Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| KDC Solar TC Little Patuxent WWTP LLC | CleanCapital Holdings | West Friendship, MD | PJM Interconnection, LLC (PJM) | 3.8 GWh | Sep 2022 | Dec 2024 | Solar |
| Gorham Solar 1 (CSG) | CleanCapital Holdings | Gorham, ME | ISO New England (ISNE) | 7.8 GWh | Oct 2023 | Dec 2024 | Solar |
| KDC Solar PR1, LLC | CleanCapital Holdings | Jackson, NJ | PJM Interconnection, LLC (PJM) | 27.1 GWh | May 2019 | Dec 2024 | Solar |
| Steel Sun | CleanCapital Holdings | Lackawanna, NY | New York Independent System Operator (NYIS) | 4.4 GWh | Nov 2016 | Feb 2026 | Solar |
| Edwards Air Force Base | CleanCapital Holdings | Edwards, CA | California Independent System Operator (CISO) | 866.0 MWh | Nov 2011 | Dec 2023 | Solar |
| Acushnet AD Makepeace | CleanCapital Holdings | Wareham, MA | ISO New England (ISNE) | 6.0 GWh | Jun 2012 | Dec 2024 | Solar |
| Acushnet Hawes Reed Road | CleanCapital Holdings | Dartmouth, MA | ISO New England (ISNE) | 1.5 GWh | Jun 2012 | Dec 2024 | Solar |
| Easthampton Landfill-City of Easthampton | CleanCapital Holdings | Easthampton, MA | ISO New England (ISNE) | 2.9 GWh | May 2012 | Dec 2024 | Solar |
| Dartmouth Landfill | CleanCapital Holdings | Dartmouth, MA | ISO New England (ISNE) | 1.7 GWh | Jan 2013 | Dec 2024 | Solar |
| Acushnet-Braley Road 1 | CleanCapital Holdings | Freetown, MA | ISO New England (ISNE) | 2.3 GWh | Dec 2012 | Dec 2024 | Solar |
| Plymouth Site 1 | CleanCapital Holdings | Plympton, MA | ISO New England (ISNE) | 7.2 GWh | Sep 2013 | Dec 2024 | Solar |
| Methuen Landfill | CleanCapital Holdings | Methuen, MA | ISO New England (ISNE) | 1.6 GWh | Jun 2013 | Dec 2024 | Solar |
| Ludlow Landfill | CleanCapital Holdings | Ludlow, MA | ISO New England (ISNE) | 3.4 GWh | Jul 2013 | Dec 2024 | Solar |
| Easton Landfill | CleanCapital Holdings | Easton, MA | ISO New England (ISNE) | 2.5 GWh | Sep 2013 | Dec 2024 | Solar |
| EAFB - South Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2012 | Dec 2024 | Solar |
| EAFB - North Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.6 GWh | Jan 2012 | Dec 2024 | Solar |
| CSD 2 - Heritage High | CleanCapital Holdings | Brentwood, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2013 | Dec 2024 | Solar |
| SDCCD - Miramar | CleanCapital Holdings | San Diego, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2011 | Dec 2024 | Solar |
| CSD 2- Freedom High | CleanCapital Holdings | Oakley, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2013 | Dec 2024 | Solar |
| Acushnet- High Hill | CleanCapital Holdings | Dartmouth, MA | ISO New England (ISNE) | 3.5 GWh | Feb 2013 | Dec 2024 | Solar |
| SDCWA - Twin Oaks | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 1.3 GWh | Apr 2011 | Dec 2024 | Solar |
| EDF Lancaster | CleanCapital Holdings | Lancaster, MA | ISO New England (ISNE) | 5.7 GWh | Jun 2014 | Dec 2024 | Solar |
| Madera Community Hospital | CleanCapital Holdings | Madera, CA | California Independent System Operator (CISO) | 72.0 MWh | Sep 2011 | Dec 2024 | Solar |
| Lepomis PV Energy LLC | CleanCapital Holdings | Plymouth, MA | ISO New England (ISNE) | 7.8 GWh | May 2014 | Dec 2024 | Solar |
| WED Stilson Solar | CleanCapital Holdings | Richmond, RI | ISO New England (ISNE) | 2.9 GWh | Nov 2017 | Dec 2024 | Solar |
| IGS Solar I - BWI5 | CleanCapital Holdings | Baltimore, MD | PJM Interconnection, LLC (PJM) | 2.0 GWh | Nov 2016 | Dec 2024 | Solar |
| WED Kingstown Solar I, LLC - West | CleanCapital Holdings | Richmond, RI | ISO New England (ISNE) | 2.0 GWh | Nov 2017 | Dec 2024 | Solar |
