Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Vinam | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2013 | Dec 2024 | Solar |
| Vikings Energy Farm | Vikings Energy Farm, LLC | Holtville, CA | Imperial Irrigation District (IID) | 310.4 GWh | Apr 2024 | Sep 2025 | Solar |
| Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 609.7 GWh | Feb 2024 | Sep 2025 | Solar |
| Victory Garden (Tehachapi) | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 33.0 GWh | Nov 1981 | Dec 2024 | Wind |
| Victor Mesa Linda E2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.5 GWh | Oct 2014 | Dec 2024 | Solar |
| Victor Mesa Linda D2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.5 GWh | Oct 2014 | Dec 2024 | Solar |
| Victor Mesa Linda C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.5 GWh | Oct 2014 | Dec 2024 | Solar |
| Victor Mesa Linda B2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.5 GWh | Oct 2014 | Dec 2024 | Solar |
| Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.5 GWh | May 2015 | Dec 2024 | Solar |
| Victor Dry Farm Ranch A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.7 GWh | May 2015 | Dec 2024 | Solar |
| Verwey-Hanford Dairy Digester #3 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.4 GWh | Jun 2019 | Dec 2024 | Other Biomass Gas |
| Verwey-Hanford Dairy Digester #2 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.9 GWh | Jun 2019 | Dec 2024 | Other Biomass Gas |
| Verwey-Hanford Dairy Digester #1 | AlsoEnergy | Hanford, CA | California Independent System Operator (CISO) | 901.6 MWh | Sep 2016 | Dec 2024 | Other Biomass Gas |
| Verizon-Torrance | Bloom Energy | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 5.8 GWh | Nov 2013 | Dec 2023 | Natural Gas |
| Ventura Solar | Ventura Solar LLC | Fillmore, CA | California Independent System Operator (CISO) | 6.2 GWh | Aug 2021 | Dec 2024 | Solar |
| Venable Solar 2 | Venable Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Dec 2024 | Solar |
| Venable Solar 1 | Venable Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Dec 2024 | Solar |
| Vega Solar | Vega Solar, LLC | Los Banos, CA | California Independent System Operator (CISO) | 51.1 GWh | Feb 2015 | Dec 2024 | Solar |
| Vasco Winds | Vasco Winds, LLC | Livermore, CA | California Independent System Operator (CISO) | 223.0 GWh | Nov 2011 | Dec 2024 | Wind |
| Vandenberg Solar Project | MN8 Energy LLC | Vandenberg Airforce B, CA | California Independent System Operator (CISO) | 39.7 GWh | Nov 2017 | Dec 2024 | Solar |
| Van der Kooi Dairy Solar Array | Maas Energy Works | Riverdale, CA | California Independent System Operator (CISO) | 3.7 GWh | Mar 2021 | Dec 2024 | Solar |
| Valley Sanitary District WTP Solar | Tesla Inc. | Indio, CA | Los Angeles Department of Water and Power (LDWP) | 1.4 GWh | Nov 2016 | Dec 2024 | Solar |
| Valley Center 2 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 11.4 GWh | Nov 2013 | Dec 2024 | Solar |
| Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2024 | Solar |
| Valley Center | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 4.7 GWh | Nov 2016 | Dec 2024 | Solar |
| Valley (CA) | Los Angeles Department of Water & Power | Sun Valley, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 TWh | Jul 2001 | Sep 2025 | Natural Gas |
| Vallecitos Water District | SSA Solar of CA 5, LLC | San Marcos, CA | California Independent System Operator (CISO) | 3.2 GWh | Aug 2021 | Dec 2024 | Solar |
| Valero Wilmington Cogeneration Plant | Valero Wilmington | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 228.2 GWh | Oct 2017 | Dec 2024 | Natural Gas |
| Valero Refinery Cogeneration Unit 1 | Valero Refining Co California | Benicia, CA | California Independent System Operator (CISO) | 275.4 GWh | Sep 2002 | Sep 2025 | Natural Gas : 87.7% Other Gas : 12.3% |
| Valentine Solar, LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 289.9 GWh | Oct 2019 | Sep 2025 | Solar |
| Valencia 3 | Greenbacker Renewable Energy Corporation | Imperial, CA | Imperial Irrigation District (IID) | 6.6 GWh | Mar 2021 | Dec 2024 | Solar |
