |
| Millers Branch Solar | Haskell, TX | 404.8 GWh | 41.5 mi |
| OCI Alamo 7 LLC | Haskell, TX | 231.6 GWh | 28.8 mi |
| Post Oak Wind LLC | Abilene, TX | 375.9 GWh | 12.2 mi |
| Ranchland Wind Project I | Cisco, TX | 455.4 GWh | 29.1 mi |
| Ranchland Wind Project II | Cisco, TX | 528.5 GWh | 29.1 mi |
| Roadrunner Wind Farm | Cisco, TX | 996.9 GWh | 25.9 mi |
| Sequoia 1 | Cisco, TX | 703.0 GWh | 23.4 mi |
| South Trent Wind Farm | Sweetwater, TX | 272.3 GWh | 40 mi |
| WAL536 | Abilene, TX | 423.0 MWh | 15.6 mi |