Brotman Power Station
1920 CR 52, Rosharon, TX 77583Plant Summary Information
Brotman Power Station is ranked #115 out of 314 natural gas power plants in Texas in terms of total annual net electricity generation.
Brotman Power Station is comprised of 8 generators and generated 25.6 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Brotman Power Station |
|---|---|
| Utility Name | ProEnergy Services |
| Location | Brazoria County, TX |
| Initial Operation Date | May 2023 |
| Last Update | Feb 2026 |
| Annual Generation | 283.8 GWh |
| Annual Consumption | 3.1 M MMBtu |
| Ranked #2,067 out of 12,637 Power Plants Nationwide | |
| Ranked #662 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #395 out of 820 Texas Power Plants | |
| Ranked #115 out of 314 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Brotman Power Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brotman Power Station.
Monthly Net Generation for Brotman Power Station
Monthly Plant Fuel Consumption for Brotman Power Station
Brotman Power Station Details
| Summary Information | |
|---|---|
| Plant Name | Brotman Power Station (65373) |
| Plant Address | 1920 CR 52, Rosharon, TX 77583 |
| Utility | ProEnergy Services (63082) |
| Latitude, Longitude | 29.36413, -95.43507 |
| Generation Dates on File | May 2023 to Feb 2026 |
| Initial Operation Date | May 2023 |
| Annual Generation | 283.8 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG22-192-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | FLORIDA GAS TRANSMISSION COMPANY |
| Natural Gas Storage | No |
Generator CTG-7 Details Operating October 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-8 Details Operating October 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-1 Details Operating May 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-2 Details Operating May 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-3 Details Operating May 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-4 Details Operating May 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-5 Details Operating May 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-6 Details Operating May 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Brotman Power Station Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Brotman Generating, LLC | 2001 Proenergy Blvd, Sedalia, MO 65301 | Generator CTG-1 | 100.00% |
| Brotman Generating, LLC | 2001 Proenergy Blvd, Sedalia, MO 65301 | Generator CTG-2 | 100.00% |
| Brotman Generating, LLC | 2001 Proenergy Blvd, Sedalia, MO 65301 | Generator CTG-3 | 100.00% |
| Brotman Generating, LLC | 2001 Proenergy Blvd, Sedalia, MO 65301 | Generator CTG-4 | 100.00% |
| Brotman Generating, LLC | 2001 Proenergy Blvd, Sedalia, MO 65301 | Generator CTG-5 | 100.00% |
| Brotman Generating, LLC | 2001 Proenergy Blvd, Sedalia, MO 65301 | Generator CTG-6 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #652 | Encogen | Bellingham, WA | 301.1 GWh |
| #653 | Lake Catherine | Jones Mill, AR | 299.6 GWh |
| #654 | Georgia-Pacific Muskogee | Muskogee, OK | 361.9 GWh |
| #655 | Flint Hills Resources Pine Bend, LLC | Rosemount, MN | 299.0 GWh |
| #656 | Larsen Memorial | Lakeland, FL | 298.1 GWh |
| #657 | Sylvarena | Raleigh, MS | 294.3 GWh |
| #658 | Big Sandy Peaker Plant | Kenona, WV | 285.3 GWh |
| #659 | Denton Energy Center | Denton, TX | 285.2 GWh |
| #660 | South Harper | Kansas City, MO | 284.5 GWh |
| #661 | Nevada Cogen Associates 2 Black Mountain | Las Vegas, NV | 284.4 GWh |
| #663 | West Campus Cogeneration Facility | Madison, WI | 282.0 GWh |
| #664 | Corpus Refinery | Corpus Christi, TX | 280.5 GWh |
| #665 | Harry D Mattison Gas Plant | Tontitown, AR | 278.7 GWh |
| #666 | Woodland | Modesto, CA | 278.6 GWh |
| #667 | Ames Electric Services Power Plant | Ames, IA | 305.6 GWh |
| #668 | Manchief Electric Generating Station | Brush, CO | 274.5 GWh |
| #669 | Sundance | Casa Grande, AZ | 274.2 GWh |
| #670 | West Point (PA) | West Point, PA | 272.0 GWh |
| #671 | Frank Knutson | Commerce City, CO | 275.6 GWh |
| #672 | Holden | Holden, MO | 282.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brotman Power Station.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ascend Performance Materials Texas Inc. | Alvin, TX | 147.5 GWh | 15.5 mi |
| Braes Bayou Plant | Richmond, TX | 190.1 GWh | 13.7 mi |
| Brazoria West | Damon, TX | 429.4 GWh | 18.2 mi |
| HEB00063 | Pearland, TX | 306.0 MWh | 13.8 mi |
| HEB00110 | Missouri City, TX | 179.0 MWh | 13.4 mi |
| HEB00760 | Manvel, TX | 115.0 MWh | 8.7 mi |
| Jack Fusco Energy Center | Thompsons, TX | 3.8 TWh | 13.7 mi |
| Long Point Solar | Damon, TX | 29.0 GWh | 16.7 mi |
| Longbow Solar, LLC | Liverpool, TX | 150.5 GWh | 9.7 mi |
| Mark One Power Station | Angleton, TX | 353.8 GWh | 9.5 mi |
| Mckeever | Fresno, TX | 187.0 MWh | 10.3 mi |
| Petra Nova Carbon Capture Cogen | Thompsons, TX | 200.8 GWh | 14.2 mi |
| Power Island | Alvin, TX | 833.4 GWh | 17.2 mi |
| Southwick | Houston, TX | 111.0 MWh | 16.5 mi |
| W A Parish | Thompsons, TX | 15.2 TWh | 14.4 mi |
| Wagyu | Damon, TX | 241.4 GWh | 15.9 mi |
| WAL3510 | Pearland, TX | 218.0 MWh | 17.4 mi |
| WAL3572 | Pearland, TX | 163.0 MWh | 13.7 mi |
| WAL462 | Alvin, TX | 142.0 MWh | 12.9 mi |
| WAL872 | Pearland, TX | 214.0 MWh | 17.1 mi |