Brazoria County Solar Project (Danciger)
2338 CR 772, Damon, TX 77430Plant Summary Information
Brazoria County Solar Project (Danciger) is ranked #56 out of 204 solar farms in Texas in terms of total annual net electricity generation.
Brazoria County Solar Project (Danciger) generated 120.5 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Brazoria County Solar Project (Danciger) |
|---|---|
| Utility Name | Brazoria County Solar Project, LLC |
| Location | Brazoria County, TX |
| Initial Operation Date | July 2022 |
| Last Update | Oct 2025 |
| Annual Generation | 419.3 GWh |
| Annual Consumption | 1.6 M MMBtu |
| Ranked #1,531 out of 12,553 Power Plants Nationwide | |
| Ranked #148 out of 6,410 Solar Power Plants Nationwide | |
| Ranked #306 out of 804 Texas Power Plants | |
| Ranked #56 out of 204 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Brazoria County Solar Project (2022 to 2023) Brazoria County Solar Project, LLC (2024 to 2024) |
Map of Brazoria County Solar Project (Danciger)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brazoria County Solar Project (Danciger).
Monthly Net Generation for Brazoria County Solar Project (Danciger)
Brazoria County Solar Project (Danciger) Details
| Summary Information | |
|---|---|
| Plant Name | Brazoria County Solar Project (Danciger) (66046) |
| Plant Address | 2338 CR 772, Damon, TX 77430 |
| Utility | Brazoria County Solar Project, LLC (65221) |
| Latitude, Longitude | 29.1779, -95.7612 |
| Generation Dates on File | Oct 2022 to Oct 2025 |
| Initial Operation Date | July 2022 |
| Annual Generation | 419.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 22-86-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator BRZ01 Details Operating July 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DAG_ALL |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DAG_ALL |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 262.5 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Brazoria County Solar Project (Danciger) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #138 | Fighting Jays Solar Project | Needville, TX | 427.3 GWh |
| #139 | Muscle Shoals | Cherokee, AL | 426.0 GWh |
| #140 | AP Sunray LLC | Knippa, TX | 425.6 GWh |
| #141 | Brazoria West | Damon, TX | 424.6 GWh |
| #142 | Big Elm Solar | Troy, TX | 424.2 GWh |
| #143 | Matrix Pleasant Valley | Boise, ID | 423.9 GWh |
| #144 | Sandrini Solar 200 | Mettler, CA | 423.7 GWh |
| #145 | Sherco Solar I | Clear Lake, MN | 421.6 GWh |
| #146 | Big Cypress Solar, LLC | Crawfordsville, AR | 421.4 GWh |
| #147 | Pearl River Solar Park LLC | Morton, MS | 419.6 GWh |
| #149 | Chestnut | Lemoore, CA | 393.3 GWh |
| #150 | Cutlass Solar II | Richmond, TX | 412.0 GWh |
| #151 | Oak Ridge Solar | Oak Ridge, LA | 411.8 GWh |
| #152 | Wright Solar Park | Los Banos, CA | 411.4 GWh |
| #153 | Misae Solar | Childress, TX | 411.4 GWh |
| #154 | Box Canyon (AZ) | Florence, AZ | 410.7 GWh |
| #155 | Mustang Two | Lemoore, CA | 408.4 GWh |
| #156 | Crane Solar Project | Crane, TX | 407.9 GWh |
| #157 | Mount Signal Solar Farm II | Calexico, CA | 403.8 GWh |
| #158 | Sun Streams, LLC | Arlington, AZ | 403.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brazoria County Solar Project (Danciger).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Brazoria West | Damon, TX | 424.6 GWh | 6 mi |
| Cascade Solar (TX) | Wharton, TX | 17.3 GWh | 15.9 mi |
| Colorado Bend Energy Center | Wharton, TX | 2.3 TWh | 20 mi |
| Colorado Bend II | Wharton, TX | 6.2 TWh | 19.9 mi |
| Cutlass Solar 1 LLC | Richmond, TX | 170.4 GWh | 16.1 mi |
| Cutlass Solar II | Richmond, TX | 412.0 GWh | 14.7 mi |
| Fighting Jays Solar Project | Needville, TX | 427.3 GWh | 12.5 mi |
| HEB00292 | Bay City, TX | 246.0 MWh | 18 mi |
| Jack Fusco Energy Center | Thompsons, TX | 3.3 TWh | 22 mi |
| Lane City Wind | Lane City, TX | 8.0 GWh | 16.3 mi |
| Mark One Power Station | Angleton, TX | 303.8 GWh | 20.2 mi |
| Newgulf Cogen | NewGulf, TX | 12.7 GWh | 10.2 mi |
| Old 300 Solar Center, LLC | Needville, TX | 960.9 GWh | 11.4 mi |
| Petra Nova Carbon Capture Cogen | Thompsons, TX | 200.8 GWh | 21.9 mi |
| Peyton Creek Wind Farm II | Bay City, TX | 181.2 GWh | 20.4 mi |
| Prairie Switch Wind LLC | El Campo, TX | 194.5 GWh | 20.7 mi |
| Second Division Solar | West Columbia, TX | 181.7 GWh | 1.3 mi |
| Sweeny Cogen Facility | Old Ocean, TX | 3.3 TWh | 7.3 mi |
| W A Parish | Thompsons, TX | 15.4 TWh | 22.5 mi |
| Wagyu | Damon, TX | 233.6 GWh | 7.6 mi |