Mark One Power Station
24420 CR 48, Angleton, TX 77515Plant Summary Information
Mark One Power Station is ranked #134 out of 291 natural gas power plants in Texas in terms of total annual net electricity generation.
Mark One Power Station is comprised of 6 generators and generated 28.2 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Mark One Power Station |
---|---|
Utility Name | ProEnergy Services |
Location | Brazoria County, TX |
Initial Operation Date | November 2022 |
Last Update | Feb 2024 |
Annual Generation | 114.8 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #2,980 out of 11,455 Power Plants Nationwide | |
Ranked #878 out of 2,284 Natural Gas Power Plants Nationwide | |
Ranked #420 out of 726 Texas Power Plants | |
Ranked #134 out of 291 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Mark One Power Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mark One Power Station.
Monthly Net Generation for Mark One Power Station
Mark One Power Station Details
Summary Information | |
---|---|
Plant Name | Mark One Power Station (65372) |
Plant Address | 24420 CR 48 Angleton, TX 77515 |
Utility | ProEnergy Services (63082) |
Latitude, Longitude | 29.22711, -95.43076 |
Generation Dates on File | Oct 2022 to Feb 2024 |
Initial Operation Date | November 2022 |
Annual Generation | 114.8 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | KINDER MORGAN TEJAS PIPELINE LLC |
Natural Gas Storage | No |
Generator CTG-1 Details Operating November 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AE_BCH01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.6 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-2 Details Operating November 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AE_BCH01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.6 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-3 Details Operating November 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AE_BCH01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.6 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-4 Details Operating November 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AE BCH01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.6 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-5 Details Operating November 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AE BCH01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.6 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-6 Details Operating November 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AE BCH01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.6 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Mark One Power Station Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#868 | Ticonderoga Mill | Ticonderoga, NY | 199.2 GWh |
#869 | Pleasant Valley (MN) | Dexter, MN | 126.6 GWh |
#870 | Ascend Performance Materials Texas Inc. | Alvin, TX | 117.7 GWh |
#871 | Phillips 66 Rodeo Refinery | Rodeo, CA | 401.7 GWh |
#872 | WFEC GenCo LLC | Anadarko, OK | 116.9 GWh |
#873 | Angus Anson | Sioux Falls, SD | 118.1 GWh |
#874 | Hell Gate | Bronx, NY | 116.2 GWh |
#875 | Spiritwood Station | Spiritwood, ND | 162.0 GWh |
#876 | Decker Creek | Austin, TX | 115.4 GWh |
#877 | Victoria Port Power II LLC | Victoria, TX | 115.1 GWh |
#879 | Carson Ice-Gen Project | Sacramento, CA | 120.8 GWh |
#880 | University of Illinois Cogen Facility | Chicago, IL | 114.4 GWh |
#881 | Kansas Ethanol, LLC | Lyons, KS | 114.3 GWh |
#882 | Canyon Power Plant | Anaheim, CA | 114.2 GWh |
#883 | Cargill Corn Milling Division | Eddyville, IA | 113.8 GWh |
#884 | Whiting Refinery | Whiting, IN | 499.0 GWh |
#885 | Brunswick Cellulose | Brunswick, GA | 405.2 GWh |
#886 | Fort Dodge | Dodge City, KS | 112.8 GWh |
#887 | Mariposa Energy Project | Byron, CA | 111.6 GWh |
#888 | Pulliam | Green Bay, WI | 111.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mark One Power Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ascend Performance Materials Texas Inc. | Alvin, TX | 117.7 GWh | 13.4 mi |
BASF Freeport Works | Feeeport, TX | 595.6 GWh | 15.7 mi |
Braes Bayou Plant | Richmond, TX | 313.2 GWh | 20.9 mi |
Brazoria County Solar Project (Danciger) | Damon, TX | 456.8 GWh | 20.2 mi |
Brazoria West | Damon, TX | 441.2 GWh | 14.2 mi |
Brotman Power Station | Rosharon, TX | 285.5 GWh | 9.5 mi |
Fighting Jays Solar Project | Needville, TX | 518.0 GWh | 21.1 mi |
Freeport Energy | Freeport, TX | 2.5 TWh | 16.4 mi |
Freeport Energy Center | Freeport, TX | 1.4 TWh | 16.6 mi |
Freeport LP Pretreatment Facility | Freeport, TX | 404.5 GWh | 18.7 mi |
Jack Fusco Energy Center | Thompsons, TX | 3.6 TWh | 20.6 mi |
Longbow Solar, LLC | Liverpool, TX | 194.0 GWh | 9.1 mi |
Mckeever | Fresno, TX | 503.0 MWh | 19.7 mi |
Oyster Creek Unit VIII | Freeport, TX | 2.9 TWh | 17.9 mi |
Power Island | Alvin, TX | 837.6 GWh | 14.2 mi |
Praxair | Clute, TX | 340.1 MWh | 15.6 mi |
Sweeny Cogen Facility | Old Ocean, TX | 2.4 TWh | 21.8 mi |
W A Parish | Thompsons, TX | 11.5 TWh | 21.4 mi |
Wagyu | Damon, TX | 206.8 GWh | 13.7 mi |
WAL462 | Alvin, TX | 253.2 MWh | 18.1 mi |