| IGS Solar I - EWR5 | CleanCapital Holdings | Avenel, NJ | PJM Interconnection, LLC (PJM) | 3.6 GWh | Oct 2016 | Dec 2024 | Solar |
| IGS Solar I - EWR6 | CleanCapital Holdings | Avenel, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | Oct 2016 | Dec 2024 | Solar |
| WED Kingstown Solar I - East Array | CleanCapital Holdings | Washington, RI | ISO New England (ISNE) | 4.7 GWh | Nov 2017 | Dec 2024 | Solar |
| KDC Solar CSCP LLC | CleanCapital Holdings | Freehold, NJ | PJM Interconnection, LLC (PJM) | 4.7 GWh | Aug 2019 | Dec 2024 | Solar |
| WED GW Solar, LLC | CleanCapital Holdings | Lincoln, RI | ISO New England (ISNE) | 4.4 GWh | Dec 2018 | Dec 2024 | Solar |
| KDC Solar ASGM | CleanCapital Holdings | Bridgeton, NJ | PJM Interconnection, LLC (PJM) | 6.6 GWh | Jun 2019 | Dec 2024 | Solar |
| Homer Street West | CleanCapital Holdings | Olean, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Apr 2019 | Dec 2024 | Solar |
| Homer Street East | CleanCapital Holdings | Olean, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Apr 2019 | Dec 2024 | Solar |
| Steel Sun 2: 2303-III-9 Hamburg Tpke | CleanCapital Holdings | Lackawanna, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Apr 2019 | Dec 2024 | Solar |
| Steel Sun 2: 2303-III-4 Hamburg Tpke | CleanCapital Holdings | Lackawanna, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Apr 2019 | Dec 2024 | Solar |
| Steel Sun 2: 2303-III-2 Hamburg Tpke | CleanCapital Holdings | Lackawanna, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Apr 2019 | Dec 2024 | Solar |
| Durham AWTF | Clean Water Services | Tigard, OR | Portland General Electric Company (PGE) | 7.4 GWh | Mar 2015 | Feb 2026 | Other Biomass Gas |
| Coronus Adelanto West 2 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.3 GWh | Dec 2014 | Dec 2024 | Solar |
| Tisbury Landfill Solar | Clean Focus Yield, LLC | Tisbury, MA | ISO New England (ISNE) | 1.5 GWh | Jun 2014 | Dec 2024 | Solar |
| Coronus Adelanto West 1 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.3 GWh | Dec 2014 | Dec 2024 | Solar |
| Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.1 GWh | Oct 2018 | Dec 2024 | Solar |
| Dennis Landfill | Clean Focus Yield, LLC | Dennis, MA | ISO New England (ISNE) | 7.9 GWh | Aug 2014 | Dec 2024 | Solar |
| Barnstable Landfill | Clean Focus Yield, LLC | Marstons Mills, MA | ISO New England (ISNE) | 5.3 GWh | Aug 2014 | Dec 2024 | Solar |
| Nunnepog | Clean Focus Yield, LLC | Edgartown, MA | ISO New England (ISNE) | 1.7 GWh | May 2014 | Dec 2024 | Solar |
| Jersey Gardens Phase 1 | Clean Focus Yield, LLC | Elizabeth, NJ | PJM Interconnection, LLC (PJM) | 2.3 GWh | Nov 2011 | Dec 2024 | Solar |
| Brewster Landfill | Clean Focus Yield, LLC | Brewster, MA | ISO New England (ISNE) | 5.3 GWh | Aug 2014 | Dec 2024 | Solar |
| Chatham Landfill | Clean Focus Yield, LLC | Chatham, MA | ISO New England (ISNE) | 2.3 GWh | Aug 2014 | Dec 2024 | Solar |
| Butler Plaza | Clean Focus Yield, LLC | Gainesville, FL | Gainesville Regional Utilities (GVL) | 1.9 GWh | Nov 2010 | Dec 2024 | Solar |
| Harwich Landfill | Clean Focus Yield, LLC | Harwich, MA | ISO New England (ISNE) | 5.7 GWh | Jul 2014 | Dec 2024 | Solar |
| Katama Farm | Clean Focus Yield, LLC | Edgartown, MA | ISO New England (ISNE) | 1.5 GWh | May 2014 | Dec 2024 | Solar |
| CEC Solar #1117, LLC | Clean Focus Renewables, Inc. | Pueblo, CO | Public Service Company of Colorado (PSCO) | 4.1 GWh | Jul 2018 | Oct 2024 | Solar |
| Reventure Park | Clean Energy LLC | Charlotte, NC | Duke Energy Carolinas (DUK) | 23.6 GWh | Jun 2014 | Dec 2024 | Landfill Gas |