| Valencia 2 | Greenbacker Renewable Energy Corporation | Imperial, CA | Imperial Irrigation District (IID) | 3.9 GWh | Nov 2020 | Dec 2024 | Solar |
| Valencia 1 Solar CA | Altus Power America Management, LLC | Westmorland, CA | Imperial Irrigation District (IID) | 6.7 GWh | Aug 2017 | Dec 2024 | Solar |
| Vacaville Hospital | KP Vacaville Solar, LLC | Vacaville, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2019 | Dec 2024 | Solar |
| Vaca Dixon Solar Station | Pacific Gas & Electric Co. | Vacaville, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2009 | Dec 2024 | Solar |
| VA Sepulveda Ambulatory Care Center | VA Sepulveda Ambulatory Care Center | North Hills, CA | Los Angeles Department of Water and Power (LDWP) | 3.9 GWh | Sep 2014 | Dec 2024 | Solar |
| USPS PV | Altus Power America Management, LLC | Los Angeles, CA | California Independent System Operator (CISO) | 10.1 GWh | Jun 2017 | Dec 2024 | Solar |
| USG 2 | ZGlobal Inc | El Centro, CA | Imperial Irrigation District (IID) | 2.0 GWh | Nov 2015 | Dec 2024 | Solar |
| USG 1 | ZGlobal Inc | El Centro, CA | Imperial Irrigation District (IID) | 3.0 GWh | Mar 2014 | Dec 2024 | Solar |
| US-TOPCO (Soccer Center) | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2016 | Dec 2024 | Solar |
| US GSA - Sacramento | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.0 GWh | Feb 2018 | Dec 2024 | Solar |
| US Borax | U S Borax Inc | Boron, CA | California Independent System Operator (CISO) | 279.4 GWh | Jun 1984 | Sep 2025 | Natural Gas |
| Upper Gorge | Los Angeles Department of Water & Power | Bishop, CA | Los Angeles Department of Water and Power (LDWP) | 99.9 GWh | May 1953 | Dec 2024 | Water |
| Upper Dawson | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 10.7 GWh | Oct 1983 | Dec 2024 | Water |
| University of the Pacific | The Greater Light USA LLC | Stockton, CA | California Independent System Operator (CISO) | 6.5 GWh | Apr 2022 | Dec 2024 | Solar |
| University of San Diego | Bloom Energy 2009 PPA | San Diego, CA | California Independent System Operator (CISO) | 8.2 GWh | Nov 2016 | Dec 2024 | Natural Gas |
| University of California Santa Cruz | University of California Santa Cruz | Santa Cruz, CA | California Independent System Operator (CISO) | 35.2 GWh | Aug 2013 | Dec 2024 | Natural Gas : 91.7% Solar : 8.3% |
| University of California San Diego Hybri | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 205.4 GWh | Jun 2001 | Sep 2025 | Natural Gas |
| Univ of San Francisco Cogen | University of San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 5.2 GWh | Aug 1987 | Dec 2024 | Natural Gas |
| Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2008 | Dec 2024 | Solar |
| Union Valley | Sacramento Municipal Util Dist | Fresh Pond, CA | Balancing Authority of Northern California (BANC) | 76.5 GWh | Sep 1963 | Dec 2024 | Water |
| UCLA So Campus Cogen Project | University of California-LA | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 179.0 GWh | Sep 1993 | Sep 2025 | Natural Gas |
| UCI Facilities Management Central Plant | University of California Irvine | Irvine, CA | California Independent System Operator (CISO) | 112.6 GWh | Jun 2007 | Sep 2025 | Natural Gas |
| UC Riverside Lots 30 & 32 | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2017 | Dec 2024 | Solar |
| UC Merced Solar Hybrid | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 6.5 GWh | Nov 2018 | Dec 2024 | Solar |
| UC Davis South Campus | Solar Star California XXXII, LLC | Davis, CA | California Independent System Operator (CISO) | 17.4 GWh | Feb 2015 | Dec 2024 | Solar |
| TWC | Bravo REC Management LLC | Tulare, CA | California Independent System Operator (CISO) | 918.0 MWh | Jul 2024 | Dec 2024 | Solar |
| Turlock Lake | Turlock Irrigation District | Hickman, CA | Turlock Irrigation District (TIDC) | 7.0 GWh | Jun 1980 | Dec 2024 | Water |
| Tulloch | Oakdale&South San Joaquin Irrigation D. | Jamestown, CA | California Independent System Operator (CISO) | 103.6 GWh | May 1958 | Dec 2024 | Water |
