Mark One Power Station
24420 CR 48, Angleton, TX 77515Plant Summary Information
Mark One Power Station is ranked #108 out of 313 natural gas power plants in Texas in terms of total annual net electricity generation.
Mark One Power Station is comprised of 8 generators and generated 119.7 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Mark One Power Station |
|---|---|
| Utility Name | City of San Antonio - (TX) |
| Location | Brazoria County, TX |
| Initial Operation Date | November 2022 |
| Last Update | May 2026 |
| Annual Generation | 408.2 GWh |
| Annual Consumption | 4.4 M MMBtu |
| Ranked #1,600 out of 13,081 Power Plants Nationwide | |
| Ranked #597 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #335 out of 852 Texas Power Plants | |
| Ranked #108 out of 313 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
ProEnergy Services (2021 to 2024) City of San Antonio - (TX) (2025 to 2025) |
Map of Mark One Power Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mark One Power Station.
Monthly Net Generation for Mark One Power Station
Monthly Plant Fuel Consumption for Mark One Power Station
Mark One Power Station Details
| Summary Information | |
|---|---|
| Plant Name | Mark One Power Station (65372) |
| Plant Address | 24420 CR 48, Angleton, TX 77515 |
| Utility | City of San Antonio - (TX) (16604) |
| Latitude, Longitude | 29.22711, -95.43076 |
| Generation Dates on File | Oct 2022 to May 2026 |
| Initial Operation Date | November 2022 |
| Annual Generation | 408.2 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG21-235-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | KINDER MORGAN TEJAS PIPELINE LLC |
| Natural Gas Storage | No |
Generator CTG-1 Details Operating November 2022
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | AE_BCH01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2022 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-2 Details Operating November 2022
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | AE_BCH01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2022 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-3 Details Operating November 2022
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | AE_BCH01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2022 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-4 Details Operating November 2022
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | AE BCH01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2022 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-5 Details Operating November 2022
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | AE BCH01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2022 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-6 Details Operating November 2022
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | AE BCH01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2022 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-7 Details Operating October 2024
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | AE BCH01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2024 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-8 Details Operating October 2024
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | AE BCH01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2024 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Mark One Power Station Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Mark One Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-1 | 100.00% |
| Mark One Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-2 | 100.00% |
| Mark One Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-3 | 100.00% |
| Mark One Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-4 | 100.00% |
| Mark One Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-5 | 100.00% |
| Mark One Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-6 | 100.00% |
| Mark One Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-7 | 100.00% |
| Mark One Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-8 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #587 | Gary Works | Gary, IN | 994.9 GWh |
| #588 | C R Wing Cogen Plant | Big Spring, TX | 427.5 GWh |
| #589 | E W Brown | Harrodsburg, KY | 1.8 TWh |
| #590 | Oxnard | Oxnard, CA | 425.0 GWh |
| #591 | Vermillion Energy Facility | Cayuga, IN | 422.3 GWh |
| #592 | Dave Gates Generating Station | Anaconda, MT | 420.9 GWh |
| #593 | Formosa Plastics | Baton Rouge, LA | 416.2 GWh |
| #594 | Sewell Creek Energy | Cedartown, GA | 415.7 GWh |
| #595 | Tolk | Muleshoe, TX | 3.1 TWh |
| #596 | Lockport Energy Associates LP | Lockport, NY | 413.0 GWh |
| #598 | Primient | Lafayette, IN | 408.0 GWh |
| #599 | Essential Power Rock Springs LLC | Rising Sun, MD | 407.7 GWh |
| #600 | World Generation X | North Tonawanda, NY | 404.3 GWh |
| #601 | Lodi Energy Center | Lodi, CA | 403.0 GWh |
| #602 | Audrain Generating Station | Vandalia, MO | 402.8 GWh |
| #603 | Yellowstone County Generating Station | Laurel, MT | 400.1 GWh |
| #604 | Talbot County Energy | Box Springs, GA | 412.3 GWh |
| #605 | Shady Hills Generating Station | Shady Hills, FL | 398.1 GWh |
| #606 | Edge Moor | Wilmington, DE | 391.3 GWh |
| #607 | University of Florida | Gainesville, FL | 388.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mark One Power Station.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ascend Performance Materials Texas Inc. | Alvin, TX | 98.0 GWh | 13.4 mi |
| BASF Freeport Works | Feeeport, TX | 537.4 GWh | 15.7 mi |
| Brazoria Solar I | Angleton, TX | 265.1 GWh | 7.1 mi |
| Brazoria West | Damon, TX | 422.3 GWh | 14.2 mi |
| Brotman Power Station | Rosharon, TX | 242.8 GWh | 9.5 mi |
| Cottonwood Bayou Solar | Liverpool, TX | 575.6 GWh | 10.7 mi |
| Freeport Energy | Freeport, TX | 1.8 TWh | 16.4 mi |
| Freeport Energy Center | Freeport, TX | 931.2 GWh | 16.6 mi |
| Freeport LP Pretreatment Facility | Freeport, TX | 623.7 GWh | 18.7 mi |
| HEB00760 | Manvel, TX | 205.0 MWh | 18.1 mi |
| Long Point Solar | Damon, TX | 96.7 GWh | 14.8 mi |
| Longbow Solar, LLC | Liverpool, TX | 163.4 GWh | 9.1 mi |
| Mckeever | Fresno, TX | 80.0 MWh | 19.7 mi |
| Myrtle Solar, LLC | Angleton, TX | 431.2 GWh | 0.2 mi |
| Oyster Creek Unit VIII | Freeport, TX | 2.6 TWh | 17.9 mi |
| Power Island | Alvin, TX | 907.8 GWh | 14.2 mi |
| Praxair | Clute, TX | 228.0 MWh | 15.6 mi |
| Second Division Solar | West Columbia, TX | 191.6 GWh | 19.1 mi |
| Wagyu | Damon, TX | 222.7 GWh | 13.7 mi |
| WAL462 | Alvin, TX | 90.0 MWh | 18.1 mi |