Lick Creek Solar, LLC is ranked #26 out of 762 solar farms in North Carolina in terms of total annual net electricity generation.
Lick Creek Solar, LLC generated 31.9 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Lick Creek Solar, LLC |
|---|---|
| Utility Name | SunStrong Management |
| Location | Stokes County, NC |
| Initial Operation Date | March 2022 |
| Last Update | May 2026 |
| Annual Generation | 108.1 GWh |
| Annual Consumption | 402.6 k MMBtu |
| Ranked #3,392 out of 13,081 Power Plants Nationwide | |
| Ranked #863 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #68 out of 876 North Carolina Power Plants | |
| Ranked #26 out of 762 North Carolina Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Lick Creek Solar, LLC (2019 to 2024) SunStrong Management (2025 to 2025) |
Map of Lick Creek Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lick Creek Solar, LLC.
Monthly Net Generation for Lick Creek Solar, LLC
Monthly Plant Fuel Consumption for Lick Creek Solar, LLC
Lick Creek Solar, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Lick Creek Solar, LLC (63811) |
| Plant Address | 1400 Martin Luther King Jr Rd, Walnut Cove, NC 27052 |
| Utility | SunStrong Management (67509) |
| Latitude, Longitude | 36.28306, -80.12827 |
| Generation Dates on File | Mar 2022 to May 2026 |
| Initial Operation Date | March 2022 |
| Annual Generation | 108.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 18-1878-000, 18-1878-001 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Carolinas (DUK) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
| Grid Voltage | 100.00 kV |
| Energy Storage | No |
Generator PGR27 Details Operating March 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 70 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Lick Creek Solar, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #853 | Kelso 2 Solar | Benton, MO | 111.2 GWh |
| #854 | Kimmel Road Solar, LLC | Du Quoin, IL | 110.5 GWh |
| #855 | Seabrook Solar | Seabrook, SC | 110.4 GWh |
| #856 | LA3 West Baton Rouge Solar Facility | West Baton Rouge, LA | 109.9 GWh |
| #857 | Salt Creek Township Solar, LLC | Mason City, IL | 109.8 GWh |
| #858 | Envoy Solar, LLC | Mexico, MO | 108.9 GWh |
| #859 | Sumrall II Solar Farm | Sumrall, MS | 108.7 GWh |
| #860 | Castle Solar, LLC | Huntington, UT | 108.5 GWh |
| #861 | Manatee Solar Energy Center | Parrish, FL | 93.0 GWh |
| #862 | Turquoise Nevada, LLC | Sparks, NV | 108.3 GWh |
| #864 | Airport Solar | Lakeview, OR | 107.9 GWh |
| #865 | Spring Grove Solar 2 | Spring Grove, VA | 107.8 GWh |
| #866 | Techren Solar V | Boulder, NV | 107.7 GWh |
| #867 | Wheatland | Wheatland, IN | 107.5 GWh |
| #868 | SR Lambert II | Georgetown, SC | 107.4 GWh |
| #869 | Broad River Solar, LLC | Mooresboro, NC | 107.3 GWh |
| #870 | Elevation Solar C | Lancaster, CA | 107.1 GWh |
| #871 | Beacon Solar Plant Site 2 | Cantil, CA | 107.0 GWh |
| #872 | SR Turkey Creek, LLC | Lancaster, KY | 107.0 GWh |
| #873 | Little Bear 5 | Mendota, CA | 106.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lick Creek Solar, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 1008 Matthews Solar | East Bend, NC | 8.2 GWh | 24.1 mi |
| Avalon Hydropower | Mayodan, NC | 2.5 GWh | 13.8 mi |
| Belews Creek | Belews Creek, NC | 8.2 TWh | 3.8 mi |
| Carol Jean Solar | Walnut Cove, NC | 6.3 GWh | 2.5 mi |
| Germantown Solar, LLC | Rural Hall, NC | 2.9 GWh | 7.5 mi |
| High Point, POLO | High Point, NC | 37.0 MWh | 23.6 mi |
| High Point, Pump Station Rd | High Point, NC | 63.0 MWh | 22.8 mi |
| Ingredion Winston Salem | Winston-Salem, NC | 28.8 GWh | 18.1 mi |
| Moore Solar | Reidsville, NC | 9.6 GWh | 21.7 mi |
| Moore Solar Farm | Reidsville, NC | 7.5 GWh | 20.6 mi |
| Moyer Solar | Stoneville, NC | 9.9 GWh | 15.5 mi |
| Pilot Mountain Solar, LLC | King, NC | 8.8 GWh | 13.8 mi |
| Rockingham County CT Station | Reidsville, NC | 1.8 TWh | 16.9 mi |
| Salem Energy Systems LLC | Winston-Salem, NC | 76.0 MWh | 7 mi |
| South Winston Farm, LLC | Winston-Salem, NC | 8.0 GWh | 20.1 mi |
| Ward WTP | High Point, NC | 133.0 MWh | 23.5 mi |
| Washington Solar | Reidsville, NC | 11.3 GWh | 18.7 mi |
| Waste Management Piedmont LFGTE Project | Kernersville, NC | 9.0 GWh | 7.9 mi |
| Westside WWTP | Thomasville, NC | 30.0 MWh | 23.7 mi |
| White Street Renewables | Greensboro, NC | 15.6 GWh | 25.7 mi |