| Clean Energy Future-Lordstown, LLC | Clean Energy Future-Lordstown, LLC | Lordstown, OH | PJM Interconnection, LLC (PJM) | 6.4 TWh | Sep 2018 | Feb 2026 | Natural Gas |
| OR - Solops - SPI 18 - Clayfield | Clayfield Solar, LLC | Estacada, OR | Portland General Electric Company (PGE) | 202.0 MWh | Sep 2024 | Dec 2024 | Solar |
| Clay FC | Clay FC, LLC | Louisville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Jun 2021 | Dec 2024 | Solar |
| Claverack Creek Solar | Claverack Creek Solar, LLC | Hudson, NY | New York Independent System Operator (NYIS) | 895.0 MWh | Sep 2024 | Dec 2024 | Solar |
| Clarkstown Landfill Solar Facility | Clarkstown Solar LLC | West Nyack, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2014 | Dec 2024 | Solar |
| Crossroads Energy Center | Clarksdale Public Utilities | Clarksdale, MS | Midcontinent Independent System Operator, Inc. (MISO) | 124.0 GWh | Jun 2002 | Nov 2024 | Natural Gas |
| Clark University | Clark University | Worcester, MA | ISO New England (ISNE) | 4.4 GWh | Dec 2012 | Dec 2024 | Natural Gas |
| Clark Road Solar 1, LLC | Clark Road Solar 1, LLC | Gardner, MA | ISO New England (ISNE) | 8.7 GWh | Nov 2020 | Dec 2024 | Solar |
| Clarendon Solar Farm | Clarendon Solar Farm, LLC | North Clarendon, VT | ISO New England (ISNE) | 3.0 GWh | Jun 2014 | Dec 2024 | Solar |
| Clara City Solar | Clara City Solar LLC | Clara City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Aug 2019 | Dec 2024 | Solar |
| Syncarpha Clara City CSG I (Stamer) | Clara City CSG I, LLC | Clara City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Claire Solar Farm | Claire Solar Partners LLC | South Burlington, VT | ISO New England (ISNE) | 3.6 GWh | Jun 2014 | Dec 2024 | Solar |
| CityCenter Central Plant Cogen Units | CityCenter Land LLC | Las Vegas, NV | Nevada Power Company (NEVP) | 61.4 GWh | Nov 2009 | Feb 2026 | Natural Gas |
| Jonesboro CWL Solar Park | City Water and Light Plant | Jonesboro, AR | Midcontinent Independent System Operator, Inc. (MISO) | 22.1 GWh | May 2022 | Dec 2024 | Solar |
| Jonesboro City Water & Light Plant | City Water and Light Plant | Jonesboro, AR | Midcontinent Independent System Operator, Inc. (MISO) | 78.0 GWh | Jun 1999 | Dec 2024 | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
| McCartney | City Utilities of Springfield - (MO) | Strafford, MO | Southwest Power Pool (SWPP) | 111.7 GWh | Jun 2002 | Dec 2024 | Natural Gas |
| John Twitty Energy Center | City Utilities of Springfield - (MO) | Springfield, MO | Southwest Power Pool (SWPP) | 1.9 TWh | May 1976 | Feb 2026 | Subbituminous Coal : 96.8% Natural Gas : 3.2% |
| James River Power Station | City Utilities of Springfield - (MO) | Springfield, MO | Southwest Power Pool (SWPP) | 83.4 GWh | May 1957 | Feb 2026 | Natural Gas : 86.5% Distillate Fuel Oil : 13.5% |
| Municipal Power Plant | City of Zeeland - (MI) | Zeeland, MI | Midcontinent Independent System Operator, Inc. (MISO) | 63.0 MWh | May 2002 | Dec 2024 | Natural Gas |
| Riley Generating Station | City of Zeeland - (MI) | Zeeland, MI | Midcontinent Independent System Operator, Inc. (MISO) | 169.0 MWh | Jun 2006 | Dec 2024 | Natural Gas |
| Wrangell | City of Wrangell - (AK) | Wrangell, AK | 518.0 MWh | May 1987 | Dec 2024 | Distillate Fuel Oil | |
| Worthington | City of Worthington - (MN) | Worthington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Jan 2002 | Dec 2024 | Wind : 98.9% Distillate Fuel Oil : 1.1% |
| Worcester Landfill | City of Worcester DPW | Worcester, MA | ISO New England (ISNE) | 8.2 GWh | Apr 2017 | Dec 2024 | Solar |
