Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Milan | Milan Energy LLC | Milan, PA | PJM Interconnection, LLC (PJM) | 41.4 GWh | Feb 2017 | Dec 2025 | Natural Gas |
| Milagro Solar I | Milagro Solar I, LLC | Santa Teresa, NM | El Paso Electric Company (EPE) | 356.9 GWh | Aug 2025 | Jun 2026 | Solar |
| Firebaugh-CCS-PV-1 | Mike Woolf Farming | Firebaugh, CA | California Independent System Operator (CISO) | 1.9 GWh | Feb 2015 | Dec 2025 | Solar |
| Green Acres Breeze LLC | Midwest Power Partners LLC | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Apr 2006 | Dec 2025 | Wind |
| Windom Wind Project | Midwest Power Partners LLC | Bingham Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 31.7 GWh | Feb 2006 | Dec 2025 | Wind |
| Blue Breezes LLC | Midwest Power Partners LLC | Blue Earth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Apr 2006 | Dec 2025 | Wind |
| Wolf Wind Enterprises LLC | Midwest Power Partners LLC | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Apr 2006 | Dec 2025 | Wind |
| G Flow Wind LLC | Midwest Power Partners LLC | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Apr 2006 | Dec 2025 | Wind |
| Minnesota Breeze LLC | Midwest Power Partners LLC | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Apr 2006 | Dec 2025 | Wind |
| Sunset Breeze LLC | Midwest Power Partners LLC | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Apr 2006 | Dec 2025 | Wind |
| Blue Breezes II LLC | Midwest Power Partners LLC | Blue Earth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Apr 2006 | Dec 2025 | Wind |
| Fisk Street | Midwest Generations EME LLC | Chicago, IL | PJM Interconnection, LLC (PJM) | 2.7 GWh | Jun 1968 | Dec 2025 | Distillate Fuel Oil |
| Powerton | Midwest Generations EME LLC | Pekin, IL | PJM Interconnection, LLC (PJM) | 3.2 TWh | Aug 1972 | Jun 2026 | Subbituminous Coal : 99.8% |
| Colby | Midwest Energy Inc - (KS) | Colby, KS | Southwest Power Pool (SWPP) | 1.2 GWh | Dec 1969 | Dec 2024 | Natural Gas |
| Goodman Energy Center | Midwest Energy Inc - (KS) | Hays, KS | Southwest Power Pool (SWPP) | 83.2 GWh | May 2008 | Dec 2025 | Natural Gas |
| Midwest Energy Community Solar Array | Midwest Energy Inc - (KS) | Colby, KS | Southwest Power Pool (SWPP) | 1.8 GWh | Jan 2015 | Jun 2026 | Solar |
| Midway Sunset Cogen | Midway-Sunset Cogeneration Co | Fellows, CA | California Independent System Operator (CISO) | 6.0 GWh | Apr 1989 | Apr 2026 | Natural Gas |
| Midway Wind, LLC | Midway Wind, LLC | Taft, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 396.8 GWh | Jul 2019 | Jun 2026 | Wind |
| Midway Solar - TX | Midway Solar | Fort Stockton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 299.7 GWh | Nov 2018 | Jun 2026 | Solar |
| Midway Green Solar | Midway Green Solar, LLC | Union, SC | Duke Energy Carolinas (DUK) | 20.5 GWh | Nov 2020 | Dec 2025 | Solar |
| Midlothian Energy Facility | Midlothian Energy LLC | Midlothian, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 7.2 TWh | Apr 2000 | Jun 2026 | Natural Gas |
| Midland Cogeneration Venture | Midland Cogeneration Venture | Midland, MI | Midcontinent Independent System Operator, Inc. (MISO) | 9.8 TWh | May 1989 | Jun 2026 | Natural Gas |
| Middletown | Middletown Power LLC | Middletown, CT | ISO New England (ISNE) | 33.0 GWh | Sep 1958 | Dec 2024 | Residual Fuel Oil : 60.6% Natural Gas : 39.3% |
| Middletown NY 1 | Middletown NY 1, LLC | Middletown, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Feb 2020 | Dec 2025 | Solar |
