Macon Solar Power Project
3007 Kellogg Avenue, Macon, MO 63552Plant Summary Information
Macon Solar Power Project is ranked #28 out of 36 solar farms in Missouri in terms of total annual net electricity generation.
Macon Solar Power Project generated 631.0 MWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Macon Solar Power Project |
|---|---|
| Utility Name | Missouri Jnt Muni.Pwr Elec. Ut. Comm. |
| Location | Macon County, MO |
| Initial Operation Date | June 2015 |
| Last Update | Feb 2026 |
| Annual Generation | 4.0 GWh |
| Annual Consumption | 14.5 k MMBtu |
| Ranked #8,660 out of 12,637 Power Plants Nationwide | |
| Ranked #3,682 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #89 out of 127 Missouri Power Plants | |
| Ranked #28 out of 36 Missouri Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
MC Power Companies Inc (2014 to 2021) Missouri Jnt Muni.Pwr Elec. Ut. Comm. (2022 to 2024) |
Map of Macon Solar Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Macon Solar Power Project.
Monthly Net Generation for Macon Solar Power Project
Monthly Plant Fuel Consumption for Macon Solar Power Project
Macon Solar Power Project Details
| Summary Information | |
|---|---|
| Plant Name | Macon Solar Power Project (59729) |
| Plant Address | 3007 Kellogg Avenue, Macon, MO 63552 |
| Utility | Missouri Jnt Muni.Pwr Elec. Ut. Comm. (12670) |
| Latitude, Longitude | 39.76, -92.46 |
| Generation Dates on File | Jun 2015 to Feb 2026 |
| Initial Operation Date | June 2015 |
| Annual Generation | 4.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF15-538-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Macon - (MO) (11460) MO |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator MSF1 Details Operating June 2015
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 2.8 MW |
| Summer Capacity | 2.8 MW |
| Winter Capacity | 2.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2015 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 30 |
| DC Net Capacity | 3.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Macon Solar Power Project Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| MPUA | 2200 Maguire Blvd,, Columbia, MO 65201 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3672 | Eddy | Williamson, NY | 4.0 GWh |
| #3673 | Maple Solar | Vineland, NJ | 4.0 GWh |
| #3674 | SSD Marion 3, LLC | Salem, OR | 4.0 GWh |
| #3675 | Norton LLC | Norton, MA | 4.0 GWh |
| #3676 | Kinston | Kinston, NC | 4.0 GWh |
| #3677 | DG Harlem Solar | Freeport, IL | 4.0 GWh |
| #3678 | Hazel Solar, LLC | Howard City, MI | 4.0 GWh |
| #3679 | Berkley | Berkley, MA | 4.0 GWh |
| #3680 | Bunker Hill Solar | Lyndon, IL | 4.0 GWh |
| #3681 | Blue Goose Solar CSG | Morrison, IL | 4.0 GWh |
| #3683 | Shrewsbury Solar | Shrewsbury, MA | 4.0 GWh |
| #3684 | CA Dept of Public Health at Richmond | Richmond, CA | 4.0 GWh |
| #3685 | NSF Aurelius Site 2, LLC | Auburn, NY | 4.0 GWh |
| #3686 | Hurricane Creek CSG | Carterville, IL | 4.0 GWh |
| #3687 | Barone | Wurtsboro, NY | 4.0 GWh |
| #3688 | Bear Creek Solar (CA) | Lodi, CA | 4.0 GWh |
| #3689 | Portland SP | BROCTON, NY | 4.0 GWh |
| #3690 | NJMC Landfill | Kearny, NJ | 4.0 GWh |
| #3691 | Segunda II (CSG) | Streator, IL | 4.0 GWh |
| #3692 | CA-DGS RFP-Pleasant Valley State Prison | Coalinga, CA | 4.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Macon Solar Power Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Altona Solar, LLC | Centralia, MO | 65.4 GWh | 37 mi |
| Clarence Cannon | Monroe City, MO | 94.1 GWh | 46.4 mi |
| Columbia (MO) | Columbia, MO | 21.6 GWh | 55.5 mi |
| Columbia Energy Center | Columbia, MO | 13.3 GWh | 52.3 mi |
| Envoy Solar, LLC | Mexico, MO | 107.9 GWh | 52.9 mi |
| High Prairie Wind Farm | Queen City, MO | 674.7 GWh | 44.2 mi |
| JM Huber at Quincy | Quincy, IL | 2.2 GWh | 56.7 mi |
| La Plata | La Plata, MO | 21.0 MWh | 18.3 mi |
| Macon Energy Center | Macon, MO | 80.7 GWh | 4.1 mi |
| Marceline | Marceline, MO | 4.0 MWh | 26 mi |
| Mexico | Mexico, MO | 767.0 MWh | 54 mi |
| MJMEUC Generating Station #1 | Laddonia, MO | 86.7 GWh | 56.1 mi |
| Moberly | Moberly, MO | 34.0 MWh | 23.2 mi |
| Morris Solar | Kirksville, MO | 285.0 GWh | 28 mi |
| MU Combined Heat and Power Plant | Columbia, MO | 203.4 GWh | 56.6 mi |
| Shelbina Power #1 | Shelbina, MO | 14.0 MWh | 22.4 mi |
| Shelbina Power #2 | Shelbina, MO | 58.0 MWh | 22.4 mi |
| Shelbina Power #3 | Shelbina, MO | 36.0 MWh | 22 mi |
| Thomas Hill | Clifton Hill, MO | 7.3 TWh | 17.2 mi |
| Unionville | Unionville, MO | 479.0 MWh | 56.7 mi |