| Tule Wind LLC | Avangrid Power LLC | Boulevard, CA | California Independent System Operator (CISO) | 351.7 GWh | Nov 2017 | Sep 2025 | Wind |
| Tulare Success Power Project | Lower Tule River Irrgtn Dist | Porterville, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 1989 | Sep 2024 | Water |
| Tulare CSG LLC | Dimension Energy LLC | Tulare, CA | California Independent System Operator (CISO) | 375.0 MWh | Sep 2024 | Dec 2024 | Solar |
| Tulare BioMAT Fuel Cell | Central CA Fuel Cell 2, LLC | Tulare, CA | California Independent System Operator (CISO) | 13.7 GWh | Nov 2019 | Jul 2024 | Natural Gas : 63.4% Other Biomass Gas : 36.6% |
| Tulare Akers Professional Center | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2019 | Dec 2024 | Solar |
| Tulare 1 and 2 | Arevon Energy, Inc. | Tulare, CA | California Independent System Operator (CISO) | 5.3 GWh | Dec 2013 | Dec 2024 | Solar |
| Tropico Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 27.4 GWh | Aug 2016 | Dec 2024 | Solar |
| Trona Solar III | Trona Solar III LLC | Trona, CA | California Independent System Operator (CISO) | 4.5 GWh | Mar 2023 | Dec 2024 | Solar |
| Trinity | U S Bureau of Reclamation | Weaverville, CA | Balancing Authority of Northern California (BANC) | 549.3 GWh | Jan 1964 | Sep 2025 | Water |
| Transamerica Pyramid | Transamerica Pyramid Properties LLC | San Francisco, CA | California Independent System Operator (CISO) | 525.0 MWh | Jun 2007 | Dec 2023 | Natural Gas |
| Tranquillity ID | Tranquillity Solar 1, LLC | Tranquillity, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2018 | Dec 2024 | Solar |
| Tracy Combined Cycle Power Plant | MRP San Joaquin Energy LLC. | Tracy, CA | California Independent System Operator (CISO) | 1.0 TWh | Mar 2003 | Sep 2025 | Natural Gas |
| Tracy 210 | Costco Wholesale | Tracy, CA | California Independent System Operator (CISO) | 21.2 GWh | Feb 2019 | Dec 2024 | Natural Gas |
| TPC Windfarms LLC | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 46.5 GWh | Nov 1986 | Dec 2024 | Wind |
| Toyota Long Beach Trigen | Long Beach Trigen, LLC | Long Beach, CA | California Independent System Operator (CISO) | 16.8 GWh | Oct 2023 | Dec 2024 | Other Biomass Gas |
| Toyon Power Station | Toyon Landfill Gas Conversion, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 6.6 GWh | Dec 1985 | Dec 2024 | Landfill Gas |
| Total Energy Facilities | Los Angeles County Sanitation | Carson, CA | California Independent System Operator (CISO) | 160.8 GWh | Dec 1985 | Dec 2024 | Other Biomass Gas : 99.6% |
| Torrance Refining Company, LLC | Torrance Refining Company, LLC | Torrance, CA | California Independent System Operator (CISO) | 83.1 GWh | Aug 1983 | Sep 2025 | Other Gas : 74.7% Waste Heat : 25.3% |
| Topaz Solar Farm | Topaz Solar Farms LLC | Santa Margarita, CA | California Independent System Operator (CISO) | 1.0 TWh | Mar 2013 | Sep 2025 | Solar |
| Toadtown | Pacific Gas & Electric Co. | Magalia, CA | California Independent System Operator (CISO) | 2.4 GWh | Mar 1986 | Oct 2024 | Water |
| TLR000 Hansen Fuel Cell | 2016 ESA Project Company, LLC | Salinas, CA | California Independent System Operator (CISO) | 8.2 GWh | Aug 2018 | Dec 2024 | Natural Gas |
| Titan Solar 1 (CA) | Titan Solar 1, LLC | Borrego Springs, CA | California Independent System Operator (CISO) | 131.9 GWh | Nov 2020 | Sep 2025 | Solar |
| Tipton 2 - (CA) | Pacifico Power | Tipton, CA | California Independent System Operator (CISO) | 83.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Tipton 1 - (CA) | Pacifico Power | Tipton, CA | California Independent System Operator (CISO) | 167.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Tiger Creek | Pacific Gas & Electric Co. | Pioneer, CA | California Independent System Operator (CISO) | 225.1 GWh | May 1931 | Dec 2024 | Water |
| THUMS | THUMS Long Beach Company | Long Beach, CA | California Independent System Operator (CISO) | 206.9 GWh | Dec 2002 | Sep 2025 | Natural Gas |
| Three Forks Water Power Project | Grizzly Mountain Ranch | Zenia, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 1984 | Dec 2024 | Water |