| Middleton Biogas Solar, LLC | Middleton Biogas Solar, LLC | Middleton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2022 | Dec 2025 | Solar |
| Middlesex County Utilities Authority | Middlesex County Utilities Authority - (NJ) | Sayreville, NJ | PJM Interconnection, LLC (PJM) | 107.4 GWh | Dec 1960 | Jun 2026 | Landfill Gas |
| Middlebury College | Middlebury College Biomass | Middlebury, VT | ISO New England (ISNE) | 1.7 GWh | Dec 1979 | Jun 2026 | Wood/Wood Waste Solids : 58.5% Natural Gas : 41.5% |
| MTSU Power Co-Gen Plant | Middle Tennessee State University | Murfreesboro, TN | Tennessee Valley Authority (TVA) | 34.0 GWh | Jun 1997 | Jun 2026 | Natural Gas |
| Big Sandy Peaker Plant | Middle River Power II, LLC | Kenona, WV | PJM Interconnection, LLC (PJM) | 329.8 GWh | Jun 2001 | Dec 2025 | Natural Gas |
| Wolf Hills Energy | Middle River Power II, LLC | Bristol, VA | PJM Interconnection, LLC (PJM) | 287.0 GWh | Apr 2001 | Dec 2025 | Natural Gas |
| Middle Fork Irrigation District | Middle Fork Irrigation Dist | Parkdale, OR | Bonneville Power Administration (BPAT) | 20.0 GWh | Feb 1986 | Dec 2025 | Water |
| Midcontinent Solar, LLC | Midcontinent Solar, LLC | Owosso, MI | Midcontinent Independent System Operator, Inc. (MISO) | 37.6 GWh | Sep 2023 | Dec 2025 | Solar |
| Neal Energy Center Solar | MidAmerican Energy Co | Salix, IA | Midcontinent Independent System Operator, Inc. (MISO) | 7.4 GWh | Jan 2022 | Dec 2024 | Solar |
| Charles City Wind Farm | MidAmerican Energy Co | Charles City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 267.7 GWh | Mar 2008 | Dec 2025 | Wind |
| Victory Wind Farm | MidAmerican Energy Co | Westside, IA | Midcontinent Independent System Operator, Inc. (MISO) | 384.1 GWh | Nov 2006 | Dec 2025 | Wind |
| Pomeroy Wind Farm | MidAmerican Energy Co | Fonda, IA | Midcontinent Independent System Operator, Inc. (MISO) | 968.3 GWh | Nov 2007 | Jun 2026 | Wind |
| Walnut Wind Farm | MidAmerican Energy Co | Walnut, IA | Midcontinent Independent System Operator, Inc. (MISO) | 558.3 GWh | Nov 2008 | Dec 2025 | Wind |
| Adair Wind Farm | MidAmerican Energy Co | Adair, IA | Midcontinent Independent System Operator, Inc. (MISO) | 551.2 GWh | Nov 2008 | Dec 2025 | Wind |
| Carroll Wind Farm | MidAmerican Energy Co | Carroll, IA | Midcontinent Independent System Operator, Inc. (MISO) | 556.6 GWh | Nov 2008 | Dec 2025 | Wind |
| Century | MidAmerican Energy Co | Blairsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 608.9 GWh | Aug 2005 | Dec 2025 | Wind |
| Intrepid | MidAmerican Energy Co | Schaller, IA | Midcontinent Independent System Operator, Inc. (MISO) | 546.4 GWh | Nov 2004 | Dec 2025 | Wind |
| Contrail Wind Farm | MidAmerican Energy Co | Bedford, IA | Midcontinent Independent System Operator, Inc. (MISO) | 343.0 GWh | Nov 2020 | Jun 2026 | Wind |
| Southern Hills Wind Farm | MidAmerican Energy Co | Creston, IA | Midcontinent Independent System Operator, Inc. (MISO) | 812.8 GWh | Feb 2021 | Jun 2026 | Wind |
| Diamond Trail Wind Farm | MidAmerican Energy Co | Ladora, IA | Midcontinent Independent System Operator, Inc. (MISO) | 854.1 GWh | Nov 2020 | Jun 2026 | Wind |
| Palo Alto Wind Farm | MidAmerican Energy Co | Emmetsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 TWh | Dec 2019 | Jun 2026 | Wind |
| Pleasant Hill | MidAmerican Energy Co | Pleasant Hill, IA | Midcontinent Independent System Operator, Inc. (MISO) | 48.7 GWh | May 1990 | Dec 2025 | Natural Gas |
| Electrifarm | MidAmerican Energy Co | Waterloo, IA | Midcontinent Independent System Operator, Inc. (MISO) | 16.7 GWh | Apr 1975 | Dec 2025 | Natural Gas |
