Brazoria County Solar Project (Danciger)

2338 CR 772, Damon, TX 77430

Plant Summary Information

Brazoria County Solar Project (Danciger) is ranked #89 out of 255 solar farms in Texas in terms of total annual net electricity generation.

Brazoria County Solar Project (Danciger) generated 112.5 GWh during the 3-month period between May 2026 to August 2026.

Plant NameBrazoria County Solar Project (Danciger)
Utility NameBrazoria County Solar Project, LLC
LocationBrazoria County, TX
Initial Operation DateJuly 2022
Last Update Aug 2026
Annual Generation 389.6 GWh
Annual Consumption 1.5 M MMBtu
Ranked #1,704 out of 13,301 Power Plants Nationwide
Ranked #225 out of 7,209 Solar Power Plants Nationwide
Ranked #360 out of 861 Texas Power Plants
Ranked #89 out of 255 Texas Solar Power Plants
Fuel Types Solar
Previous Operator Brazoria County Solar Project (2022 to 2023)
Brazoria County Solar Project, LLC (2024 to 2025)

Map of Brazoria County Solar Project (Danciger)

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brazoria County Solar Project (Danciger).

Create Your Account Today

Monthly Net Generation for Brazoria County Solar Project (Danciger)

Monthly Plant Fuel Consumption for Brazoria County Solar Project (Danciger)

Brazoria County Solar Project (Danciger) Details

Summary Information
Plant NameBrazoria County Solar Project (Danciger) (66046)
Plant Address2338 CR 772, Damon, TX 77430
UtilityBrazoria County Solar Project, LLC (65221)
Latitude, Longitude29.1779, -95.7612
Generation Dates on FileOct 2022 to Aug 2026
Initial Operation DateJuly 2022
Annual Generation 389.6 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket Number22-86-000
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerCenterPoint Energy (8901) TX
Grid Voltage 138.00 kV
Energy StorageNo

Generator BRZ01 Details Operating July 2022

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
RTO ISO LMP Node DesignationDAG_ALL
RTO ISO Location Designation For Reporting Wholesale Sales DataDAG_ALL
Nameplate Capacity200 MW
Summer Capacity200 MW
Winter Capacity200 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2022
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
DC Net Capacity262.5 MW
Thin Film CDTEYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Brazoria County Solar Project (Danciger) Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#215Springbok Solar Farm 2Cantil, CA397.1 GWh
#216Maverick Solar 7, LLCDesert Center, CA396.7 GWh
#217Appleseed SolarLogansport, IN394.3 GWh
#218Luna ValleyMendota, CA393.3 GWh
#219Mesquite Solar 1Tonopah, AZ392.2 GWh
#220Gibson SolarPrinceton, IN392.1 GWh
#221Big Plain Solar, LLCLondon, OH391.8 GWh
#222Dunns Bridge I SolarWheatfield, IN391.3 GWh
#223Sun Mountain Solar 1Unincorporated Pueblo, CO390.7 GWh
#224Crooked Lake Solar, LLCBlytheville, AR390.6 GWh
#226Shallow BasketDulce, NM381.6 GWh
#227Green River SolarGuston, KY388.5 GWh
#228Speedway Solar, LLCMorrison Town, IN388.5 GWh
#229Impact Solar 1Deport, TX388.1 GWh
#230Yellow Pine IIEnterprise, NV373.2 GWh
#231Crane Solar ProjectCrane, TX387.3 GWh
#232Buena Vista Energy CenterChaparral, NM381.6 GWh
#233Madison Fields Solar Project, LLCIrwin, OH383.9 GWh
#234Corazon Energy LLCRachito Las Lomas, TX382.5 GWh
#235ChestnutLemoore, CA358.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Brazoria County Solar Project (Danciger).

Plant NamePlant LocationAnnual GenerationDistance
Brazoria WestDamon, TX419.1 GWh6 mi
Cascade Solar (TX)Wharton, TX9.6 GWh15.9 mi
Colorado Bend Energy CenterWharton, TX1.9 TWh20 mi
Colorado Bend IIWharton, TX6.7 TWh19.9 mi
Cutlass Solar 1 LLCRichmond, TX179.1 GWh16.1 mi
Cutlass Solar IIRichmond, TX448.4 GWh14.7 mi
Fighting Jays Solar ProjectNeedville, TX510.2 GWh12.5 mi
GulfStar Power, LLCWharton, TX896.1 GWh12.5 mi
HEB00292Bay City, TX191.0 MWh18 mi
Lane City WindLane City, TX524.7 GWh16.3 mi
Long Point SolarDamon, TX185.2 GWh6.9 mi
Mark One Power StationAngleton, TX416.2 GWh20.2 mi
Myrtle Solar, LLCAngleton, TX528.4 GWh20.4 mi
Old 300 Solar Center, LLCNeedville, TX901.8 GWh11.4 mi
Peyton Creek Wind Farm IIBay City, TX641.2 GWh20.4 mi
Prairie Switch Wind LLCEl Campo, TX515.8 GWh20.7 mi
Second Division SolarWest Columbia, TX193.2 GWh1.3 mi
Sweeny Cogen FacilityOld Ocean, TX2.9 TWh7.3 mi
Texas Gulf SulphurNewGulf, TX4.6 GWh10.2 mi
WagyuDamon, TX216.6 GWh7.6 mi