SR Turkey Creek, LLC
Curry Way, Lancaster, KY 40444Plant Summary Information
SR Turkey Creek, LLC is ranked #33 out of 59 power plants in Kentucky in terms of total annual net electricity generation.
SR Turkey Creek, LLC generated 36.6 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | SR Turkey Creek, LLC |
|---|---|
| Utility Name | SR Turkey Creek, LLC |
| Location | Garrard County, KY |
| Initial Operation Date | November 2022 |
| Last Update | Sep 2025 |
| Annual Generation | 107.3 GWh |
| Annual Consumption | 398.1 k MMBtu |
| Ranked #3,319 out of 12,539 Power Plants Nationwide | |
| Ranked #778 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #33 out of 59 Kentucky Power Plants | |
| Ranked #6 out of 17 Kentucky Solar Power Plants | |
| Fuel Types | Solar |
Map of SR Turkey Creek, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SR Turkey Creek, LLC.
Monthly Net Generation for SR Turkey Creek, LLC
SR Turkey Creek, LLC Details
| Summary Information | |
|---|---|
| Plant Name | SR Turkey Creek, LLC (64842) |
| Plant Address | Curry Way, Lancaster, KY 40444 |
| Utility | SR Turkey Creek, LLC (64363) |
| Latitude, Longitude | 37.59299, -84.56797 |
| Generation Dates on File | Dec 2022 to Sep 2025 |
| Initial Operation Date | November 2022 |
| Annual Generation | 107.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | East Kentucky Power Coop, Inc (5580) |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator SRTC Details Operating November 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 70 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
SR Turkey Creek, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #768 | Jicarilla Solar 1 LLC | Dulce, NM | 107.2 GWh |
| #769 | Sumrall II Solar Farm | Sumrall, MS | 109.7 GWh |
| #770 | Fountain Creek Solar | Skippers, VA | 109.0 GWh |
| #771 | SolaireHolman Solar Project | Alpine, TX | 108.8 GWh |
| #772 | Kellam Solar | Ben Wheeler, TX | 108.7 GWh |
| #773 | Ocotillo Wells | Borrego Springs, CA | 108.6 GWh |
| #774 | Lick Creek Solar, LLC | Walnut Cove, NC | 108.6 GWh |
| #775 | Castle Solar, LLC | Huntington, UT | 108.1 GWh |
| #776 | Midway Solar Farm 1 | Calipatria, CA | 107.9 GWh |
| #777 | Turquoise Nevada, LLC | Sparks, NV | 107.4 GWh |
| #779 | Hornshadow Solar, LLC | Castle Dale, UT | 106.6 GWh |
| #780 | FPL Cavendish Solar Energy Center | Okeechobee, FL | 106.5 GWh |
| #781 | Sugar Solar, LLC | Yadkinville, NC | 106.2 GWh |
| #782 | Baldy Mesa 2_Silver Peak Hybrid | Adelanto, CA | 98.2 GWh |
| #783 | Pitts Dudik Solar | Hubbard, TX | 106.0 GWh |
| #784 | Sunlight Road Solar | Franklinton, LA | 105.5 GWh |
| #785 | Techren Solar V | Boulder, NV | 105.2 GWh |
| #786 | Salt City Solar Project - Hybrid | Circleville, OH | 105.1 GWh |
| #787 | Bladen Solar | Fayetteville, NC | 105.1 GWh |
| #788 | Innovative Solar 42 | Fayetteville, NC | 104.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding SR Turkey Creek, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blue Ridge Generating | Irvine, KY | 2.0 GWh | 33.3 mi |
| Bluebird Solar LLC | Leesburg, KY | 20.2 GWh | 49.9 mi |
| Bluegrass Generating Station | LaGrange, KY | 112.5 GWh | 71.8 mi |
| Cooper | Somerset, KY | 505.8 GWh | 41.1 mi |
| Cooperative Solar One | Winchester, KY | 12.7 GWh | 34.5 mi |
| Cox Waste to Energy | Campbellsville, KY | 9.7 GWh | 47.4 mi |
| Dix Dam | Harrodsburg, KY | 54.2 GWh | 15.3 mi |
| E W Brown | Harrodsburg, KY | 1.6 TWh | 15.6 mi |
| Glover Creek Solar, LLC | Summer Shade, KY | 115.8 GWh | 79 mi |
| Green City Recovery, LLC | Georgetown, KY | 1.2 GWh | 52 mi |
| Hardin County LFGTE | Elizabethtown, KY | 10.3 GWh | 64 mi |
| J K Smith | Winchester, KY | 872.7 GWh | 32.4 mi |
| Laurel Dam | London, KY | 53.2 GWh | 46.6 mi |
| Matilda Hamilton Fee Hydroelectric Stati | Ravenna, KY | 8.0 GWh | 34.4 mi |
| Mill Creek (KY) | Louisville, KY | 6.9 TWh | 79.8 mi |
| Morehead Generating Facility | Morehead, KY | 6.3 GWh | 69.5 mi |
| Mother Ann Lee | Harrodsburg, KY | 6.3 GWh | 18.5 mi |
| Paris (KY) | Paris, KY | 743.8 MWh | 45.9 mi |
| Pendleton County LFGTE | Butler, KY | 23.9 GWh | 79.3 mi |
| Wolf Creek | Jamestown, KY | 723.8 GWh | 59.3 mi |