| Louisa | MidAmerican Energy Co | Muscatine, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 TWh | Sep 1983 | Jun 2026 | Subbituminous Coal : 99.4% Natural Gas : 0.6% |
| Chickasaw Wind Farm | MidAmerican Energy Co | New Hampton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 641.2 GWh | Nov 2023 | Jun 2026 | Wind |
| Wellsburg Wind Project | MidAmerican Energy Co | Wellsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 304.8 GWh | Nov 2014 | Dec 2025 | Wind |
| Macksburg Wind Project | MidAmerican Energy Co | Macksburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 248.7 GWh | Nov 2014 | Dec 2025 | Wind |
| Lundgren Wind Project | MidAmerican Energy Co | Otho, IA | Midcontinent Independent System Operator, Inc. (MISO) | 604.9 GWh | Jul 2014 | Dec 2025 | Wind |
| Highland Wind Project (IA) | MidAmerican Energy Co | Primghar, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.0 TWh | May 2015 | Jun 2026 | Wind |
| Adams Wind | MidAmerican Energy Co | Lenox, IA | Midcontinent Independent System Operator, Inc. (MISO) | 460.4 GWh | Sep 2015 | Dec 2025 | Wind |
| Ivester Wind Farm | MidAmerican Energy Co | Wellsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 324.8 GWh | Nov 2018 | Jun 2026 | Wind |
| Ida Grove II | MidAmerican Energy Co | Ida Grove, IA | Midcontinent Independent System Operator, Inc. (MISO) | 696.1 GWh | Nov 2019 | Jun 2026 | Wind |
| North English | MidAmerican Energy Co | Montezuma, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 TWh | Nov 2018 | Jun 2026 | Wind |
| Arbor Hill Wind Farm | MidAmerican Energy Co | Greenfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 TWh | Nov 2018 | Jun 2026 | Wind |
| Ida Grove Wind | MidAmerican Energy Co | Ida Grove, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 TWh | Aug 2016 | Dec 2025 | Wind |
| O'Brien Wind | MidAmerican Energy Co | Primghar, IA | Midcontinent Independent System Operator, Inc. (MISO) | 851.2 GWh | Aug 2016 | Dec 2025 | Wind |
| George Neal North | MidAmerican Energy Co | Sergeant Bluff, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 TWh | Apr 1964 | Jun 2026 | Subbituminous Coal : 98.6% Natural Gas : 1.4% |
| River Hills | MidAmerican Energy Co | Des Moines, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Apr 1966 | Dec 2025 | Natural Gas |
| Walter Scott Jr Energy Center | MidAmerican Energy Co | Council Bluffs, IA | Midcontinent Independent System Operator, Inc. (MISO) | 7.3 TWh | Feb 1954 | Jun 2026 | Subbituminous Coal : 99.3% Distillate Fuel Oil : 0.6% |
| Coralville GT | MidAmerican Energy Co | Coralville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | May 1970 | Dec 2025 | Natural Gas |
| Moline | MidAmerican Energy Co | Moline, IL | Midcontinent Independent System Operator, Inc. (MISO) | 20.8 GWh | Dec 1941 | Dec 2025 | Water : 97.0% Natural Gas : 3.0% |
| Merl Parr | MidAmerican Energy Co | Charles City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Apr 1969 | Dec 2025 | Natural Gas |
| Orient Wind Farm | MidAmerican Energy Co | Orient, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 TWh | Nov 2018 | Jun 2026 | Wind |
| Prairie Wind Farm | MidAmerican Energy Co | Montezuma, IA | Midcontinent Independent System Operator, Inc. (MISO) | 613.7 GWh | Dec 2017 | Jun 2026 | Wind |
| Beaver Creek Wind | MidAmerican Energy Co | Ogden, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 TWh | Nov 2017 | Jun 2026 | Wind |