| Thundermist Hydro | City of Woonsocket | Providence, RI | ISO New England (ISNE) | 90.0 MWh | May 1981 | Dec 2024 | Water |
| Anadarko | City of Woodsfield - (OH) | Woodsfield, OH | PJM Interconnection, LLC (PJM) | 42.0 MWh | Dec 1948 | Dec 2024 | Distillate Fuel Oil |
| Wisner | City of Wisner | Wisner, NE | Southwest Power Pool (SWPP) | 81.0 MWh | Apr 1969 | Dec 2024 | Distillate Fuel Oil |
| Winterset | City of Winterset - (IA) | Winterset, IA | Midcontinent Independent System Operator, Inc. (MISO) | 35.0 MWh | Jun 1956 | Dec 2024 | Natural Gas : 55.9% Distillate Fuel Oil : 44.1% |
| West 14th Street | City of Winfield - (KS) | Winfield, KS | Southwest Power Pool (SWPP) | 1.3 GWh | Jul 1962 | Dec 2024 | Natural Gas |
| Waste Water Plant Generator | City of Winfield - (KS) | Winfield, KS | Southwest Power Pool (SWPP) | 6.0 MWh | Feb 1993 | Dec 2024 | Distillate Fuel Oil |
| East 12th Street | City of Winfield - (KS) | Winfield, KS | Southwest Power Pool (SWPP) | 6.7 GWh | May 1970 | Dec 2024 | Natural Gas : 99.9% |
| Windom | City of Windom | Windom, MN | Midcontinent Independent System Operator, Inc. (MISO) | 23.0 MWh | May 1980 | Dec 2024 | Distillate Fuel Oil |
| Wilton | City of Wilton - (IA) | Wilton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 MWh | Dec 1991 | Dec 2024 | Distillate Fuel Oil |
| Wilber | City of Wilber | Wilber, NE | Southwest Power Pool (SWPP) | 24.0 MWh | Dec 1959 | Dec 2024 | Distillate Fuel Oil |
| Westbrook | City of Westbrook | Westbrook, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 MWh | Sep 2003 | Dec 2024 | Distillate Fuel Oil |
| West Point Municipal | City of West Point - (NE) | West Point, NE | Southwest Power Pool (SWPP) | 109.0 MWh | Apr 1947 | Dec 2024 | Natural Gas : 65.7% Distillate Fuel Oil : 34.3% |
| City of West Plains Power Station | City of West Plains - (MO) | West Plains, MO | Southwest Power Pool (SWPP) | 4.0 GWh | Apr 2000 | Dec 2024 | Natural Gas : 59.7% Distillate Fuel Oil : 40.3% |
| West Liberty | City of West Liberty - (IA) | West Liberty, IA | Midcontinent Independent System Operator, Inc. (MISO) | 38.0 MWh | Sep 1974 | Dec 2024 | Distillate Fuel Oil |
| West Bend | City of West Bend | West Bent, IA | Midcontinent Independent System Operator, Inc. (MISO) | 174.0 MWh | Nov 1954 | Dec 2024 | Distillate Fuel Oil |
| Wells IC | City of Wells - (MN) | Wells, MN | Midcontinent Independent System Operator, Inc. (MISO) | 180.0 MWh | Oct 1950 | Dec 2024 | Natural Gas : 64.3% Distillate Fuel Oil : 35.7% |
| Wellington 1 | City of Wellington - (KS) | Wellington, KS | Southwest Power Pool (SWPP) | 6.5 GWh | Jul 1972 | Dec 2024 | Natural Gas : 99.9% |
| Wellington 2 | City of Wellington - (KS) | Wellington, KS | Southwest Power Pool (SWPP) | 2.4 GWh | Dec 1988 | Dec 2024 | Natural Gas |
| Webster City | City of Webster City - (IA) | Webster City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 809.5 MWh | Mar 1972 | Dec 2024 | Distillate Fuel Oil |
| Wayne IC | City of Wayne | Wayne, NE | Southwest Power Pool (SWPP) | 43.0 MWh | Dec 1946 | Dec 2024 | Distillate Fuel Oil |
| Watertown | City of Watertown - (NY) | Watertown, NY | New York Independent System Operator (NYIS) | 28.0 GWh | Jul 1924 | Oct 2024 | Water |
| Waterloo | City of Waterloo - (IL) | Waterloo, IL | Midcontinent Independent System Operator, Inc. (MISO) | 491.0 MWh | May 1946 | Dec 2024 | Natural Gas : 68.9% Distillate Fuel Oil : 31.1% |
| Washington City Electric Generation | City of Washington - (UT) | Washington, UT | PacifiCorp East (PACE) | 5.7 GWh | Apr 2007 | Dec 2024 | Natural Gas |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |