Milligan 1 Wind Farm is ranked #8 out of 124 power plants in Nebraska in terms of total annual net electricity generation.
Milligan 1 Wind Farm generated 168.8 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Milligan 1 Wind Farm |
|---|---|
| Utility Name | Milligan 1 Wind, LLC |
| Location | Saline County, NE |
| Initial Operation Date | December 2020 |
| Last Update | Aug 2026 |
| Annual Generation | 982.3 GWh |
| Annual Consumption | 3.5 M MMBtu |
| Ranked #767 out of 13,301 Power Plants Nationwide | |
| Ranked #74 out of 1,377 Wind Power Plants Nationwide | |
| Ranked #8 out of 124 Nebraska Power Plants | |
| Ranked #3 out of 33 Nebraska Wind Power Plants | |
| Fuel Types | Wind |
Map of Milligan 1 Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Milligan 1 Wind Farm.
Monthly Net Generation for Milligan 1 Wind Farm
Monthly Plant Fuel Consumption for Milligan 1 Wind Farm
Milligan 1 Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Milligan 1 Wind Farm (64377) |
| Plant Address | 1003 County Rd M, Western, NE 68464 |
| Utility | Milligan 1 Wind, LLC (63993) |
| Latitude, Longitude | 40.47862, -97.22057 |
| Generation Dates on File | Nov 2020 to Aug 2026 |
| Initial Operation Date | December 2020 |
| Annual Generation | 982.3 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG20-96-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Nebraska Public Power District (13337) NE |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator SG275 Details Operating December 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 99 MW |
| Summer Capacity | 99 MW |
| Winter Capacity | 99 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 36 |
| Turbine Details | |
| Number Of Turbines | 36 |
|---|---|
| Predominant Turbine Manufacturer | Siemens Gamesa |
| Predominant Turbine Model Number | SWT-2.415-108 |
| Design Wind Speed | 18.1 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 285.4 |
Generator V110 Details Operating December 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 66 MW |
| Summer Capacity | 66 MW |
| Winter Capacity | 66 MW |
| Minimum Load | 1.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 33 |
| Turbine Details | |
| Number Of Turbines | 33 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V110-2.0 |
| Design Wind Speed | 18.1 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.5 |
Generator SG4.5 Details Operating March 2021
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 135 MW |
| Summer Capacity | 135 MW |
| Winter Capacity | 135 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 30 |
| Turbine Details | |
| Number Of Turbines | 30 |
|---|---|
| Predominant Turbine Manufacturer | Siemens Gamesa |
| Predominant Turbine Model Number | SG 4.5-145 |
| Design Wind Speed | 16 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 345 |
Milligan 1 Wind Farm Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #64 | Priddy Wind Project | Goldthwaite, TX | 1.0 TWh |
| #65 | Thunder Ranch Wind Project | Marland, OK | 1.0 TWh |
| #66 | Rock Creek Wind Project | Tarkio, MO | 1.0 TWh |
| #67 | Skeleton Creek Energy Center Hybrid | Carrier, OK | 1.5 TWh |
| #68 | Triple H Wind Project | Highmore, SD | 1.0 TWh |
| #69 | Lincoln Land Wind | TBD, IL | 1.0 TWh |
| #70 | Dakota Range Wind | Marvin, SD | 1.0 TWh |
| #71 | Caddo Wind | Apache, OK | 1.0 TWh |
| #72 | BMP Wind (TX) | Baird, TX | 998.6 GWh |
| #73 | Roadrunner Wind Farm | Cisco, TX | 996.9 GWh |
| #75 | Solomon Forks Wind Project, LLC | Colby, KS | 980.1 GWh |
| #76 | Great Western Wind Energy, LLC | Arnett, OK | 976.5 GWh |
| #77 | Radfords Run Wind Farm | Maroa, IL | 972.0 GWh |
| #78 | Maverick Wind Project, LLC | Lahoma, OK | 971.3 GWh |
| #79 | Sapphire Sky Wind Energy LLC | Farmer City, IL | 969.6 GWh |
| #80 | Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 966.5 GWh |
| #81 | Pomeroy Wind Farm | Fonda, IA | 961.5 GWh |
| #82 | Nobles 2 Wind Project | Wilmont, MN | 958.3 GWh |
| #83 | Diamond Vista Wind Project, LLC | Tampa, KS | 955.3 GWh |
| #84 | Mohave County Wind Farm | Willow Beach, AZ | 951.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Milligan 1 Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Archer Daniels Midland Lincoln | Lincoln, NE | 44.9 GWh | 41.6 mi |
| Beatrice | Beatrice, NE | 356.4 GWh | 24 mi |
| Centerville (NE) | Roca, NE | 2.2 GWh | 27.9 mi |
| Crete | Crete, NE | 389.0 MWh | 17 mi |
| Deshler | Deshler, NE | 2.0 MWh | 35.3 mi |
| Deshler Solar | Hebron, NE | 2.4 GWh | 37.3 mi |
| Hallam | Hallam, NE | 1.4 GWh | 23.5 mi |
| Hebron | Hebron, NE | 2.5 GWh | 27.5 mi |
| High Banks Wind | Belleville, KS | 2.5 TWh | 47.1 mi |
| Holdrege Solar Center | Lincoln, NE | 5.4 GWh | 31.8 mi |
| J Street | Lincoln, NE | 226.1 MWh | 35.1 mi |
| Mobile | York, NE | 29.0 MWh | 34.3 mi |
| Perennial Windfarm | Fairmont, NE | 32.8 GWh | 24.6 mi |
| Rokeby | Lincoln, NE | 13.3 GWh | 30.8 mi |
| Ruby-Norris | Milford, NE | 2.2 GWh | 25.3 mi |
| Seward Wind Farm | Seward, NE | 6.3 GWh | 28.8 mi |
| Sheldon | Hallam, NE | 763.0 GWh | 23.6 mi |
| Steele Flats Wind Project LLC | Diller, NE | 358.6 GWh | 32.9 mi |
| Terry Bundy Generating Station | Lincoln, NE | 148.4 GWh | 43.6 mi |
| Wilber | Wilber, NE | 14.0 MWh | 13.7 mi |