| Shenandoah Hills Wind Farm | MidAmerican Energy Co | Blanchard, IA | Midcontinent Independent System Operator, Inc. (MISO) | 376.5 GWh | Nov 2025 | Jun 2026 | Wind |
| Pocahontas Prairie Wind Farm | MidAmerican Energy Co | Pomeroy, IA | Midcontinent Independent System Operator, Inc. (MISO) | 373.5 GWh | Jan 2012 | Dec 2025 | Wind |
| Eclipse Wind Farm | MidAmerican Energy Co | Adair, IA | Midcontinent Independent System Operator, Inc. (MISO) | 825.0 GWh | Aug 2012 | Jun 2026 | Wind |
| Vienna Wind Farm | MidAmerican Energy Co | Marshalltown, IA | Midcontinent Independent System Operator, Inc. (MISO) | 621.7 GWh | Oct 2012 | Dec 2025 | Wind |
| Morning Light Wind Farm | MidAmerican Energy Co | Adair, IA | Midcontinent Independent System Operator, Inc. (MISO) | 406.8 GWh | Sep 2012 | Dec 2025 | Wind |
| Rolling Hills Wind Farm | MidAmerican Energy Co | Massena, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 TWh | Nov 2011 | Jun 2026 | Wind |
| Laurel Wind Farm | MidAmerican Energy Co | Laurel, IA | Midcontinent Independent System Operator, Inc. (MISO) | 470.0 GWh | Nov 2011 | Dec 2025 | Wind |
| Sycamore (IA) | MidAmerican Energy Co | Johnston, IA | Midcontinent Independent System Operator, Inc. (MISO) | 30.5 GWh | Jul 1974 | Dec 2025 | Natural Gas |
| George Neal South | MidAmerican Energy Co | Salix, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 TWh | Jun 1979 | Jun 2026 | Subbituminous Coal : 99.0% Distillate Fuel Oil : 1.0% |
| Greater Des Moines | MidAmerican Energy Co | Pleasant Hill, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 TWh | Apr 2003 | Dec 2025 | Natural Gas |
| Waterloo Lundquist | MidAmerican Energy Co | Waterloo, IA | Midcontinent Independent System Operator, Inc. (MISO) | 255.0 MWh | Mar 2000 | Dec 2025 | Distillate Fuel Oil |
| Shenandoah | MidAmerican Energy Co | Shenandoah, IA | Midcontinent Independent System Operator, Inc. (MISO) | 323.0 MWh | Mar 2000 | Dec 2025 | Distillate Fuel Oil |
| Knoxville Industrial | MidAmerican Energy Co | Knoxville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 225.0 MWh | Mar 2000 | Dec 2025 | Distillate Fuel Oil |
| Franklin County Solar | MidAmerican Energy Co | Hampton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 13.2 GWh | Dec 2021 | Dec 2025 | Solar |
| Arbor Hill Solar | MidAmerican Energy Co | Greenfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 45.6 GWh | Dec 2021 | Jun 2026 | Solar |
| Johnson County Hills Solar | MidAmerican Energy Co | Iowa City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.7 GWh | Dec 2021 | Dec 2025 | Solar |
| Waterloo Solar (IA) | MidAmerican Energy Co | Waterloo, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.7 GWh | Feb 2022 | Dec 2025 | Solar |
| Plymouth Wind | MidAmerican Energy Co | Remsen, IA | Midcontinent Independent System Operator, Inc. (MISO) | 766.9 GWh | Dec 2021 | Jun 2026 | Wind |
| Holliday Creek Solar | MidAmerican Energy Co | Fort Dodge, IA | Midcontinent Independent System Operator, Inc. (MISO) | 206.4 GWh | Jun 2022 | Jun 2026 | Solar |
| Michigan Wind 2 | Michigan Wind 2, LLC | Minden City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 329.1 GWh | Nov 2011 | Dec 2025 | Wind |
| Michigan Wind 1 | Michigan Wind 1, LLC | Ubly, MI | Midcontinent Independent System Operator, Inc. (MISO) | 164.9 GWh | Nov 2008 | Dec 2025 | Wind |
| MSC Sebewaing | Michigan Sugar Company | Sebewaing, MI | Midcontinent Independent System Operator, Inc. (MISO) | 509.0 MWh | Sep 1979 | Mar 2026 | Bituminous Coal : 67.9% Natural Gas : 32.1% |
