Tulare Success Power Project
29330 Highway 190, Porterville, CA 93257Plant Summary Information
Tulare Success Power Project is ranked #201 out of 207 hydroelectric power plants in California in terms of total annual net electricity generation.
Tulare Success Power Project is comprised of 1 generator and generated 1.2 GWh during the 3-month period between May 2025 to August 2025.
| Plant Name | Tulare Success Power Project |
|---|---|
| Utility Name | Lower Tule River Irrgtn Dist |
| Location | Tulare County, CA |
| Initial Operation Date | December 1989 |
| Last Update | Aug 2025 |
| Annual Generation | 1.3 GWh |
| Annual Consumption | 5.7 k MMBtu |
| Ranked #11,935 out of 13,285 Power Plants Nationwide | |
| Ranked #1,272 out of 1,316 Water Power Plants Nationwide | |
| Ranked #1,527 out of 1,641 California Power Plants | |
| Ranked #201 out of 207 California Water Power Plants | |
| Fuel Types | Water |
Map of Tulare Success Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tulare Success Power Project.
Monthly Net Generation for Tulare Success Power Project
Monthly Plant Fuel Consumption for Tulare Success Power Project
Tulare Success Power Project Details
| Summary Information | |
|---|---|
| Plant Name | Tulare Success Power Project (10222) |
| Plant Address | 29330 Highway 190, Porterville, CA 93257 |
| Utility | Lower Tule River Irrgtn Dist (11278) |
| Latitude, Longitude | 36.05864, -118.9241 |
| Generation Dates on File | Jan 2001 to Aug 2025 |
| Initial Operation Date | December 1989 |
| Annual Generation | 1.3 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 93-66-000 |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 93-66-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Lake Success |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator SPP1 Details Standby December 1989
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Jointly Owned |
| Nameplate Capacity | 1.4 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 1.4 MW |
| Winter Capacity | 1.4 MW |
| Minimum Load | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
|---|---|
| First Operation Date | December 1989 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Tulare Success Power Project Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Vandalia Irrigation District | 357 E. Olive Ave., Tipton, CA 93272 | 9.00% |
| Downstream Kaweah & Tule River Association | PO Box 877, Corcoran, CA 93212 | 11.00% |
| Pioneer Water Co | 357 E. Olive Ave., Tipton, CA 93272 | 9.00% |
| Porterville Irrigation District | PO Box 1248, Porterville, CA 93258 | 14.00% |
| Lower Tule River Irrigation District | 357 E. Olive Ave., Tipton, CA 93272 | 57.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1262 | Salida | Salida, CO | 1.7 GWh |
| #1263 | Bartholomew | Springville, UT | 1.6 GWh |
| #1264 | Prairie River | Grand Rapids, MN | 1.6 GWh |
| #1265 | Pelican | Pelican, AK | 1.7 GWh |
| #1266 | Waterman Turnout Hydroelectric | San Bernardino, CA | 1.6 GWh |
| #1267 | Hydro Plant No 3 | east of Ephraim, UT | 1.5 GWh |
| #1268 | C-Drop Hydro | Klamath Falls, OR | 1.5 GWh |
| #1269 | Taylor Draw Hydroelectric Facility | Rangely, CO | 1.5 GWh |
| #1270 | Oakdale Power Station | West Boylston, MA | 1.4 GWh |
| #1271 | Cavendish | Cavendish, VT | 1.4 GWh |
| #1273 | Diamond Valley Lake | Winchester, CA | 1.3 GWh |
| #1274 | French Paper Hydro | Niles, MI | 1.3 GWh |
| #1275 | EHC West Hopkinton | West Hopkinton, NH | 1.2 GWh |
| #1276 | McPhee | Cortez, CO | 1.2 GWh |
| #1277 | Humpback Creek | Cordova, AK | 1.2 GWh |
| #1278 | San Dimas Wash Generating Station | San Dimas, CA | 1.2 GWh |
| #1279 | Sprague Hydro | Bly, OR | 1.1 GWh |
| #1280 | Manti Lower | Manti, UT | 1.1 GWh |
| #1281 | Marshall (MI) | Marshall, MI | 638.0 MWh |
| #1282 | Normanskill Hydro Project | Guilderland, NY | 1.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tulare Success Power Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Castle Rock Vineyards | Delano, CA | 1.8 GWh | 20.6 mi |
| CED Ducor 1 | Ducor, CA | 52.3 GWh | 16.1 mi |
| CED Ducor 2 | Ducor, CA | 51.6 GWh | 16.9 mi |
| CED Ducor 3 | Ducor, CA | 38.4 GWh | 16.5 mi |
| CED Ducor 4 | Ducor, CA | 51.8 GWh | 15.5 mi |
| Deer Creek Hybrid | Terra Bella, CA | 16.5 GWh | 10.4 mi |
| Exeter Solar | Exeter, CA | 6.0 GWh | 18.4 mi |
| Farmersville | Farmersville, CA | 5.6 GWh | 14.2 mi |
| Lindsay Solar | Lindsay, CA | 6.8 GWh | 15.8 mi |
| Luciana | Richgrove, CA | 138.3 GWh | 18 mi |
| Nicolis Solar PV Plant | Delano, CA | 46.3 GWh | 17.1 mi |
| Porterville 6 and 7 | Porterville, CA | 4.2 GWh | 5.4 mi |
| Porterville Solar | Porterville, CA | 6.0 GWh | 7.1 mi |
| Rexford Solar Farm | Ducor, CA | 703.6 GWh | 17.5 mi |
| Solar Photovoltaic Project #42 | Tulare, CA | 6.4 GWh | 8.7 mi |
| South County Detention Center Solar | Porterville, CA | 2.4 GWh | 7.8 mi |
| Tipton 1 - (CA) | Tipton, CA | 7.9 GWh | 21.8 mi |
| Tipton 2 - (CA) | Tipton, CA | 2.7 GWh | 21.8 mi |
| Tropico Solar PV Plant | Delano, CA | 32.4 GWh | 17.3 mi |
| White River Solar 2 | Alpaugh, CA | 49.2 GWh | 14.4 mi |