| Thermalito Diverson Dam | California Dept. of Water Resources | Oroville, CA | California Independent System Operator (CISO) | 19.2 GWh | Jun 1987 | Dec 2024 | Water |
| Thermalito | California Dept. of Water Resources | Oroville, CA | California Independent System Operator (CISO) | 308.5 GWh | Jan 1968 | Sep 2025 | Water |
| Terry 1818-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 57.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Terra-Gen VG Wind LLC | Terra-Gen Operating Co-Wind | Tehachapi, CA | California Independent System Operator (CISO) | 7.6 GWh | Dec 1983 | Jun 2024 | Wind |
| Terra Francesco | Altus Power America Management, LLC | Ontario, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2015 | Dec 2024 | Solar |
| Terminus Hydroelectric Project | Eagle Creek Renewable Energy, LLC | Lemon Cove, CA | California Independent System Operator (CISO) | 42.2 GWh | Feb 1990 | Jun 2024 | Water |
| Tequesquite Landfill Solar PV Project | Solar Star California XXXI, LLC | Riverside, CA | California Independent System Operator (CISO) | 12.7 GWh | Sep 2015 | Dec 2024 | Solar |
| Temescal Canyon RV, LLC | Temescal Canyon RV, LLC | Corona, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2011 | Dec 2024 | Solar |
| Temescal | Metropolitan Water District of S CA | Corona, CA | California Independent System Operator (CISO) | 16.8 GWh | Jun 1983 | Dec 2024 | Water |
| Tejon Castac Water District Solar | CTMW Solar, LLC | Arvin, CA | California Independent System Operator (CISO) | 2.5 GWh | Apr 2024 | Dec 2024 | Solar |
| Teichert Materials-Teichert Vernalis | Foundation HA Energy Generation, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 1.9 GWh | Sep 2010 | Dec 2024 | Wind |
| Tehachapi Wind Resource II | CalWind Resources Inc | Tehachapi, CA | California Independent System Operator (CISO) | 46.1 GWh | Dec 1996 | Dec 2024 | Wind |
| Tehachapi Wind Resource I | CalWind Resources Inc | Tehachapi, CA | California Independent System Operator (CISO) | 14.1 GWh | Nov 1984 | Dec 2024 | Wind |
| Taylor Farms - Schilling Place | Bloom Energy | Salinas, CA | California Independent System Operator (CISO) | 8.5 GWh | Jun 2019 | Dec 2024 | Natural Gas |
Browse Power Plants By California Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.2 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| San Mateo County, CA | # 47 | 11 | 133.1 GWh |
| Yolo County, CA | # 46 | 15 | 216.2 GWh |
| Nevada County, CA | # 45 | 12 | 219.1 GWh |
| Siskiyou County, CA | # 44 | 8 | 236.7 GWh |
| Mariposa County, CA | # 43 | 2 | 299.7 GWh |
| San Benito County, CA | # 42 | 6 | 302.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 331.1 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Humboldt County, CA | # 39 | 10 | 467.8 GWh |
| Calaveras County, CA | # 38 | 6 | 513.9 GWh |
| Merced County, CA | # 37 | 31 | 522.8 GWh |
| Trinity County, CA | # 36 | 5 | 569.3 GWh |
| Amador County, CA | # 35 | 8 | 649.7 GWh |
| Ventura County, CA | # 34 | 32 | 756.5 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Lake County, CA | # 32 | 10 | 905.4 GWh |
| Madera County, CA | # 31 | 28 | 950.7 GWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Yuba County, CA | # 27 | 5 | 1.6 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Placer County, CA | # 24 | 24 | 2.0 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.2 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Monterey County, CA | # 17 | 29 | 3.2 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Butte County, CA | # 15 | 25 | 3.4 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.1 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| San Diego County, CA | # 12 | 151 | 5.1 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| Sacramento County, CA | # 10 | 65 | 6.4 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.8 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| Riverside County, CA | # 4 | 159 | 14.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.9 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Kern County, CA | # 1 | 313 | 34.9 TWh |