| MSC Croswell | Michigan Sugar Company | Croswell, MI | Midcontinent Independent System Operator, Inc. (MISO) | 35.9 MWh | Sep 1948 | Jan 2025 | Natural Gas |
| T B Simon Power Plant | Michigan State University | East Lansing, MI | Midcontinent Independent System Operator, Inc. (MISO) | 271.0 GWh | Nov 1965 | Jun 2026 | Natural Gas |
| Kalkaska CT #1 | Michigan Public Power Agency | Kalkaska, MI | Midcontinent Independent System Operator, Inc. (MISO) | 57.6 GWh | Nov 2002 | Dec 2025 | Natural Gas |
| Michigan Power LP | Michigan Power Limited Partnership | Ludington, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 TWh | Sep 1995 | Dec 2024 | Natural Gas |
| Michelangelo Wind 3 LLC | Michelangelo Wind 3 LLC | Huxley, IA | Midcontinent Independent System Operator, Inc. (MISO) | 9.9 GWh | Jan 2017 | Dec 2025 | Wind |
| South District Wastewater Treatment Plt | Miami Dade Water & Sewer Dept | Miami, FL | Florida Power & Light Co. (FPL) | 20.5 GWh | Feb 1991 | Jun 2026 | Natural Gas : 50.2% Other Biomass Gas : 49.8% |
| MF Mesa Lane LLC | MF Mesa Lane LLC | Morrisville, PA | PJM Interconnection, LLC (PJM) | 3.4 GWh | Oct 2008 | Dec 2024 | Solar |
| MEVS Waterhouse | MEVS LLC | Scarborogh, ME | ISO New England (ISNE) | 3.1 GWh | Nov 2024 | Dec 2025 | Solar |
| MEVS DOT 109 | MEVS DOT, LLC | Augusta, ME | ISO New England (ISNE) | 3.5 GWh | Jun 2023 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on June 2026 generation numbers.| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 77 | 12,594.28 GWh |
| Alaska | # 48 | 140 | 563.53 GWh |
| Arizona | # 11 | 199 | 11,138.97 GWh |
| Arkansas | # 21 | 117 | 6,425.86 GWh |
| California | # 4 | 1,744 | 17,197.11 GWh |
| Colorado | # 29 | 309 | 4,933.21 GWh |
| Connecticut | # 34 | 173 | 3,737.86 GWh |
| Delaware | # 49 | 35 | 376.53 GWh |
| District of Columbia | # 51 | 17 | 18.29 GWh |
| Florida | # 2 | 342 | 26,309.59 GWh |
| Georgia | # 7 | 250 | 13,880.75 GWh |
| Hawaii | # 47 | 70 | 767.91 GWh |
| Idaho | # 41 | 152 | 2,099.32 GWh |
| Illinois | # 5 | 494 | 16,673.62 GWh |
| Indiana | # 18 | 222 | 8,401.10 GWh |
| Iowa | # 23 | 297 | 6,139.01 GWh |
| Kansas | # 25 | 188 | 5,758.25 GWh |
| Kentucky | # 22 | 61 | 6,181.49 GWh |
| Louisiana | # 15 | 90 | 9,779.36 GWh |
| Maine | # 45 | 242 | 1,215.46 GWh |
| Maryland | # 36 | 228 | 3,591.08 GWh |
| Massachusetts | # 44 | 666 | 1,410.23 GWh |
| Michigan | # 14 | 276 | 9,804.74 GWh |
| Minnesota | # 30 | 790 | 4,889.70 GWh |
| Mississippi | # 20 | 60 | 6,899.16 GWh |
| Missouri | # 24 | 129 | 6,066.44 GWh |
| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,225.73 GWh |
| Nebraska | # 39 | 126 | 3,184.64 GWh |
| Nevada | # 31 | 117 | 4,654.59 GWh |
| New Hampshire | # 43 | 57 | 1,659.52 GWh |
| New Jersey | # 28 | 398 | 5,055.63 GWh |
| New Mexico | # 33 | 159 | 4,408.01 GWh |
| New York | # 10 | 1,064 | 11,564.60 GWh |
| North Carolina | # 8 | 913 | 12,773.20 GWh |
| North Dakota | # 35 | 59 | 3,713.80 GWh |
| Ohio | # 6 | 213 | 13,969.06 GWh |
| Oklahoma | # 17 | 144 | 9,156.03 GWh |
| Oregon | # 27 | 281 | 5,322.08 GWh |
| Pennsylvania | # 3 | 259 | 21,018.65 GWh |
| Rhode Island | # 46 | 107 | 854.92 GWh |
| South Carolina | # 16 | 209 | 9,442.42 GWh |
| South Dakota | # 42 | 53 | 1,803.66 GWh |
| Tennessee | # 19 | 99 | 7,036.17 GWh |
| Texas | # 1 | 1,028 | 57,844.67 GWh |
| Utah | # 38 | 129 | 3,196.09 GWh |
| Vermont | # 50 | 118 | 180.62 GWh |
| Virginia | # 12 | 250 | 10,352.13 GWh |
| Washington | # 13 | 135 | 10,051.77 GWh |
| West Virginia | # 32 | 41 | 4,489.44 GWh |
| Wisconsin | # 26 | 266 | 5,542.48 GWh |
| Wyoming | # 37 | 69 | 3,318.53 GWh |