Brazoria County Solar Project (Danciger)
2338 CR 772, Damon, TX 77430Plant Summary Information
Brazoria County Solar Project (Danciger) is ranked #57 out of 215 solar farms in Texas in terms of total annual net electricity generation.
Brazoria County Solar Project (Danciger) generated 85.4 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Brazoria County Solar Project (Danciger) |
|---|---|
| Utility Name | Brazoria County Solar Project, LLC |
| Location | Brazoria County, TX |
| Initial Operation Date | July 2022 |
| Last Update | Dec 2025 |
| Annual Generation | 422.9 GWh |
| Annual Consumption | 1.5 M MMBtu |
| Ranked #1,531 out of 12,613 Power Plants Nationwide | |
| Ranked #147 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #307 out of 816 Texas Power Plants | |
| Ranked #57 out of 215 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Brazoria County Solar Project (2022 to 2023) Brazoria County Solar Project, LLC (2024 to 2024) |
Map of Brazoria County Solar Project (Danciger)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brazoria County Solar Project (Danciger).
Monthly Net Generation for Brazoria County Solar Project (Danciger)
Monthly Plant Fuel Consumption for Brazoria County Solar Project (Danciger)
Brazoria County Solar Project (Danciger) Details
| Summary Information | |
|---|---|
| Plant Name | Brazoria County Solar Project (Danciger) (66046) |
| Plant Address | 2338 CR 772, Damon, TX 77430 |
| Utility | Brazoria County Solar Project, LLC (65221) |
| Latitude, Longitude | 29.1779, -95.7612 |
| Generation Dates on File | Oct 2022 to Dec 2025 |
| Initial Operation Date | July 2022 |
| Annual Generation | 422.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 22-86-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator BRZ01 Details Operating July 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DAG_ALL |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DAG_ALL |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 262.5 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Brazoria County Solar Project (Danciger) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #137 | Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh |
| #138 | Mesquite Solar 3, LLC | Tonopah, AZ | 443.4 GWh |
| #139 | Tres Bahias | Port Lavaca, TX | 438.7 GWh |
| #140 | Estonian Solar Project, LLC | Cooper, TX | 429.6 GWh |
| #141 | Pleinmont Solar 2 | Spotsylvania, VA | 437.1 GWh |
| #142 | Hickory Park Solar Hybrid | Camilla, GA | 431.4 GWh |
| #143 | AP Sunray LLC | Knippa, TX | 429.9 GWh |
| #144 | Muscle Shoals | Cherokee, AL | 426.6 GWh |
| #145 | Big Cypress Solar, LLC | Crawfordsville, AR | 426.3 GWh |
| #146 | Chaparral Springs | Rosamond, CA | 413.9 GWh |
| #148 | Brazoria West | Damon, TX | 422.6 GWh |
| #149 | Pearl River Solar Park LLC | Morton, MS | 418.9 GWh |
| #150 | Golden Triangle | Lowndes, MS | 411.8 GWh |
| #151 | Sherco Solar I | Clear Lake, MN | 418.6 GWh |
| #152 | Cutlass Solar II | Richmond, TX | 417.8 GWh |
| #153 | Huck Finn Renewable Energy Center | Vandalia, MO | 417.1 GWh |
| #154 | TS Power Plant | Battle Mountain, NV | 1.7 TWh |
| #155 | Sun Streams, LLC | Arlington, AZ | 411.7 GWh |
| #156 | Sandrini Solar 200 | Mettler, CA | 411.3 GWh |
| #157 | Oak Ridge Solar | Oak Ridge, LA | 409.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brazoria County Solar Project (Danciger).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Brazoria West | Damon, TX | 422.6 GWh | 6 mi |
| Cascade Solar (TX) | Wharton, TX | 17.3 GWh | 15.9 mi |
| Colorado Bend Energy Center | Wharton, TX | 2.2 TWh | 20 mi |
| Colorado Bend II | Wharton, TX | 6.1 TWh | 19.9 mi |
| Cutlass Solar 1 LLC | Richmond, TX | 169.0 GWh | 16.1 mi |
| Cutlass Solar II | Richmond, TX | 417.8 GWh | 14.7 mi |
| Fighting Jays Solar Project | Needville, TX | 454.2 GWh | 12.5 mi |
| HEB00292 | Bay City, TX | 246.0 MWh | 18 mi |
| Jack Fusco Energy Center | Thompsons, TX | 3.6 TWh | 22 mi |
| Lane City Wind | Lane City, TX | 110.7 GWh | 16.3 mi |
| Long Point Solar | Damon, TX | 429.0 MWh | 6.9 mi |
| Mark One Power Station | Angleton, TX | 352.7 GWh | 20.2 mi |
| Newgulf Cogen | NewGulf, TX | 12.7 GWh | 10.2 mi |
| Old 300 Solar Center, LLC | Needville, TX | 901.6 GWh | 11.4 mi |
| Petra Nova Carbon Capture Cogen | Thompsons, TX | 200.8 GWh | 21.9 mi |
| Peyton Creek Wind Farm II | Bay City, TX | 302.8 GWh | 20.4 mi |
| Prairie Switch Wind LLC | El Campo, TX | 292.1 GWh | 20.7 mi |
| Second Division Solar | West Columbia, TX | 190.8 GWh | 1.3 mi |
| Sweeny Cogen Facility | Old Ocean, TX | 3.3 TWh | 7.3 mi |
| Wagyu | Damon, TX | 235.4 GWh | 7.6 mi |