Mark One Power Station

24420 CR 48, Angleton, TX 77515

Plant Summary Information

Mark One Power Station is ranked #113 out of 314 natural gas power plants in Texas in terms of total annual net electricity generation.

Mark One Power Station is comprised of 8 generators and generated 124.4 GWh during the 3-month period between July 2025 to October 2025.

Plant NameMark One Power Station
Utility NameProEnergy Services
LocationBrazoria County, TX
Initial Operation DateNovember 2022
Last Update Oct 2025
Annual Generation 303.8 GWh
Annual Consumption 3.5 M MMBtu
Ranked #1,954 out of 12,553 Power Plants Nationwide
Ranked #648 out of 2,243 Natural Gas Power Plants Nationwide
Ranked #375 out of 804 Texas Power Plants
Ranked #113 out of 314 Texas Natural Gas Power Plants
Fuel Types Natural Gas

Map of Mark One Power Station

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mark One Power Station.

Create Your Account Today

Monthly Net Generation for Mark One Power Station

Mark One Power Station Details

Summary Information
Plant NameMark One Power Station (65372)
Plant Address24420 CR 48, Angleton, TX 77515
UtilityProEnergy Services (63082)
Latitude, Longitude29.22711, -95.43076
Generation Dates on FileOct 2022 to Oct 2025
Initial Operation DateNovember 2022
Annual Generation 303.8 GWh
Fuel Types Natural Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket NumberEG21-235-000
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerCenterPoint Energy (8901) TX
Grid Voltage 138.00 kV
Energy StorageNo
 
Natural Gas Information
Pipeline Name KINDER MORGAN TEJAS PIPELINE LLC
Natural Gas StorageNo

Generator CTG-1 Details Operating November 2022

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipWholly Owned by Other Entity
RTO ISO LMP Node DesignationAE_BCH01
Nameplate Capacity60.5 MW
Nameplate Power Factor0.85
Summer Capacity44.6 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2022
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator CTG-2 Details Operating November 2022

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipWholly Owned by Other Entity
RTO ISO LMP Node DesignationAE_BCH01
Nameplate Capacity60.5 MW
Nameplate Power Factor0.85
Summer Capacity44.6 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2022
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator CTG-3 Details Operating November 2022

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipWholly Owned by Other Entity
RTO ISO LMP Node DesignationAE_BCH01
Nameplate Capacity60.5 MW
Nameplate Power Factor0.85
Summer Capacity44.6 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2022
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator CTG-4 Details Operating November 2022

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipWholly Owned by Other Entity
RTO ISO LMP Node DesignationAE BCH01
Nameplate Capacity60.5 MW
Nameplate Power Factor0.85
Summer Capacity44.6 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2022
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator CTG-5 Details Operating November 2022

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipWholly Owned by Other Entity
RTO ISO LMP Node DesignationAE BCH01
Nameplate Capacity60.5 MW
Nameplate Power Factor0.85
Summer Capacity44.6 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2022
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator CTG-6 Details Operating November 2022

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipWholly Owned by Other Entity
RTO ISO LMP Node DesignationAE BCH01
Nameplate Capacity60.5 MW
Nameplate Power Factor0.85
Summer Capacity44.6 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2022
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator CTG-7 Details Operating October 2024

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipWholly Owned by Other Entity
RTO ISO LMP Node DesignationAE BCH01
Nameplate Capacity60.5 MW
Nameplate Power Factor0.85
Summer Capacity44.6 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator CTG-8 Details Operating October 2024

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipWholly Owned by Other Entity
RTO ISO LMP Node DesignationAE BCH01
Nameplate Capacity60.5 MW
Nameplate Power Factor0.85
Summer Capacity44.6 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Mark One Power Station Plant Owners

Owner NameAddressGeneratorOwnership
Mark One Generating, LLC8303 McHard Road, Houston, TX 77053Generator CTG-1100.00%
Mark One Generating, LLC8303 McHard Road, Houston, TX 77053Generator CTG-2100.00%
Mark One Generating, LLC8303 McHard Road, Houston, TX 77053Generator CTG-3100.00%
Mark One Generating, LLC8303 McHard Road, Houston, TX 77053Generator CTG-4100.00%
Mark One Generating, LLC8303 McHard Road, Houston, TX 77053Generator CTG-5100.00%
Mark One Generating, LLC8303 McHard Road, Houston, TX 77053Generator CTG-6100.00%
Mark One Generating, LLC8303 McHard Road, Houston, TX 77053Generator CTG-7100.00%
Mark One Generating, LLC8303 McHard Road, Houston, TX 77053Generator CTG-8100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#638Blue LakeShakopee, MN317.7 GWh
#639Edge MoorWilmington, DE327.6 GWh
#640Walton County Energy FacilityMonroe, GA313.8 GWh
#641Medical Area Total Energy PlantBoston, MA318.1 GWh
#642ExiraBrayton, IA313.7 GWh
#643MalburgVernon, CA311.1 GWh
#644Combined Locks Energy CenterCombined Locks, WI310.4 GWh
#645Stony Brook Cogen PlantStony Brook, NY309.3 GWh
#646Robert P Mone PlantConvoy, OH310.3 GWh
#647World Generation XNorth Tonawanda, NY307.8 GWh
#649Lake CatherineJones Mill, AR299.6 GWh
#650Flint Hills Resources Pine Bend, LLCRosemount, MN299.0 GWh
#651Larsen MemorialLakeland, FL298.1 GWh
#652SylvarenaRaleigh, MS294.3 GWh
#653Nevada Cogen Associates 2 Black MountainLas Vegas, NV294.0 GWh
#654Nevada Cogen Assoc#1 GarnetVlyLas Vegas, NV285.7 GWh
#655Big Sandy Peaker PlantKenona, WV285.3 GWh
#656South HarperKansas City, MO284.5 GWh
#657West Campus Cogeneration FacilityMadison, WI282.0 GWh
#658Denton Energy CenterDenton, TX280.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Mark One Power Station.

Plant NamePlant LocationAnnual GenerationDistance
Ascend Performance Materials Texas Inc.Alvin, TX147.5 GWh13.4 mi
BASF Freeport WorksFeeeport, TX532.7 GWh15.7 mi
Braes Bayou PlantRichmond, TX214.4 GWh20.9 mi
Brazoria County Solar Project (Danciger)Damon, TX419.3 GWh20.2 mi
Brazoria WestDamon, TX424.6 GWh14.2 mi
Brotman Power StationRosharon, TX340.9 GWh9.5 mi
Fighting Jays Solar ProjectNeedville, TX427.3 GWh21.1 mi
Freeport EnergyFreeport, TX1.8 TWh16.4 mi
Freeport Energy CenterFreeport, TX796.7 GWh16.6 mi
Freeport LP Pretreatment FacilityFreeport, TX555.9 GWh18.7 mi
HEB00760Manvel, TX115.0 MWh18.1 mi
Jack Fusco Energy CenterThompsons, TX3.3 TWh20.6 mi
Longbow Solar, LLCLiverpool, TX139.5 GWh9.1 mi
MckeeverFresno, TX187.0 MWh19.7 mi
Oyster Creek Unit VIIIFreeport, TX2.4 TWh17.9 mi
Power IslandAlvin, TX833.4 GWh14.2 mi
PraxairClute, TX14.0 MWh15.6 mi
Second Division SolarWest Columbia, TX181.7 GWh19.1 mi
WagyuDamon, TX233.6 GWh13.7 mi
WAL462Alvin, TX142.0 MWh18.1 mi