East Point Energy Center
1347 HWY 20, Sharon Springs, NY 13459Plant Summary Information
East Point Energy Center is ranked #3 out of 574 solar farms in New York in terms of total annual net electricity generation.
East Point Energy Center generated 14.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | East Point Energy Center |
|---|---|
| Utility Name | East Point Energy Center, LLC |
| Location | Schoharie County, NY |
| Initial Operation Date | May 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 96.7 GWh |
| Annual Consumption | 338.1 k MMBtu |
| Ranked #3,462 out of 12,613 Power Plants Nationwide | |
| Ranked #840 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #91 out of 944 New York Power Plants | |
| Ranked #3 out of 574 New York Solar Power Plants | |
| Fuel Types | Solar |
Map of East Point Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for East Point Energy Center.
Monthly Net Generation for East Point Energy Center
Monthly Plant Fuel Consumption for East Point Energy Center
East Point Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | East Point Energy Center (65805) |
| Plant Address | 1347 HWY 20, Sharon Springs, NY 13459 |
| Utility | East Point Energy Center, LLC (65018) |
| Latitude, Longitude | 42.46137, -74.33509 |
| Generation Dates on File | May 2024 to Dec 2025 |
| Initial Operation Date | May 2024 |
| Annual Generation | 96.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | Niagara Mohawk Power Corp. (13573) NY |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator EP01 Details Operating May 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 50.84 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
East Point Energy Center Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #830 | Pleasant Creek Unit 1 | Palo, IA | 98.1 GWh |
| #831 | Albany Solar (WI) | Broadhead, WI | 98.0 GWh |
| #832 | Prineville Solar Energy LLC | Prineville, OR | 98.0 GWh |
| #833 | Cassville Solar | Cassville, WI | 97.7 GWh |
| #834 | ENGIE Solidago Solar Project - Hybrid | Townsend, DE | 97.5 GWh |
| #835 | Pearl Solar | Fort Stockton, TX | 97.4 GWh |
| #836 | Titan Solar | Deer Trail, CO | 97.4 GWh |
| #837 | Bird Dog Solar | Waynesboro, GA | 97.1 GWh |
| #838 | Creston Solar (50 MW) | Creston, IA | 97.0 GWh |
| #839 | Peace Creek Solar | Bartow, FL | 96.7 GWh |
| #841 | Marshall Solar Energy Project | Marshall, MN | 96.6 GWh |
| #842 | Buckleberry Solar | Grifton, NC | 96.4 GWh |
| #843 | TAG | Rio Rancho, NM | 93.3 GWh |
| #844 | Citrus Ridge Solar | Bay Lake, FL | 95.0 GWh |
| #845 | Envoy Solar, LLC | Mexico, MO | 94.9 GWh |
| #846 | Troy Solar | Troy, IN | 94.8 GWh |
| #847 | Innovative Solar 42 | Fayetteville, NC | 94.6 GWh |
| #848 | CM48 | Boulder City, NV | 94.3 GWh |
| #849 | Brightside | Beeville, TX | 94.0 GWh |
| #850 | Vancourt Solar Interconnections | La Feria, TX | 93.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding East Point Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Altamont (NY) (CSG) | Guilderland, NY | 12.0 MWh | 24.8 mi |
| Bethlehem Solar | New Scotland, NY | 2.2 GWh | 24.8 mi |
| Bogart Solar | Palenville, NY | 2.2 GWh | 24.6 mi |
| Costanza Solar | Westerlo, NY | 2.9 GWh | 13.5 mi |
| Duanesburg | Duanesburg, NY | 3.3 GWh | 21.9 mi |
| Freehold(CSG) | Freehold, NY | 3.5 GWh | 16.4 mi |
| Greene County Meter #1 | Cairo, NY | 1.7 GWh | 20.6 mi |
| Guilderland Solar | Altamont, NY | 2.5 GWh | 23.7 mi |
| Guildlerland CSG | Guilderland, NY | 3.1 GWh | 25 mi |
| Hecate Energy Albany 2 LLC | Coeymans, NY | 24.7 GWh | 25.6 mi |
| Hecate Energy Albany County 1 | Coeymans, NY | 26.5 GWh | 25.8 mi |
| Medusa NY 1 | Medusa, NY | 3.3 GWh | 12 mi |
| Owens Corning at Bethlehem | Bethlehem, NY | 2.7 GWh | 25.5 mi |
| Princetown Solar 1 | Duanesburg, NY | 221.0 MWh | 25.8 mi |
| RT32 Westerlo Solar 1 | Westerlo, NY | 8.3 GWh | 16.3 mi |
| RT405 Westerlo Solar 2 | Albany, NY | 8.2 GWh | 16.3 mi |
| Selkirk Cogen | Selkirk, NY | 92.4 GWh | 25.5 mi |
| Sharon Springs | Sharon Springs, NY | 3.4 GWh | 24.7 mi |
| South Cairo | Cairo, NY | 583.6 MWh | 21.3 mi |
| Westerlo NY 1 | South Westerlo, NY | 3.5 GWh | 16.4 mi |