El Dorado Springs Solar Farm
1312 Industrial Parkway East, El Dorado Springs, MO 64744Plant Summary Information
El Dorado Springs Solar Farm is ranked #31 out of 38 solar farms in Missouri in terms of total annual net electricity generation.
El Dorado Springs Solar Farm generated 610.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | El Dorado Springs Solar Farm |
|---|---|
| Utility Name | Missouri Jnt Muni.Pwr Elec. Ut. Comm. |
| Location | Cedar County, MO |
| Initial Operation Date | June 2018 |
| Last Update | Dec 2025 |
| Annual Generation | 3.8 GWh |
| Annual Consumption | 13.8 k MMBtu |
| Ranked #9,051 out of 13,081 Power Plants Nationwide | |
| Ranked #4,179 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #89 out of 127 Missouri Power Plants | |
| Ranked #31 out of 38 Missouri Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
MC Power Companies Inc (2017 to 2022) Missouri Jnt Muni.Pwr Elec. Ut. Comm. (2023 to 2025) |
Map of El Dorado Springs Solar Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for El Dorado Springs Solar Farm.
Monthly Net Generation for El Dorado Springs Solar Farm
Monthly Plant Fuel Consumption for El Dorado Springs Solar Farm
El Dorado Springs Solar Farm Details
| Summary Information | |
|---|---|
| Plant Name | El Dorado Springs Solar Farm (61566) |
| Plant Address | 1312 Industrial Parkway East, El Dorado Springs, MO 64744 |
| Utility | Missouri Jnt Muni.Pwr Elec. Ut. Comm. (12670) |
| Latitude, Longitude | 37.85871, -94.00263 |
| Generation Dates on File | Jun 2018 to Dec 2025 |
| Initial Operation Date | June 2018 |
| Annual Generation | 3.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF18-1130-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of El Dorado Springs - (MO) (5686) MO |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator EDSF1 Details Operating June 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 2.5 MW |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 25 |
| DC Net Capacity | 3.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
El Dorado Springs Solar Farm Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| MPUA | 2200 Maguire Blvd,, Columbia, MO 65201 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4169 | Red Toad 1425 A Powatan Road, LLC | Clayton, NC | 3.8 GWh |
| #4170 | Big Boy | Gibsonville, NC | 3.8 GWh |
| #4171 | Kern A Community Solar, LLC CSG | West Frankfort, IL | 3.8 GWh |
| #4172 | Broadway Road Solar, LLC | Sanford, NC | 3.8 GWh |
| #4173 | KDC Solar TC Little Patuxent WWTP LLC | West Friendship, MD | 3.8 GWh |
| #4174 | Kale Patch Solar | Gervais, OR | 3.8 GWh |
| #4175 | Brodhead Solar, LLC | Moderna, NY | 3.8 GWh |
| #4176 | Mars Hill | Mars Hill, ME | 3.8 GWh |
| #4177 | Mendon | Mendon, MA | 3.8 GWh |
| #4178 | 433 Purchase Solar NG, LLC | Swansea, MA | 3.8 GWh |
| #4180 | CSG Mt. Morris 2, LLC | Mt. Morries, IL | 3.8 GWh |
| #4181 | Cottage Grove South Solar 1, LLC | Beecher, IL | 3.8 GWh |
| #4182 | Cosper Creek Solar (CSG) | Willamina, OR | 3.8 GWh |
| #4183 | Watts 3115 | Adelanto, CA | 3.8 GWh |
| #4184 | Sampson Solar | Roseboro, NC | 3.8 GWh |
| #4185 | Whiteside Solar 1 CSG | Fulton, IL | 3.8 GWh |
| #4186 | Emerald Kemble, LLC | Morristown, NJ | 3.8 GWh |
| #4187 | Conejos 1 Community Solar Array | La Jara, CO | 3.8 GWh |
| #4188 | North Jersey Media Group Solar Facility | Rockaway Township, NJ | 3.8 GWh |
| #4189 | Goldenrod Solar | Pamplico, SC | 3.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding El Dorado Springs Solar Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Butler Municipal Power Plant | Butler, MO | 39.0 MWh | 33.6 mi |
| Butler Solar Power Project | Butler, MO | 4.2 GWh | 34.1 mi |
| Empire Energy Center | Sarcoxie, MO | 143.8 GWh | 50.1 mi |
| Girard | Girard, KS | 41.0 MWh | 51.8 mi |
| Greenbush-Heartland | Girard, KS | 1.9 GWh | 58.6 mi |
| Harry Truman | Warsaw, MO | 267.0 GWh | 42.8 mi |
| Holden | Holden, MO | 222.7 GWh | 61.8 mi |
| Jayhawk Wind Energy Center | Hepler, KS | 684.3 GWh | 57.1 mi |
| John Twitty Energy Center | Springfield, MO | 1.8 TWh | 59.3 mi |
| Kings Point Wind Energy Center | Golden City, MO | 534.5 GWh | 40.8 mi |
| La Cygne | La Cygne, KS | 6.0 TWh | 48.6 mi |
| McCartney | Strafford, MO | 80.6 GWh | 62.1 mi |
| Nevada | Nevada, MO | 15.0 MWh | 18.7 mi |
| Niangua | Camdenton, MO | 536.0 MWh | 63.2 mi |
| North Fork Ridge Wind Energy Center | Mindenmines, MO | 533.7 GWh | 42.7 mi |
| Oak Grove Power Producers | Arcadia, KS | 10.9 GWh | 38.3 mi |
| Prosperity Solar Farm CSG | Joplin, MO | 3.7 GWh | 55.8 mi |
| South Harper | Kansas City, MO | 218.4 GWh | 62.4 mi |
| Springfield Solar 1 LLC | Strafford, MO | 6.9 GWh | 62.4 mi |
| Stockton Hydro | Stockton, MO | 54.7 GWh | 17.1 mi |