ENGIE Solidago Solar Project - Hybrid
200 Dogtown Road, Townsend, DE 19734Plant Summary Information
ENGIE Solidago Solar Project - Hybrid is ranked #6 out of 34 power plants in Delaware in terms of total annual net electricity generation.
ENGIE Solidago Solar Project - Hybrid generated 34.7 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | ENGIE Solidago Solar Project - Hybrid |
|---|---|
| Utility Name | ENGIE Solidago Solar LLC |
| Location | New Castle County, DE |
| Initial Operation Date | December 2022 |
| Last Update | Jun 2026 |
| Annual Generation | 101.6 GWh |
| Annual Consumption | 380.9 k MMBtu |
| Ranked #3,491 out of 13,094 Power Plants Nationwide | |
| Ranked #913 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #6 out of 34 Delaware Power Plants | |
| Ranked #1 out of 17 Delaware Solar Power Plants | |
| Fuel Types | Solar |
Map of ENGIE Solidago Solar Project - Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for ENGIE Solidago Solar Project - Hybrid.
Monthly Net Generation for ENGIE Solidago Solar Project - Hybrid
Monthly Plant Fuel Consumption for ENGIE Solidago Solar Project - Hybrid
ENGIE Solidago Solar Project - Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | ENGIE Solidago Solar Project - Hybrid (65304) |
| Plant Address | 200 Dogtown Road, Townsend, DE 19734 |
| Utility | ENGIE Solidago Solar LLC (64609) |
| Latitude, Longitude | 39.39519, -75.7535 |
| Generation Dates on File | Dec 2022 to Jun 2026 |
| Initial Operation Date | December 2022 |
| Annual Generation | 101.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | Delmarva Power (5027) DE |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator SOLAR Details Operating December 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 64.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
ENGIE Solidago Solar Project - Hybrid Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #903 | Beacon Solar Plant Site 2 | Cantil, CA | 105.2 GWh |
| #904 | Solar PV Development NM 18 II LLC | Deming, NM | 104.9 GWh |
| #905 | Ocotillo Wells | Borrego Springs, CA | 104.8 GWh |
| #906 | East Point Energy Center | Sharon Springs, NY | 103.9 GWh |
| #907 | Boulder Solar II, LLC | Boulder City, NV | 103.1 GWh |
| #908 | Boardwalk | TBD, FL | 102.2 GWh |
| #909 | Bladen Solar | Fayetteville, NC | 102.1 GWh |
| #910 | Beaver Dam Solar | Dodge, WI | 102.1 GWh |
| #911 | East Atmore Solar | Flomaton, AL | 101.8 GWh |
| #912 | Bullock Solar, LLC | Manson, NC | 101.7 GWh |
| #914 | Bear Creek (WI) | Lone Rock, WI | 100.9 GWh |
| #915 | Edwards Sanborn S1 | Mojave, CA | 98.6 GWh |
| #916 | Sugar Solar, LLC | Yadkinville, NC | 100.3 GWh |
| #917 | Luning Energy | Luning, NV | 100.3 GWh |
| #918 | Brantley Solar | Spring Hope, NC | 99.8 GWh |
| #919 | Durrance | Mulberry, FL | 99.7 GWh |
| #920 | Millington Solar Farm | Millington, TN | 99.5 GWh |
| #921 | Goldenrod | Immokalee, FL | 99.4 GWh |
| #922 | Blue Harvest Solar Park | Continental, OH | 99.3 GWh |
| #923 | Whistling Duck I | Williston, FL | 99.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding ENGIE Solidago Solar Project - Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AstraZeneca Newark Solar | Newark, DE | 5.3 GWh | 17.7 mi |
| Blue Hen Solar | Dartley, DE | 2.2 GWh | 14.9 mi |
| Blue Star | Massey, MD | 11.5 GWh | 6 mi |
| Bluegrass Solar | Church Hill, MD | 154.6 GWh | 18.6 mi |
| Brookside Newark | Newark, DE | 20.5 GWh | 19 mi |
| Cecil County CCVT HS | Elkton, MD | 3.3 GWh | 17.9 mi |
| DE-ECA CS Hartly | Hartly, DE | 2.3 GWh | 14.5 mi |
| Delaware City Plant | Delaware City, DE | 1.0 TWh | 14.7 mi |
| DG AMP Solar Smyrna | Smyrna, DE | 1.7 GWh | 10.6 mi |
| Elkton Solar | Elkton, MD | 2.4 GWh | 15.1 mi |
| IKEA Perryville 460 | Perryville, MD | 3.2 GWh | 19.7 mi |
| Jones Farm Solar | Millington, MD | 129.7 GWh | 11.3 mi |
| KE73 CSG | Dover, DE | 1.0 MWh | 15.1 mi |
| Kent County - Worton Complex | Worton, MD | 1.3 GWh | 19.7 mi |
| Kent County-Kennedyville | Kennedyville, MD | 1.4 GWh | 14 mi |
| MD - WL Gore - Appleton | Elkton, MD | 1.7 GWh | 17.4 mi |
| PSEG Hope Creek Generating Station | Hancocks Bridge, NJ | 8.8 TWh | 12.5 mi |
| PSEG Salem Generating Station | Hancocks Bridge, NJ | 19.3 TWh | 12.5 mi |
| Red Lion Energy Center | New Castle, DE | 201.7 GWh | 16.2 mi |
| Warren F Sam Beasley Generation Station | Smyrna, DE | 86.2 GWh | 10.6 mi |