Brotman Power Station
1920 CR 52, Rosharon, TX 77583Plant Summary Information
Brotman Power Station is ranked #123 out of 313 natural gas power plants in Texas in terms of total annual net electricity generation.
Brotman Power Station is comprised of 8 generators and generated 46.7 GWh during the 3-month period between April 2026 to July 2026.
| Plant Name | Brotman Power Station |
|---|---|
| Utility Name | ProEnergy Services |
| Location | Brazoria County, TX |
| Initial Operation Date | May 2023 |
| Last Update | Jul 2026 |
| Annual Generation | 225.2 GWh |
| Annual Consumption | 2.6 M MMBtu |
| Ranked #2,424 out of 13,285 Power Plants Nationwide | |
| Ranked #725 out of 2,215 Natural Gas Power Plants Nationwide | |
| Ranked #462 out of 856 Texas Power Plants | |
| Ranked #123 out of 313 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Brotman Power Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brotman Power Station.
Monthly Net Generation for Brotman Power Station
Monthly Plant Fuel Consumption for Brotman Power Station
Brotman Power Station Details
| Summary Information | |
|---|---|
| Plant Name | Brotman Power Station (65373) |
| Plant Address | 1920 CR 52, Rosharon, TX 77583 |
| Utility | ProEnergy Services (63082) |
| Latitude, Longitude | 29.36413, -95.43507 |
| Generation Dates on File | May 2023 to Jul 2026 |
| Initial Operation Date | May 2023 |
| Annual Generation | 225.2 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG22-192-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | FLORIDA GAS TRANSMISSION COMPANY |
| Natural Gas Storage | No |
Generator CTG-7 Details Operating October 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-8 Details Operating October 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-1 Details Operating May 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-2 Details Operating May 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-3 Details Operating May 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-4 Details Operating May 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-5 Details Operating May 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-6 Details Operating May 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | ACHBTM01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.6 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Brotman Power Station Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Brotman Generating, LLC | 2001 Proenergy Blvd, Sedalia, MO 65301 | Generator CTG-1 | 100.00% |
| Brotman Generating, LLC | 2001 Proenergy Blvd, Sedalia, MO 65301 | Generator CTG-2 | 100.00% |
| Brotman Generating, LLC | 2001 Proenergy Blvd, Sedalia, MO 65301 | Generator CTG-3 | 100.00% |
| Brotman Generating, LLC | 2001 Proenergy Blvd, Sedalia, MO 65301 | Generator CTG-4 | 100.00% |
| Brotman Generating, LLC | 2001 Proenergy Blvd, Sedalia, MO 65301 | Generator CTG-5 | 100.00% |
| Brotman Generating, LLC | 2001 Proenergy Blvd, Sedalia, MO 65301 | Generator CTG-6 | 100.00% |
| Brotman Generating, LLC | 2001 Proenergy Blvd, Sedalia, MO 65301 | Generator CTG-7 | 100.00% |
| Brotman Generating, LLC | 2001 Proenergy Blvd, Sedalia, MO 65301 | Generator CTG-8 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #715 | Culbertson Generation Station | Culbertson, MT | 231.2 GWh |
| #716 | ArcelorMittal Burns Harbor | Burns Harbor, IN | 719.4 GWh |
| #717 | Cornell University Central Heat | Ithaca, NY | 229.8 GWh |
| #718 | Montpelier Electric Generating Station | Poneto, IN | 231.4 GWh |
| #719 | Carr Street Generating Station | East Syracuse, NY | 227.6 GWh |
| #720 | Whitewater Generating Station | Whitewater, WI | 229.7 GWh |
| #721 | Ticona Polymers Inc | Bishop, TX | 227.3 GWh |
| #722 | El Dorado Refinery | El Dorado, KS | 226.8 GWh |
| #723 | University of California San Diego Hybri | La Jolla, CA | 226.7 GWh |
| #724 | NAEA Lakewood LLC | Lakewood, NJ | 239.4 GWh |
| #726 | Intercession City | Intercession City, FL | 243.1 GWh |
| #727 | Holden | Holden, MO | 222.7 GWh |
| #728 | Roquette America | Keokuk, IA | 222.3 GWh |
| #729 | Central Utility Plant Cincinnati | Cincinnati, OH | 223.8 GWh |
| #730 | Groton Generation Station | Groton, SD | 220.7 GWh |
| #731 | Harry D Mattison Gas Plant | Tontitown, AR | 220.5 GWh |
| #732 | South Harper | Kansas City, MO | 218.4 GWh |
| #733 | Exelon West Medway II LLC | Medway, MA | 230.6 GWh |
| #734 | Lauderdale | Ft. Lauderdale, FL | 228.2 GWh |
| #735 | Calvert City | Calvert City, KY | 215.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brotman Power Station.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ascend Performance Materials Texas Inc. | Alvin, TX | 98.0 GWh | 15.5 mi |
| Braes Bayou Plant | Richmond, TX | 178.0 GWh | 13.7 mi |
| Brazoria Solar I | Angleton, TX | 362.6 GWh | 16 mi |
| Cottonwood Bayou Solar | Liverpool, TX | 571.6 GWh | 12.7 mi |
| HEB00063 | Pearland, TX | 308.0 MWh | 13.8 mi |
| HEB00110 | Missouri City, TX | 155.0 MWh | 13.4 mi |
| HEB00760 | Manvel, TX | 205.0 MWh | 8.7 mi |
| Jack Fusco Energy Center | Thompsons, TX | 3.9 TWh | 13.7 mi |
| Long Point Solar | Damon, TX | 152.8 GWh | 16.7 mi |
| Longbow Solar, LLC | Liverpool, TX | 168.1 GWh | 9.7 mi |
| Mark One Power Station | Angleton, TX | 414.9 GWh | 9.5 mi |
| Mckeever | Fresno, TX | 80.0 MWh | 10.3 mi |
| Myrtle Solar, LLC | Angleton, TX | 410.0 GWh | 9.4 mi |
| Petra Nova Carbon Capture Cogen | Thompsons, TX | 200.5 GWh | 14.2 mi |
| Southwick | Houston, TX | 65.0 MWh | 16.5 mi |
| W A Parish | Thompsons, TX | 14.1 TWh | 14.4 mi |
| Wagyu | Damon, TX | 215.0 GWh | 15.9 mi |
| WAL3572 | Pearland, TX | 74.0 MWh | 13.7 mi |
| WAL462 | Alvin, TX | 90.0 MWh | 12.9 mi |
| WAL872 | Pearland, TX | 308.0 MWh | 17.1 mi |