Lakewood Cheddar School
725 Vassar Ave, Lakewood, NJ 8701Plant Summary Information
Lakewood Cheddar School is ranked #304 out of 316 solar farms in New Jersey in terms of total annual net electricity generation.
Lakewood Cheddar School generated 149.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Lakewood Cheddar School |
---|---|
Utility Name | MN8 Energy LLC |
Location | Ocean County, NJ |
Initial Operation Date | January 2013 |
Last Update | Dec 2024 |
Annual Generation | 676.0 MWh |
Annual Consumption | 2.3 k MMBtu |
Ranked #11,349 out of 12,288 Power Plants Nationwide | |
Ranked #5,994 out of 6,174 Solar Power Plants Nationwide | |
Ranked #365 out of 377 New Jersey Power Plants | |
Ranked #304 out of 316 New Jersey Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
GSRP (2018 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2024) |
Map of Lakewood Cheddar School
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lakewood Cheddar School.
Monthly Net Generation for Lakewood Cheddar School
Lakewood Cheddar School Details
Summary Information | |
---|---|
Plant Name | Lakewood Cheddar School (62454) |
Plant Address | 725 Vassar Ave, Lakewood, NJ 8701 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 40.0709, -74.1808 |
Generation Dates on File | Jan 2019 to Dec 2024 |
Initial Operation Date | January 2013 |
Annual Generation | 676.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 18-2029 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Jersey Central Power & Lt Co (9726) NJ |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1 Details Operating January 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2013 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 171 |
Tilt Angle | 15 |
DC Net Capacity | 1.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.1 MW |
Virtual Net Metering Agreement | No |
Lakewood Cheddar School Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5984 | Mt Pleasant Community Center | Valhalla, NY | 718.0 MWh |
#5985 | SunEdison Walmart Apple Valley DC | Apple Valley, CA | 716.0 MWh |
#5986 | Niagara Solar Project | Randomville, NY | 701.0 MWh |
#5987 | Overland | Hudson, CO | 698.0 MWh |
#5988 | PPL Renewable Energy Merck Solar | Summit, NJ | 691.0 MWh |
#5989 | Red Lake Falls Community Hybrid | Red Lake Falls, MN | 14.0 GWh |
#5990 | Marshall Solar Plus LLC | Marshall, MN | 539.0 MWh |
#5991 | Brentwood Solar | Brentwood, NY | 687.0 MWh |
#5992 | Blue Moon Farms | Tipton, CA | 683.0 MWh |
#5993 | Wild Horse | Ellensburg, WA | 631.0 GWh |
#5995 | Spring Lane | Ligonier, PA | 667.0 MWh |
#5996 | Bloomington Solar I | St George, UT | 667.0 MWh |
#5997 | Golden Springs Building D | Santa Fe Springs, CA | 651.0 MWh |
#5998 | Copperton Solar Plant No. 1 | Bingham Canyon, UT | 648.0 MWh |
#5999 | UMass Boston | Dorchester, MA | 659.0 MWh |
#6000 | SV CSG AFTON I | Afton, MN | 642.0 MWh |
#6001 | CFW Solar X LLC - Vaughn | San Fernando, CA | 642.0 MWh |
#6002 | Antelope Creek | Eagle Point, OR | 641.0 MWh |
#6003 | Highland Park Borough Solar | Highland Park, NJ | 635.0 MWh |
#6004 | Prosperity Energy Storage Facility Hybri | Albuquerque, NM | 629.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lakewood Cheddar School.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bayville Central Facility | Bayville, NJ | 2.5 GWh | 11.2 mi |
Brickyard Solar | Farmingdale, NJ | 1.8 GWh | 8.3 mi |
EDF Ph1 Toms River | Tom's River, NJ | 37.9 GWh | 6.7 mi |
French's Landfill PV | Brick, NJ | 5.3 GWh | 3.8 mi |
Galloway Landfill | Wall, NJ | 4.6 GWh | 10.9 mi |
Howell (Lowes) | Howell, NJ | 1.0 GWh | 4.5 mi |
Howell Solar | Howell, NJ | 9.9 GWh | 5.3 mi |
Jackson Board of Education-Liberty HS | Jackson, NJ | 1.8 GWh | 4.5 mi |
Jackson Legler Solar 1 LLC | Jackson Township, NJ | 5.1 GWh | 9 mi |
Lakehurst Solar | Lakehurst, NJ | 17.8 GWh | 7.7 mi |
NAEA Lakewood LLC | Lakewood, NJ | 227.2 GWh | 0.9 mi |
NAEA Ocean Peaking Power LLC | Lakewood, NJ | 188.2 GWh | 0.9 mi |
NES Rutgers Solar | Lakewood, NJ | 1.1 GWh | 1 mi |
Ocean County Landfill | Manchester, NJ | 64.3 GWh | 4.9 mi |
Rock Solid | Howell, NJ | 12.8 GWh | 11.2 mi |
Seabrook Village | Tinton Falls, NJ | 4.5 GWh | 12.3 mi |
Spano Solar - Belmar Wall | Belmar, NJ | 2.0 GWh | 8.8 mi |
Spano Solar - Ocean County Landfill - CS | Manchester Township, NJ | 4.2 GWh | 4.8 mi |
Tom's River (Lowes) | Toms River, NJ | 1.3 GWh | 5.7 mi |
Toms River CSG | Toms River, NJ | 6.5 GWh | 6.5 mi |